Notice of Issuance of Amend to License NPF-82 & Final Determination of Nshc.Amend Revised Paragraph 2.E
ML20043J089
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 06/14/1990
From: Butler W
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20043J081 List:
References
NUDOCS 9006270268
Download: ML20043J089 (3)


Text

~

i t

7590-01 l

U. S. NUCLEAR REGULATORY COMMISSION LOFG ISLAND LIGHTING COMPANY DOCKET N0. 50-322 NOTICE OF ISSl!ANCE OF AMENDMENT TO FACILITY OPFPATING LICENSE AND FINAL DETERMINAT10N OF NO $1GNIFICAtiT HA7ARDS CONSIDERATION j

The 11. S. Nuclear Regulatory Comission (Comission) has issued Amendment i

No.

4 te Facility Operating License No. NPF 82, issued to long Island Lighting Company (LILC0) (the licensee), which revised the Technical Specifications for operation of the Shoreham Nuclear Pow'er Station, Unit 1

. (the facility) located in Suffolk County, New York. The amendment was effective as of the date of its issuance.

The amendment revised paragr6ph 2.E to the Shoreham license allowing reclassification of certain vital areas and other modifications which allows LILCO to reduce the size of the Shoreham facility's security force.

The application for the amendment complies with the standards and 3

requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission'c rules and regulations in 10 CFR Chapter 1, which are set forth in the license amendment.

Notice of Consideration of Issuance of Amendment and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing in connection with this action was published in the FEDERAL REGISTER on bNk$0$$

u-

+

y n,

,-.----w,,

t c

4

.p.

March 21,1990(55FR10540). A request for a hearing was filed on April 20, t

1990 by the Shoreham-Wading River Central School District and the Scientists and Engineers for Secure Energy, Inc.

Under its regulations, the Commission may issue and make an amendment immediately effective, notwithstanding the pendency before it of a request for a hearing from any person, in advance of the holding and ccmpletion of any required hearing, where it hes determined that no significent hazards consideration is involved.

The Commission has applied the star.dards of IL CFR 50.92 and has made a final datermination that the amendment involves no significant hazards consideration. The basis for this determination is contained in the Sefety Evaluation related to this action. Accordingly, as described above, the amendment has been issued and made inmediately effective and any hearing will be held after issuance.

The ComrAssion has determined that this amendment saticfies the criteria for categorical exclusion in accordance with 10 CFR 51.22.

Therefore, pursuant E

to 10 CFR 51.22(b), no environmental impact statement or environmental P

assessment need be prepared for this amendmet.t.

Forfurtherdetailswithrespecttotheactionsee(1)theapplication for amendment dated January 5,1990 and supplemented by letter dated April 5, 1990, the supplemental letter did not change the original intent of the t

application request and did not affect the staff's original no significant hazardsdetermination.(2)AmendmentNo.

4 to Facility Operating License No. NPF.82, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's public

I 1

3 Document Room, 2120 L Street, N. W., Washington, D. C., and at the Shotthem-Wading River Public Library, Route 25A, Shoreham, New York 11786-9697. A copy of items (2) and (3) may be obtained upon request addressed to the j

U.S. Nuclear Regulatory Comission, Washington, D. C.

20555, Attention:

Director, Division of Reactor Projects 1/11.

]

Dated at Rockville, Maryland this.

14 day of June 1990.

FOR THE NUCLEAR REGULATORY COMMISSION 4

d Walter R. Butler, Director Project Directorate 1-2 1

Division of Reactor Projects - I/11 Office of Nuclear Reactor Regulation

.-