c JUN ! 1 1993 Docket No. 50-461 1111nois Power Company ATTN. Mr. J. Perry Vice President Clinton Power Station Mail Code V-275 P.O. Box 678 Clinton, IL 61727 F
Gentlemen:
A Fitness-For-Duty (FFD) inspection is scheduled to be conducted at the Clinton Power Station the week of July 17-20, 1990.
Mr. Terry Madeda of this office has been designated as the primary contact for this inspection and can be contactedattelephonenumber(708)790-5521.
As part of the inspection process, FFD written policies and procedures will be reviewed in the NRC Region 111 office prior to the onsi+.e inspection.
You are requested to provide us a copy of the procedures and policies pertaining to your FFD program. These documents will be returned to you or destroyed, if requested, after the inspection report has been prepared. Any of the documents that are considered as exempt from public disclosure in accordance with 10 CFR 2.790 should be identified as such and a statement of the reasons for nondisclosure should also be provided as required by 10 CFR 2.790(b).
The FFD policies and procedures should be provided to us by June 29, 1990.
FFD training material will be reviewed onsite and does not have to be sent to c
us.
During the inspection, interviews will be conducted with the onsite FFD manager, the medical review officer,'the Employee Assistance Program manager, and personnel responsible for the onsite collection and, if appropriate, onsite testing facility.
If feasible, please contact Mr. Madeda by July 3, 1990, to arrange an interview schedule for the above personnel.
Interviews of randomly selected licensee employees and contractors will also be conducted during the onsite inspection. A room to conduct the interviews will be required.
FFD program audits and program records (including training records, personnel records for FFD program personnel, records of pre-access authorization inquiries, executed contracts with contractors / vendors, and records of chemical test results and appeals, etc) should be available for review.
If any of these records are located offsite, please inform Mr. Madeda as soon as practical.
e3
/<
h'
/
9006210050 900611 Or I
h PDR ADOCK 050004 1 1
tp
(
d 4
3-Illinois Power Company 2
g g g 1999 L
You are also requested to identify a single onsite or. corporate licensee
. representatives to act'as the point of. contact in reference to the items.
j, discussed above.
Please' advise Mr. Madeda'of that individual'_s name and-telephone number as early as practical.
' Thank you for your assistance in this matter.
If you have any questions, please contact me or Mr. Madeda at (708) 790-5521.
Sincerely, l
L. Robert Greger, Chief j-.-
Reactor Programs Branch cc:
J. Cook, Manager, Clinton Power Station F. Spangenberg, III, Manager -
Licensing and Safety
+
I DCD/DCB(RIDS)
Licensing Fee Management Branch Resident Inspector, Rlll
- J. McCaffrey, Chief, Public Utilities Division
.H. Taylor,: Quality Assurance Division, Sargent & Lundy Engineers Patricia O'Brien, Governor's Office of Consumer Services
[' "
S.'Zabel, Esquire, Schiff, Hardin,
& Waite L. Larson.-Project Manager.
-General Electric Company Chairman,.DeWitt County Board g
'1111nois Department of Nuclear Safety Robert Newmann, Office of Public Counsel, State of Illinois Center Perry SRI
- 1; I
P t1e p C ed-deda Lank bury r
06/ 8 /
{,
6W
.