Corrected Page 2 for Apr 1990 Monthly Operating Rept for Wolf Creek Generating Station
ML20043F409
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1990
From: Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20043F407 List:
References
NUDOCS 9006140492
Download: ML20043F409 (1)


Text

' .

    • [

OPERATIlG IATA REPCRT DOCKET IG. 50-482 MLF CREEK GDil!RATIlG SThTICM WOLF CREEK NUCIEAR OPERATIIG OCRPCRATICM IRTE 05-01-90 OCMPLI!TED BY M. Williams TELEPE ME 316-364-8831 (PIRATIIG STh'IUS

1. Reporting Period: Acril, 1990 Gross Hours in Reporting Perio:13 719
2. Currently Authorized Power Isrvel(MWt) ,, Jill Max. Depend. Capacity (MWe-Het): lll5 Design Electrical Rating (MNe-Net): 1170
3. Power Invel to Wiich Restricted (If Any)(Min-Net): N/A
4. Reasms for restriction (If Any): N/A l

'Ihis Month Yr. to Date Cunulative l l

S. Number of Hours Reactor was Critical 0.0 1577.3 31,876.7 i

l

6. Reactor Reserve Shutdown Hours 0.0 0.0 339.8 1
7. Hours Generator on Line 0.0 1554.7 31,341.8 1
8. thit Reserve Shutdown Hours 0.0 0.0 0.0
9. Gross 'Ihermal Energy Generated (NNH) 0 5,152,108 103,629,363
10. Gross Electrical Energy Generated (MNH) 0 1,796,240 36,075,187
11. Het Electrical Energy Generated (MNH) 0 1,711,196 34,433,567 l

l'i. Reactor Servico Factor 0.0 54.8 78.1

13. Reactor Availability Factor 0.0 54.8 78.9
14. Unit Service Factor 0.0 54.0 76.8
15. Unit Availability Factor 0.0 54.0 76.8
16. Unit Capacity Factor (Using HDC) 0.0 52.4 74.6 l
17. Unit Capacity Factor (Using Design MWe) 0.0 50.8 72.1 l
18. Unit Forced Outage Rate 0.0 3.3 4.5
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A
20. If Shut Down at End of Report Period, Estimated Date of Startup: 05/16/90 t

Wolf Creek Generating Station o4o2 900611 Monthly Operating Report g61jEOCKO'icogg'e2

g. April 1990 Page 2 of 5