ML20043E941

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-423/90-07 on 900320-0502.No Violations Noted
ML20043E941
Person / Time
Site: Millstone 
Issue date: 06/06/1990
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20043E942 List:
References
NUDOCS 9006140020
Download: ML20043E941 (2)


See also: IR 05000423/1990007

Text

_

..

' w.

.

.

.

.

4

DUN 0 C g

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P.O. Box 270

,

Hartford, Connecticut

06141-0270

Gentlemen:

Subject: NRC Region I Inspection No. 50-423/90-07

This refers to the routine resident safety inspection conducted by Mr. K.

Kolaczyk of this office on March 20 through May 2,1990 at Millstone Nuclear

Power Station, Unit 3, Waterford, Connecticut of activities authorized by NRC

License No NPF-49 and to the discussions of our findings by Mr. Kolaczyk with

Mr. Gentry and others of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC legion I

inspection report which is enclosed with this letter. Within these areas, the

inspection consisted of observation of activities, interviews 'vith personnel,

measurements, and document reviews.

Also, this refers to your tter dated March 23, 1990 in response to our letter

dated February 26, 1990, J.spection Report 50-423/89-23, rejarding the removal

of the service water booster pump automatic start capability without performing

a safety evaluation and changing the service water operating procedure.

Thank

you for informing us of the corrective and preventive actions documented in the

letter.

The permanent corrective actions will be reviewed in future resident

inspections when they have been completed.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and the enclosures will be placed in the NRC Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

Original Signed BY

Edward C. Wenzinger, Chief

Projects Branch No. 4

Division of Reactor Projects

f.

OFFICIAL RECORD COPY

IR MILL 3 90-07 - 0001.0.0

11/29/80

[

s\\

I

9006140020 900606

O i

roa

Anoeg osooo423

Q

PDC

.

."

.

'

..

Northeast Nuclear Energy Company

2

0 0 1993

l

-

.

' Enclosure: NRC Region I Inspection Report No. 50-423/90-07

cc w/ encl:

'

W. D. Romberg, Vice President, Nuclear Operations

R. M. Kacich, Manager, Generation Facilities Licensing

D. O. Nordquist, Director of Quality Services

S. E. Scace, Nuclear Station Director

C. H. Clement, Nuclear Unit Director, Millstone Unit 3

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

DRP Section Chief

J. Shediosky, SRI, Haddam Neck

D. Jaffe, PM, NRR

W. Raymond, SRI, Millstone

bec w/ Executive Summary only:

J. Wiggins, DRP

W. Hodges, DRS

W. Johnston, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS

R. Cooper, DRSS

R. Bellamy, DRSS

J. Stolz, NRR/PDI-4

f

RI:URP

RI:DRP

RI:DRP

R:

K laczyk

Ra

nd

H e kamp

ger

h/h/90

05/

0

06/

0

04f/

0

0FFICIAL RECORD COPY

IR MILL 3 90-07 - 0002.0.0

11/29/80