ML20043G720
| ML20043G720 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/11/1990 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Schnell D UNION ELECTRIC CO. |
| References | |
| NUDOCS 9006210054 | |
| Download: ML20043G720 (2) | |
Text
p u)
.i' L
JUN -1 1 1990 Docket No. 50-483' b-.
Union Electric Company ATTN: Mr. Donald F. Schnell Senior Vice-President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, MO 63166 Gentlemen:
AFitness-For-Duty (FFD)-inspectionisscheduledtobeconductedatthe Callaway County Nuclear Power Station the week of July 24-27, 1990.
Ms. Gail'Christoffer of this office has been designated as the primary contact for this inspection and can be contacted at telephone number (708) 790-5744, t
As part of the inspection process, FFD written policies and procedures will be reviewed in the NRC Region III office prior to the onsite inspection. You are requested to provide us a copy of the procedures and policies pertaining to-your FFD program. These documents will be returned to'you or destroyed, if requested, after the inspection report has been prepared. Any of the documents that are considered as exempt from public disclosure in accordance with-10 CFR 2.790 should be identified as such and a statement of the reasons for nondisclosure should also be provided as. required by '10 CFR 2.790(b).
[
The FFD policies and procedures should be provided to us by June 25, 1990.
.FFD training material will be reviewed onsite and does not have to be'sent to us.
During the inspection,. interviews will be conducted with the onsite FFD manager, the medical review officer, the Employee Assistance-Program manager, and' personnel responsible for the onsite collection and, if appropriate, onsite testing facility.
If feasible, please contact Ms. Christoffer by July 10, 1990, to arrange an interview schedule for the above personnel.
Interviews of randomly selected licensee employees and contractors will also be conducted during the onsite inspection. A room to-conduct the interviews will be-required.
'FFD program audits and program records (including training records, personnel
. records for FFD program personnel, records of pre-access authorization inquiries, executed contracts with contractors / vendors, and records of chemical test results and appeals, etc) should be available for review.
If
.any of these: records are located offsite, please inform Ms. Christoffer as soon as practical.
- gngs
- s8WA
/I ' '
a O
a j
FT i
c!
z-
,E..
Union' Electric Company-2 JUN 1 1 1990 i
E
.You are also requested-to identify a single onsite or corporate licensee representatives to act av the point of contact in reference to the items discussed above.
Please advise Ms. Christoffer of that individual's name t
and telephone number as early as practical.
t Thank you for your assistance in this matter.
If you nave any questions, please contact me or Ms. Christoffer at (708) 790-5744.
Sincerely, 9
s
. Ro ert Greger, Chief Reactor Programs Branch cc:
G. L. Randolph, General Manager,
-Nuclear. Operations J. V. Laux,: Manager Quality 4
Assurance Tom P. Sharkey Supervising Engineer, Site Licensing DCD/DCB-(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Region IV Resident Inspector, Wolf Creek K. Drey Chris R. Rogers, P.E..
Utility Division, Missouri-Public-Service Commission-CFA Inc.
Gerald:Charnoff, Esq.
Thomas Baxter, Esq.
R. A. Kucera, Deputy Director, Department of Natural Resources t
[
I RIII RIII RI I RI
,,,t,.,,p e.
. u sto,,., e
-z 06/8/90
- )0 WB L
m