-.7 June 8, 1990 i
The Honorable Pete Wilson United States Senate Washington, D.C.
20510
Dear Senator Wilson:
I am responding to y7;r letter of May 15, 1990, in which you requested information regarding the operation of Southern California Edison Company's (SCE) San Onofre Nuclear Generating Station. You referred to correspondence that you had received from Mrs. Katherine Crain of Vista, California, who expressed concern over inefficient plant operation, drug use, and personnel qualification.
The U.S. Nuclear Regulatory Comission (NRC) is responsible for ensuring that commercial nuclear power facilities are operated safely. To satisfy this responsibility, the NRC has established certain requirements with which the commercial nuclear power industry must com)1y. Among these are requirements for utilities to conduct screening and baccground investigations of job applicants and to perform drug testing of new and current employees.
Additionally, training and qualification requirements are specified for-reactor plant operators, maintenance personnel, and other employees who are critical to safe nuclear power plant operation.
Several NRC representatives are stationed at the San Onofre site to monitor plant operations and to ensure that SCE is complying with NRC regulations and requirements. Additionally, other NRC representatives routinely conduct unannouu:ed inspections at San Onofre. Based on our inspection and oversight activities at San Onofre, we are satisfied that the San Onofre Nuclear Generating Station is being managed and operated in a safe and responsible manner.
NRC does not regulate the efficiency of nuclear power plants.
Our concern is that the plants operate safely and we believe safety and efficiency can be compatible.
With respect to substance abuse the NRC has required nuclear utilities to establish and implement effective drug testing programs. We have reviewed the program being implemented at San Onofre and view it to be effective.
I hope this is responsive to your request.
Sincerely.
Onginal Signed By:
Ja N.
ylor Executive Director for Operations
- See previous concurrence DRSP/PDV DRSP/PDY TECH ED (A)DRSP/D:PDV (A)NRR/ADR5 PShea*
JTatum*
JMain*
JLarkins*
JZwolinski*
5/29/90 5/29/90 5/29/90 5/29/9 5/29/90
~l NRR/DRSP ADP NRR/DONRR GPA/CAh, )
GHolahan*
JPartlow*
TMurley*
J a. <1 r
[)/E 5/29/90 5/29/90 5/30/90
/90 6/P/90 i
9 9006 iso 279 9oo60s
-$ b' ADOCK0500g6 DR
} '.
The Honorable Pete Wilson '
With res)ect to substance abuse the NRC has required nuclear utilities to establisi and implement effective drug testing programs. We have reviewed the program being implemented at San Onofre and view it to be effective.
If you have any further questions or concerns regarding plant operation at San Onofre, please contact me.
Sincerely, James M. Taylor Executive Director for Operations DISTRIBUTION DocketFile(50-206)w/ incoming NRC PDR w/
of incoming Local PDR w/cy of incoming T. Mur1.ey)/F Miraglia EDO #054 EDO Reading W. Russell F. G 1espie J. Partlow D.
tchfield J. Roe P
Reading w/cy of incoming G. Holahan X Zwolinski OGC GPA/CA SECY C. Satyre, PMAS (ED0f 05485) w/cy incoming M. Krebs J. Tatum w/cy of incoming LA PD 5 Green Ticket File R. Zimmerman, RV J. Martin, RV
- See previous con rrence DRSP/PDV*
RSP/PDV*
TECH ED.*
(A)DRSP/D:PDV (A)NRR/ADRS PShea JTatum:sg JMain JLarkins*
JZwolinski*
5/29/90 5/29/90 5/29/90 5/29/90 5/29/90 NRR/DRP ADP NRR/DONRR EDO GPA/CA GHo14Kan*
JPartlow*
TMurley*
JTaylor 5/ 9'/90 5/29/90 5/30/90 5/ /90 5/ /90
[ GREEN TICKET 05485]
)
The Honorable Pete Wilson The determination of plant operating efficiency is somewhat subjective and can be measured in several different ways. Typically, if a plant requires outages of long duration to repair or replace equipment, it does not ope, ate as r
efficiently as a plant that requires fewer outages of shorter du^ ration.
For San Onofre Unit 1 SCE has typically required longer duration /utages to satisfy certain NRC requirements. WhiletheselongerduratJonoutagesreduce plant operating efficiency, the reduced efficiency does n t indicate unsafe operation.
It is unfortunate that substance abuse continues to b a problem in our society.
We have addressed this problem in the nuclear indus y by requiring nuclear utilities to establish and implement effective dru testing programs. We have reviewed the program being implemented at San On re and view it to be effective.
Unfortunately, because substance abuse is one o the realities of our society.
such measures must be taken to ensure safe p1 t operation.
If you have any further questions or concer s regarding plant operations at San Onofre, please contact me.
Sin rely, James M. Taylor Executive Director for Operations DISTRIBUTION DocketFile(50-206)w/inco ng NRC PDR w/cy of incoming J. Roe, DLPQ Local PDR w/cy of incomin ED0 #05485 EDO Reading T. Murley/F Miraglia W. Russell F. Gillespie J. Partlow D. Crutchfield J. Roe PD 5 Reading w/cy of incoming l
G. Holahan J. Zwolinski l
OGC GPA/CA l
SECY-CIRC-qc OO[9 C. Smyre, PMAS (ED0f 05485) w/cy incoming M. Krebs I
J. Tatum w/cy of incoming LA PD 5 Green Ticket file R. Zimmerman RV
- 3. Martin, RV
- See previ s concurrence l
DRSP/PD-DRSP/PDV*
TECH ED.*
(A DRSP/D:PDV (A) R/ADR5 PShea JTatum:sg JMain JLarkins JZwolinski 5/29/9 j/ 5/29/90 n
5/29/9 5/g/90 5/9/90 ADP M e hp RR EDO GPA/CA
' - F a
o) h' n JPartlowfj JTaylor l
5 y90 5fp/90 p 0
5/ /90 5/ /90
[GREENTICKET05485)
-.y.
j
' The Honorable Pete Wilson
-2
/
/
)
Plantoperatingefficiencyissomewhatsubjectivesndcanbemeasuredin!
several different ways.
Typically, if a plant requires outages of long duration to repair or replace equipment, it does not operate as efficiently as a plant that requires fewer outages of shorter duration.
In the case of San Onofre Unit 1, longer duration outages have typically been require'd in order for SCE to satisfy certain NRC requirements. While these longer' duration outages reduce plant operating efficiency, the reduced efficiency is not 1
/
indicative of unsafe operation.
p It is unfortunate that substance abuse continues to be a,p'roblem in our society.
We have addressed this problem in the nuclear industry by requiring nuclear utilities to establish and implement effective drug testing programs. We have reviewed the program being implemented at San Onofre'and it appears to be effective.
Unfortunately, this is one of the realities of our society and such l
neasures must be taken to assure safe plant operation, f
If you have any further questions or concerns regarding plant operations at San Onofre, please contact me.
/
/
Sincerely,
/
i Ja es M. Taylor
. Executive Director f
for Operations DISTRIBUTION DocketFile(50-206)w/ incoming NRC PDR w/cy of incoming LocalPDRw/cyofincoming/
EDO #05485 EDO Reading T. Murley/.". Miraglia W. Russell
/
F. Gillespie J. Partlow D. Crutchfield J. Roe
/
PD 5 Reading w/cy of incoming G.-Holahan
/
J. Zwolinski OGC
/
GPA/CA SECY
/
C. Smyre, PMAS (EDO#05485) w/cy incoming M. Krebs
/
J. Tatum w/cy of incoming LA PD 5 Green Ticket File R. Zimmerman('RV l
DRSP RSP/PDV TECH ED.
(A)DRSP/D:PDV (A)NRR/ADR5 l
5/29/90fAk 5/ /90 5/ /90 JHn JLarkins JZwolinski
(
PShe a Tatum:sg l
5/'J/(
5/Af/90 NRR/0'RSP ADP NRR/DONRR EDO GPA/CA GHolahan JPartlow TMurley JTaylor 5/ /90
.5/ /90 5/ /90 5/ /90 5/ /90
[GREENTICKET05485)
.m
.'t.
)
^*
q
?
DISTRIBUTION -
NRC PDR~w/cy of incoming
-j z
2 Docket File (50-206) w/ incoming Local-PDR w/cy of. incoming EDO #05485 EDO Reading T. Murley/F. Miraglia i
W. Russell F. Gillespie f
J. Partlow D. Crutchfield J. Roe PD 5 Reading w/cy of incoming G. Holahan J. Zwolinski
. t 0GC-GPA/CA
.SECY' C. Smyre. PMAS (ED0#05485) w/cy incoming-M. Krebs'
' J. Tatum w/cy of incoming LA PD 5 Green Ticket File R Zimmerman, RV
?
. f i
e i
1 e
b T
v i
t 3
l.-
i i
t 4
-t
/
I
'a
. d ~.
m J
i-
/
'g8 EE0 fh
'9, UNITED STATES 8
NUCLEAR REGULATORY COMMISSION
{
W ASHINGTON. D. C. 20665
/
EDO Principal Correspondence Control f0 FROM:
DUE: OS/O EDO CONTROL: 0005485 DOC DT: 05/15/90 FINAL REPLY:
San. Pete Wilson TO:
OCA FOR SIGNATURE OF:
- GRN CRC NO: 90-0549 Executive Director DESC:
ROUTING:
ENCLOSES LETTER FROM KATHERINE L. CRAIN JMartin, RV CONCERNING SAN ONOFRE DATE: 05/22/90 J d ASSIGNED TO:
CONTACT:
b
() p [ ' 7
!JRR Murley i
-f, m
F*p, -
SPECIAL INSTRUCTIONS OR REMARKS:
~ +-
.r
. -, 4 y# ymy,
9
/
NRR RECEIVED: MAY 22, 199 p(TO,iC00RDINATE.
W"". A e ;. z)
AACTION:,
t
/5 CW' /
- N('c N NRR ROUTING: b EY/M1AGLkA RUSSELL HOLAHAN GILLESPIE CRUTCHFIELD I
SMYRE 7
PARTLOW DE T0 m n
- 10E i
I
~
- J i
p gf; 8*
1 V^,-
r
- l. '-
OFFICE OF THE SECRETARY
~
L CORRESPONDENCE CONTROL TICKET
~ PAPER NUMBER:
CRC-90-0549 LO':3ING DATE: May 22 90 ACTION OFFICE:
AUTHOR:
Pete Wilson AFFILIATION:
UNITED STATES SENATE' LETTER DATE:
May 15 90 FILE CODE:
SUBJECT:
Constituent's concerns regarding San Onofre ACTION:-
Direct Reply DISTRIBUTION:
OCA to Ack.
SPECIAL-HANDLING: None NOTES:
t 1
DATE DUE:
Jun 5 90 SIGNATURE:
DATE SIGNED:
f AFFILIATION:
t 5
i r
l'
?
1 Md Off. EDO l
Date 5-e 9 0 Time // W '
d EDO
-.. ggg4U5 t
,