Forwards Safety Team Insp Rept 50-461/90-12 on 900518-31. Violations Noted
ML20043F107
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/05/1990
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
ILLINOIS POWER CO.
Shared Package
ML20043F109 List:
References
EA-90-108, NUDOCS 9006140168
Download: ML20043F107 (2)


See also: IR 05000461/1990012

Text

g,

4

. . [* e

g g MRT%)

-

,

,

JUN 0 5 W

r

b

Docket'Noi 50-461

EA 90-108

' ,

Illinois Power Company

,

ATTN:

Mr.' J. S. Perry

Vice President

Clinton Power Station

Mail Code V-275

Post Office Box 678

Clinton, IL 61727

Gentlemen:

This refers to.the special safety team inspection conducted by

' Messrs. P. G. Brochman, P. R. Pelke, and S. P, Ray of this office from May 18

through May 31, 1990,- of activities at Clinton Power Station, authorized by

NRC Operating License'No. NPF-62, and to the discussion of our. findings with

you and others~of_your staff at the conclusion of the inspection. The purpose

.l

,

of this. inspection was to review the circumstances surrounding two events.

.

-

= The first event involved the discovery on May 8,1996, that the installed

configuration'of the bellows on the shutdown service water piping to the

~

. division I and II emergency diesel generators (DG) was not consistent with the

design configuration.(tie rods were missing).

The second event occurred on

May 11, 1990. -During restoration of the isolation for work on the expansion

~

bellows, the DG heat exchanger shutdown service water outlet valves were not

manipulated correctly, resulting in their being shut versus' throttled open;

consequently, when- the division I DG was started for a surveillance test, it

-

tripped on high temperature two minutes after being loaded.

The enclosed copy of our inspection report . identifies areas examined'during -

the inspection. Within these areas, the inspection consisted 'of a selective

-examination of procedures and representative records, observations, and-

!

. interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements. You will be notified by separate correspondence of our

.

. decision regarding enforcement actions, based on the findings of this

inspection. -No written response is required, until you are notified of the

proposed enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

.this letter and the_ enclosed inspection report will be placed in the NRC

Public Document' Room.

-

'

i

.

0

9006140168 900605

~

[ ( '1

PDR

ADOCK 05000461

O

PDC

E

L*L ,

,

..,

.

JUN 0 51W

-Illinois Power Company-

2'

>

We wi_ll' gladly discuss any questions you have concerning this inspection.

Sincerely,

,

Edward G. Greenman, Director

Division of Reactor Projects

Enclosure: . Inspection Report

No. 50-461/90012(DRP)

cc w/ enclosure:

J. Cook, Manager - Clinton Power Station

F. .Spangenberg, III, Manager - Licensing

and Safety

DCD/DCB (RIDS)

- Licensing Fee Management Branch

Resident Inspector, RIII

'

J. Hickman, NRR PM

'

J. McCaffrey, Chief, Public

Utilities Division

D. Rosenblatt, Governor's

Office of Consumer Services

S. Zabeli Esquire, Shiff,

Hardin, & Waite

Chairman, Dewitt County Board

Illinois Department of

Nuclear Safety

J. Goldberg, 0GC

J. Lieberman, OE

,

!

J. Partlow, NRR

Perry SRI

I-

.-

'

t

,

P

RIII

RIII

RIII

R

GDh

tfCG

'

i

/

han

L

E

I man /kje

ro 'n

Lan bury

Kno b v vh o 6hGe

^1 son

ro

D

go

6h g

cl 90

0N

t