Advises That Description of motor-operated Valve Program Should Be Available for Review by 900628 or First Refueling Outage After 891228,per Generic Ltr 89-10.Program in Generic Ltr Expands Scope of Program Outlined in Bulletin 85-003
ML20043E306
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/30/1990
From: Bournia A
Office of Nuclear Reactor Regulation
To: Gates W
OMAHA PUBLIC POWER DISTRICT
References
GL-89-10, IEB-85-003, IEB-85-3, TAC-75664, NUDOCS 9006120278
Download: ML20043E306 (3)


Text

w y

s f.g ' }

May 30,1990 Docket No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Tublic Power District 444 South 16th Street Mall-Mail Stop BE/EP 4 Omaha, Nebraska 68102-2247

Dear Mr. Gates:

SUBJECT:

RESPONSE TO GENERIC LETTER 89-10, " SAFETY-RELATED MOTOR.

OPERATEDVALVE(MOV)TESTINGANDSURVEILLANCE"(TACN0.75664)

On June 28,1989, the NRC issued Generic Letter (GL) 89 10 requesting the establistment of a program to ensure the operability of all safety.related MOVs under design basis conditions. The program in GL 89-10 significantly expands the scope of the program outlined in NRC Bulletin 85-03 and its supplement.

In accordance with the schedule provided in the GL, a description of your MOV program should be available for review by June 28, 1990, or the first refueling outage after December 28, 1989, whichever is later..Information that should be contained in your program description was discussed during the workshops held in September 1989.

The staff positions on questions.

presented during the workshops will be issued in the form of a supplement to the GL. As your program is developed, justification for any differences between your program and the GL exemplified by the workshop comments should be incorporated into your program description.

Your response to GL 89 10 dated December 28, 1989, stated that you intend to meet the schedule and recommendations of the Generic Letter. Your program description should be retained on site for possible further NRC staff review.

Sincerely, t,

/s/

k' L E'S Anthony Bournia, Project Manager

' 'on Project Directorate IV Division of Reactor Projects - III, L76 IV, V and Special Projects g gg _

Office of Nuclear Reactor Regulation

'un J

cc: See next page "oct DISTRIBUTION 3$0.

4DoCFet-F11eT3Q NRC PDR Local PDR PD4 Reading G. Holahan MS 13E4 F. Hebdon P. Noonan A. Bournia 0GC-Rockville E. Jordan MS HNBB 3701 L. Marsh A. Gody ACRS (

P-315 PD4 Plant File L. Constable g,

~~~iP547Ml;L... :........ r$....IPB4'/lF~~~....... :.............

tRtb~

-0FC.

PD4/L[

hc.... :....A.

NAME; :PNoonan

ABournia:bj
LBMarsh
FHeb
DATE
05/M/90-

. 5FFIllht~REtDRD'tDW~~~~ /)_0L90Docidii~elil~lEie : ~

Ft~DR~~-~~~~~~~~~~~~~~~~~~~~-

05//Y90
05
05 M 90

^

^

~

j g

7

, 7* * {

paa

[

NUCLEAR REGULATORY COMMISSION

j; n

WASHING TON, D. C. 20656 1

r, May 30, 1990 j

1 h

Docket'No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South'16th Street Mall i

Mail Stop BE/EP 4 i

Omaha ~, Nebraska 68102-2247

Dear Mr. Gates:

SUBJECT:

RESPONSE TO GENERIC LETTER 89-10. " SAFETY-RELATED MOTOR-I OPERATEDVALVE(MOV)TESTINGANDSURVEILLANCE"(TACNO.75664) t On June 28, 1989, theNRCissuedGenericLetter(GL)89-10requestingthe establishment of a program to ensure the operability of all safety-related MOVs under design basis conditions. The program in GL 89-10 significantly i

expands the scope of the program outlined in NRC Eulletin 85-03 and its supplement.

In accor'ance with the schedule provided in the GL, a description of your d

MOV program should be available for review by June 28, 1990, or the first i

refueling outage after December 28, 1989, whichever is later.

Information that should be contained in your program description was discussed during the workshops held in September 1989. The staff positions on questions presented during the workshops will be issued in the form of a supplement to the GL. As your program is developed, justification for any differences between your program and the GL exemplified by the workshop comments should-be incorporated' into your program description.

Your response to GL 89-10 dated December 28, 1989, stated that you intend to' meet the schedule and recommendatiuns of the Generic Letter.

Your program description should be retained on-site for possible further NRC staff review.

_t i

Sincerely,

(%2m 0m Anthony Bournia,. Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page l

r,

~

f

. v.. : :.

vi =.9 e i s.

~

' Mri W. Gary' Gates'.

Fort Calhoun Statior.

-4 Omaha Public Power District Unit No. 1 s

- CC:

Harry H. Voigt.-Esq.-

. LeBoeuf, Lamb,-Leiby & MacRae-1333 New Hampshire Avenue, NW-o 1

Washington,-D.C.

20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors:

Blair, Nebraska '68008

' Mr.-Phillip Harrell, Resident Inspector l

U.S. Nuclear Regulatory Commission i

P. O. Box 309-Fort Calhoun, Nebraska 68023 Mr. Charles B. -Brinkman, Manager r"

- Washington Nuclear Operation?-

-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, MD-20852 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 0ffice of Executive Director for Operations

611'Ryan Flaza Drive, Suite 1000 Arlington, Texas. 76011

' Harold Borchert Director

' Division of. Radiological Hesith l

Department of Health 301: Centennial Mall, South P.O. Box'95007 1

Linccin, Nebraska 68509 Mr. G. R. Peterson, Manager-Fort Calhoun Station P. 0, Box 399 i

Fort Calhoun, Nebraska 68023 e

1 i

- -- i- -

_,,...