ML20043H724

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-346/OL-90-01 Administered on 900515-24.Requalification Program Rated Satisfactory.Weakness Noted in Knowledge of Steam Feed Rupture Control Sys.Next Exam Scheduled for Nov 1991
ML20043H724
Person / Time
Site: Davis Besse 
Issue date: 06/19/1990
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20043H725 List:
References
NUDOCS 9006260360
Download: ML20043H724 (2)


Text

_ ___

JUN 191333 Docket No. 50-346 Toledo Edison Company ATTH: Mr. Donald Shelton Vice President e

Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

l

SUBJECT:

REQUAllflCATION EXAMINATION REPORT

]

During May 15-24, 1990, the NRC administered requalification examinations to employees of your organization who operate your Davis-Besse Nuclear Power Plant.

At the conclusion of the examination, any generic. findings that evolved as a result of the examinations were discussed with those members of your staff J

identified in the enclosed report.

z As a result of this evaluation of your requalification program it has been assigned an overall program rating of satisfactory in accordance with the criteria of NUREG-1021. ES 601. For those individuals with unsatisfactory results, the facility should take corrective action as required by its NRC approved requalification program.

As a result of the examinations, a weakness was noted in knowledge of the Steam feed Rupture Control System (SFRCS) as demonstrated during the job Performatice Measures (JPM) questions and the written examination.

This weakness is forwarded for input into the Davis-Besse SAT requalification program and the fecility is requested to inform the region within 30 days of dctions to be taken to incorporate SFRCS in the requalification program.

The NRC has scheduled the next NRC Requalification Cxamination for November 1991 to coincide with the licensee's requalification schedule. This schedule change is in accordance with the request in the licensee's letter to Dr. Murley of April 20, 1990 and is contingent upon a plont specific simulator on site or asi approved alternate backup facility being available.

In acordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter ano the enclosure will be placed in the NRC Public Document Room, a

9006260360 900619 6

DR ADOCKOSCoj,

/

bi Toledo Edison Company 2

M 10 Should you have any questions concerning this examination, please contact'us.:

Sincerely,-

4 cp,jgu(At SICt:ED Bf Ct0f fm C. W!ttGHI-

~ Geoffrey C. W'right, Chief Operations Branch

Enclosures:

1.

Examination Report

_No. 50-346/0L-90-01 Examination (s))and(SR0/RO) 2.

Answer Key (s cc w/ enclosures:

L. Storz, Plant Manager DCD/DCB (RIDS)

Licensing fee Management Branch Resident inspector, Rlli James W. Harris, State of 0hio Robert E. Owen, Ohio Department of Health A. Grandjean, State of Ohio, Public Utilities Commission-R. Simpkins, Plant' Training Manager T. V. Wambach, Project Manager, NRR C. Kvanne, Contract Exam Supervisor, INEL h

J

.2 Vt'S R1 1(0-Rlll 1:

e'7#

- Rill m-ins

~@

6/(/90'tviceIto Shepard /cg DBu dick

.Jcw r ht o

- 6/17/90 6/{5/90 6//9/90 y

gc3 j

.