Forwards Safety Insp Rept 50-336/90-06 on 900306-0416.No Violations Noted.Ack 890918,900329,0406 & 0409 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-336/89-16,50-336/89-22 & 50-336/89-24
ML20043G326
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/11/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20043G327 List:
References
NUDOCS 9006200157
Download: ML20043G326 (2)


See also: IR 05000336/1990006

Text

t

e-

.a.

,

,,

~'

e.

i

W

i

JUN 111990

Docket No. 50-336

,

Northeast Nuclear Energy Company

ATTN:

Mr. Edward J. Mroczka

Senior Vice President - Nuclear

l

Engineering and Operations

P.O. Box 270

Hartford, Connecticut

06141-0270

Gentlemen:

Subject:

NRC Region Inspection No. 50-336/90-06

This refers to the routine resident safety inspection conducted by

Mr. P. Habighorst of this office on March 6 - April 16, 1990 at Millstone

Nuclear Power Station, Unit 2, Waterford, Connecticut of activities authorized

by NRC License No. DPR-65 and to the discussions of our findings by

Mr. Habighorst with Mr. Keenan of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

inspection report which is enclosed with this letter. Within those areas, the

inspection consisted of observation of activities, interviews with personnel,

measurements, and document reviews.

We have received your letters dated September 18, 1989, March 29, 1990,

April 6,1990 and April 9,1990, in response to our inspection reports

50-336/89-16, 50-336/89-22, and 50-336/89-24.

Thank you for in'orming us of

the corrective and preventive actions documented in those letters. Your

actions will be examined during future inspections of your licensed program.

Your cooperation with us is appreciated.

i

Sincerely,

ORIGINAL 5 GMCD BY:

Edward C. Wenzinger, Chief

Projects Branch No. 4

'

Division of Reactor Projects

Enclosure:

NRC Region I Inspection Report No. 50-336/90-06

9006200157 900611

PDR

ADOCK 05000336

G

PNV

\\\\

l

0FFICIAL RECORD COPY

IR MILL 2 90-06 - 0001.0.0

06/11/90

'-

,

,,

,

,

L

F

Northeast Nuclear Energy Company

2

JUN 111990

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

'

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Nuclear Station Director, Millstone $tttion

J. S. Keenan, Nuclear Unit Director, Millstone Unit 2

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

!

bec w/ enc 1:

Region 1 Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

W. Raymond, SRI, Millstone

G. Vissing, NRk

R. Paolino, DRS (See Section 3.7.1, and 10.1)

J. Wiggins, DRP

bec w/ Executive Summary only:

W. Kane, DRP

J. Wiggins, DRP

W. Hodges, DRS

W. Johnston, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

R. Cooper, DRSS

R. Bellamy, DRSS

J. Stolz, NRR/PDI-4

!

l

l

RI:DRP

RI:DRP

RI:DRP

R

Habighorst

Raymond

Vegel

ci ger

06/ /90

06/ /90

06/ /90

06/l(/90

l

0FFICIAL RECORD COPY

IR MILL 2 90-06 - 0002.0.0

06/11/90

i