agi -51980
.
,
In Reply Refer To:
Docket: STN 50-482/90-21
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
P.O. Box 411
Burlington, Kansas 66839
Gentlemen:
This refers to the inspection conducted by Messrs. R. B. Vickrey and
D. R. Hunter of this office during the period May 7-11, 1990, of activities
authorized by NRC Operating License NPF-42 for Wolf Creek Generating Station,
and to the discussion of our findings with you and other members of your staff
at the conclusion of the inspection.
The principle area examined during the inspection was the followup on the
findings and weaknesses identified in the emergency operating procedure (EOP)
NRCTeamInspectionReport(50482/88-13) conducted in March and April of 1988.
Within this area, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel, and
observations by the inspectors. The inspection findings are documented in the
enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. However, in accordance with Section V. A, of
the NRC's Enforcement Policy, no citation -is being issued for the violation
described in paragraph 3.1 of the enclosed inspection report.
We have. also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By:
Samuel J. N
Samuel J. Collins, Director
Division of Reactor Projects
Enclosures:
Appendix - HRC Inspection Report
50-482/90-21 w/ attachment
0
RIV:0P
RI:0P$
r C:DRS
.S
D:
S ollin
LJCa(llan
DRHunt
m
RBVicVr.
Gapiardo
(/
90
b/
0
(, / 6 /90
6/$/90
(p/ y90
9006130384 900605
[
{DR
ADOCK 0500o482
iII
1
.
.
- r s 3
1, ' ,
t.
2 "
e,
a,.
,
j';
a
,
,
w
'
Wolf Creek Nuclear Operating
-E-
'
L
Corporation
,'
r
cc w/ enclosures:
<
Wolf Creek Nuclear Operating Corp.
1
,
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839.
I
Shaw, Pittman, Potts & Trowbridge
ATTN: Jay Silberg, Esq.
1800 M Street, NW
Washington, D.C.
20036
Public Service Comission
ATTH: Chris.R. Rogers, P.E.
Manager, Electric Department
P.O. Box 360
Jefferson City, Missouri 65102
U.S. Nuclear Regulatory Comission
~ ATTN:
P,egional Administrator, Region III
799 Roosevelt Road
Glen Ellyn, Illinois 60137
Wolf Creek Nuclear Operating Corp.
ATTN: Otto Haynard, Manager
Regulatory Services
P.O. Box 411
Burlington, Kansas 66839
Kansas Corporation Comission
I
ATTN:
Robert Elliot, Chief Engineer
Utilities Division
4th Floor - State Office Building
Topeka, Kansas- 66612-1571
j
Office of the Governor
State of Kansas
Topeka, Kansas 66612
l
Attorney General
4
'
1st Floor - The Statehouse
Topeka, Kansas 66612
. Chairman, Coffey County Comission
Coffey County Courthouse
l
Burlington, Kansas 66839
l
'
!
,
l
!
I
-
.
.
.
.
. . .
.
m
1.r
3a+
,
.
.
.
,
I
^
Wolf- Creek Nuclear Operating
-3-
Corporation:
Kansas Department of Health
and Environment
Bureau of Air Quality & Radiation
Control-
ATTN: Gerald Allen. Public
Health Physicist
Divisioa of Environment
Forbes Field building 321
Topeka,_ Kansas 66620
U.S. Nuclear Regulatory Comission
ATTH: -Senior Resident Inspector
s
P.O. Box 311
Burlington, Kansas 66839
U.S. Nuclear Regulatory Comission
ATTN:~ Regional Administrt. tor, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington,' Texas 76011
bectoDMB(IE01)'
s
- bec distrib. by RIV:
,
.
- R..D. Mart).1
- Resident Inspector
- SectionChief'(DRP/D)
- DRP
'*DRSS-FRPS-
R. Hague, RIII
- RIV File
SRI, Callaway, RIII
- MIS System
- RSTS Operator
- ProjectEngineer(DRP/D)
Lisa Shea, RM/ALF
. D. R. Hunter.
- DRS
.
NRR Project Manager (MS: 13-D-18)
>
- D._V. Pickett,
- R. B.J Vickrey .
- J. E. Gagliardo
'
- w/766
,
5
.'
_
s3 '
-