UNIT 1 OPERATING DATA REPORT occ*************************************************************************
Docket No. 50-317 June 12, 1990 Prepared by Carl Behnke Telephonet(301)260-4871 OPERA.TI.N.G S.TA.TUS
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD MAY 1990
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANCE IN CAPACITY RATINGS none
- 9. POWZR LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 3,623 132,060
- 12. HUMBER OV HOURS REACTOR WAt CRITICAL 0.0 241.9 94,834.2 l
- 13. REACTOR RESERVE SHUTDOWN HOURS 00 0.0 3,019.4 j
- 14. HOURS GENERATOR ON LINE 0.0 194.3 92,642.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 257,923 232,949,173
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 76,132 77,495,249
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 67,189 73,612,999
- 19. UNIT SERVICE FACTOR 0.0 5.4 70.2
- 20. UNIT AVAILABILITY FACTOR 0.0 5.4 70.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 2.2 67.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 2.2 66.0
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 9.6
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT j
SIX MONTHS (TYPE, DATE AND DURATION):
l N/A
{
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
July 23, 1990 i
I l
900620000s 900612 l
PDR ADOCK 0r.00 R
_y UNIT SHUT 00UNS AND POWER REDUCTIONS DOCKET NO. 50-317 UNIT NAME CalvertCliffs-t[1 DATE June 12. 1990 COMPLETED BY Carl Behnke REPORT MONTH May 1990 TELEPHONE (301)?60-4871 METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE I
2 NO.
DATE TYPE (HOURS)
REASON DOWN EVENT ACTION TO 3
REACTOR REPORT f CODE CODE PREVENT RECURRENCE 90-08 900501 S
744 B
N/A N/A Continued with shutdown for scheduled maintenance outage for Steam Generator Eddy Current testing.
i 1
2 3
0 F:
Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensc C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL coo *********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 June 12, 1990 Completed by Carl Behnke Telephone: (301) 260-4871 MAY 1990 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
1 9
0 25 0
10 0
26 0
11 0
27 0
l 12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
l 16 0
l l
l l
a j
t i
+
DOCKET f 50 317-CALVERT CLIFFS - UNIT 1 June 12, 1990
SUMMARY
OF OPERATING EXPERIENCE
')
May 1990 The. unit began the month in a continuation of the scheduled 10 week outage for Steam Cenerator Eddy Current testing,.
The unit is expected to restart on July 23, 1990.
3, I
d
+
e f
h
~!
- n.
h i
[
'i l -:.
f l-l i
h i
-i
.1
?
,i June 12, 1990 REFUELING INFORMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2.
Scheduled date for next refueling shutdown:
September 15, 1991 3.
Scheduled date for restart following refueling: November 26, 1991 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a higher enriched (4.2%) reload batch and reshuffled core for Unit l's next 24 month cycle.
l-5.
Scheduled date(s) for submitting proposed licensing action and I
supporting information.
Hay 12, 1991
( reload submittal )
- 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to reload fuel inserted into the previous cycle except for the higher enrichment ( 4.2% ).
- 7.
The r. umber of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(~ )
217 (b) 1543 a
Spent fuel pools are common to Units 1 and 2.
i l
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the i
size of any increase in licensed storage capacity that has been I
requested or is planned, in number of fuel assemblies.
(a) 1830 (b) 2880 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and ma'intaining space for one full core off-load.
September 1993
- Entry has changed since last reported.
l l
000*************************************************************************
UNIT 2 OPERATING DATA REPORT ooo*************************************************************************
Docket No. 50-318 June 12, 1990 Prepared by Carl Behnke Telephonet(301)260-4871 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD MAY 1990
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulativet This month Year-to-Date to Dats
.11. HOURS IN REPORTING PERIOD 744 3,623 115,415
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 87,437.3 113. KEACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 2,296.6
- 14. HOURS GENERATOR ON LINE 0.0 0.0 80,228.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS' THERMAL ENERGY GENERATED (MWH) 0 0 218,389,418 i
- 17. GROSS ELECTRICAL ENERGY CEN'TED(MWH) 0 0
72,284,632
- 18. NET ELECTRICAL ENERGY GENERATED (HWH) 0 0
69,042,571
.19. UNIT SERVICE FACTOR 0.0 0.0 74.7
- 20. - UNIT AVAILABILITY FACTOR 0.0 0.0 74.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 0.0 72.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 0.0 70.8
- 23. UNIT, FORCED OUTAGE RATE 0.0 0.0 5.3 l
l
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS-(TYPE, DATE AND DURATION):
N/A
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
December 31, 1990 l-
IMIT SHUTDOWNS AND POUFJL REDUCTIONS DOCKET NO. 50-318 UNIT NAME Calvert Cliffs-U2 DATE June 12. 1990 COMPLETED BY Carl Behnke REPORT MONTH May 1990 TELEPHONE (3013260-4871 METHOD OF DURATION SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1
2 NO.
DATE TYPE (HOURS)
REASON DOWN EVENT ACTION TO 0
REACTOR 8 REPORT #
CODE CODE PREVENT RECURRENCE 90-05 900501 S
744 C
N/A N/A Continued shutdown for 8th Cycle Refueling Outage.89-007 CA HEATER Pressurizer work continued.
The outer sleeve installation is fully completed.
i l
1 2
3 F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for License C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Extraination F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
H-Other (Explain)
~
1 AVERAGE DAILY UNIT POWER LEVEL coo *********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 1
June 12, 1990 Completed by Carl Behnke Telephonet (301) 260-4871 MAY 1990 Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
1
l 1-.z t
r x
i j
- i i
I r
' DOCKET d 50 318 CALVERT CLIFFS : UNIT 2 June 12, 1990 I
v
SUMMARY
OF OPERATING EXPERIENCE l
May 1990
-j The unit began the month in a continued shutdown for the 8th cycle Refueling Outage.
Pressurizer work continued.' The outer sleeve installation was completed. The y
upper penetration nozzles installation-is in progress.
j t
The unit is scheduled to return to service by December 31, 1990.
r f
?
?
t 5
)
L
-3 5
1 e
t a,
~
L June 12, 1990 EBIELING INFORMATION REQUEST 1.
Name of facility:
Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2.
Scheduled date for next refueling shutdown: Narch 20, 1989 **
3.
Scheduled date for restart following refueling: December 31, 1990 4.
Will refueling or resumption of operation thereafter require a 'echnical Specification change or other license amendment?
Unit reload license and necessary technical specification changes are approved. The Unit is in an extended refueling shutdown to support system maintenance.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
Unit reload license has been approved.
The Unit is an and extended refueling shutdown to support system maintenance.
6.
Important licensing considerations associated with the refueling, keload fuel will be similar to reload f oal inserted inte the previous cycle except for the 4.3% enrichment, debris resistant fuel design, and four fuel assemblies containing an alternative burnable absorber.
Changes will be made to the on line incore monitoring program.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 0 (b) 1543 Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage casacity, and (b) the size of any increase in licensed storage capacity t1at has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b) 2880 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
September 1993 Entry has changed since last reported.
Unit currently in refueling shut down l