g,
4
. . [* e
g g MRT%)
-
,
,
JUN 0 5 W
r
b
Docket'Noi 50-461
EA 90-108
' ,
Illinois Power Company
,
ATTN:
Mr.' J. S. Perry
Vice President
Clinton Power Station
Mail Code V-275
Post Office Box 678
Clinton, IL 61727
Gentlemen:
This refers to.the special safety team inspection conducted by
' Messrs. P. G. Brochman, P. R. Pelke, and S. P, Ray of this office from May 18
through May 31, 1990,- of activities at Clinton Power Station, authorized by
NRC Operating License'No. NPF-62, and to the discussion of our. findings with
you and others~of_your staff at the conclusion of the inspection. The purpose
.l
,
of this. inspection was to review the circumstances surrounding two events.
.
-
= The first event involved the discovery on May 8,1996, that the installed
configuration'of the bellows on the shutdown service water piping to the
~
. division I and II emergency diesel generators (DG) was not consistent with the
design configuration.(tie rods were missing).
The second event occurred on
May 11, 1990. -During restoration of the isolation for work on the expansion
~
bellows, the DG heat exchanger shutdown service water outlet valves were not
manipulated correctly, resulting in their being shut versus' throttled open;
consequently, when- the division I DG was started for a surveillance test, it
-
tripped on high temperature two minutes after being loaded.
- The enclosed copy of our inspection report . identifies areas examined'during -
the inspection. Within these areas, the inspection consisted 'of a selective
-examination of procedures and representative records, observations, and-
!
. interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
- of NRC requirements. You will be notified by separate correspondence of our
.
. decision regarding enforcement actions, based on the findings of this
inspection. -No written response is required, until you are notified of the
- proposed enforcement action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
.this letter and the_ enclosed inspection report will be placed in the NRC
Public Document' Room.
-
'
i
.
0
9006140168 900605
~
[ ( '1
ADOCK 05000461
O
E
L*L ,
,
..,
.
JUN 0 51W
-Illinois Power Company-
2'
>
We wi_ll' gladly discuss any questions you have concerning this inspection.
Sincerely,
,
Edward G. Greenman, Director
Division of Reactor Projects
Enclosure: . Inspection Report
No. 50-461/90012(DRP)
cc w/ enclosure:
J. Cook, Manager - Clinton Power Station
F. .Spangenberg, III, Manager - Licensing
and Safety
DCD/DCB (RIDS)
- Licensing Fee Management Branch
Resident Inspector, RIII
'
'
J. McCaffrey, Chief, Public
Utilities Division
D. Rosenblatt, Governor's
Office of Consumer Services
S. Zabeli Esquire, Shiff,
- Hardin, & Waite
Chairman, Dewitt County Board
Illinois Department of
Nuclear Safety
J. Goldberg, 0GC
J. Lieberman, OE
,
!
J. Partlow, NRR
Perry SRI
I-
.-
'
t
,
P
RIII
RIII
RIII
R
GDh
tfCG
'
i
/
han
L
E
I man /kje
ro 'n
Lan bury
Kno b v vh o 6hGe
^1 son
ro
D
go
6h g
cl 90
0N
t