ML20043E941
| ML20043E941 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/06/1990 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20043E942 | List: |
| References | |
| NUDOCS 9006140020 | |
| Download: ML20043E941 (2) | |
See also: IR 05000423/1990007
Text
_
..
' w.
.
.
.
.
4
DUN 0 C g
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
P.O. Box 270
,
Hartford, Connecticut
06141-0270
Gentlemen:
Subject: NRC Region I Inspection No. 50-423/90-07
This refers to the routine resident safety inspection conducted by Mr. K.
Kolaczyk of this office on March 20 through May 2,1990 at Millstone Nuclear
Power Station, Unit 3, Waterford, Connecticut of activities authorized by NRC
License No NPF-49 and to the discussions of our findings by Mr. Kolaczyk with
Mr. Gentry and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC legion I
inspection report which is enclosed with this letter. Within these areas, the
inspection consisted of observation of activities, interviews 'vith personnel,
measurements, and document reviews.
Also, this refers to your tter dated March 23, 1990 in response to our letter
dated February 26, 1990, J.spection Report 50-423/89-23, rejarding the removal
of the service water booster pump automatic start capability without performing
a safety evaluation and changing the service water operating procedure.
Thank
you for informing us of the corrective and preventive actions documented in the
letter.
The permanent corrective actions will be reviewed in future resident
inspections when they have been completed.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and the enclosures will be placed in the NRC Public Document Room.
Your cooperation with us is appreciated.
Sincerely,
Original Signed BY
Edward C. Wenzinger, Chief
Projects Branch No. 4
Division of Reactor Projects
f.
OFFICIAL RECORD COPY
IR MILL 3 90-07 - 0001.0.0
11/29/80
[
s\\
I
9006140020 900606
O i
roa
Anoeg osooo423
Q
.
."
.
'
..
Northeast Nuclear Energy Company
2
0 0 1993
l
-
.
' Enclosure: NRC Region I Inspection Report No. 50-423/90-07
cc w/ encl:
'
W. D. Romberg, Vice President, Nuclear Operations
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Director of Quality Services
S. E. Scace, Nuclear Station Director
C. H. Clement, Nuclear Unit Director, Millstone Unit 3
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Senior Resident Inspector
State of Connecticut
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosures)
DRP Section Chief
J. Shediosky, SRI, Haddam Neck
W. Raymond, SRI, Millstone
bec w/ Executive Summary only:
J. Wiggins, DRP
W. Hodges, DRS
W. Johnston, DRS
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS
R. Cooper, DRSS
R. Bellamy, DRSS
J. Stolz, NRR/PDI-4
f
RI:URP
RI:DRP
RI:DRP
R:
K laczyk
Ra
nd
H e kamp
ger
h/h/90
05/
0
06/
0
04f/
0
0FFICIAL RECORD COPY
IR MILL 3 90-07 - 0002.0.0
11/29/80