May 29, 1990 Docket No. 50 423 L
Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141 0270
Dear Mr. Mroczka:
SUBJECT:
CLOSE0VT OF GENERIC LETTER 89 19, " REQUEST FOR ACTION RELATED TO RESOLUTION OF UNRESOLVED SAFETY ISSUE A.47, SAFETY IMPLICATION OF CONTROL SYSTEMS IN LWR NUCLEAR POWER PLANTS PURSUANT TO 10 CFR 50.54(f)*(TAC 74964)
Your letter dated March 27, 1990, respondedtoGenericLetter(GL)89-13for Millstone Unit No. 3.
Your response provided information to demonstrate that Millstone Unit No. 3 meets the intent of the GL in that the steam generator overfill protection system is implemented and the Technical Specifications include requirements to periodically verify its cperability. A detailed technical review of your response has not been performed and therefore approval of your design is neither intended nor implied. However, your confirmation provides an adequate basis to consider NRR's review of your response complete.
Further NRC review, if any, will be performed either by inspection or audit.
Sincerely,
/s/
o David H. Jaffe, Project Managei n
Project Directorate 1 4 W
Division of Reactor Projects - 1/11 Office of Nucicar Reactor Regulation h
cc:
See next page M
DISTRIBUTION oo
' Docket FHe>
OGC f$
NRC & Local PDRs E. Jordan (MNBB3302)
Plant File ACRS (10)
_om S.Varga(14E4)
S. Newberry
$$o.
B. Boger (14A2)
J. Stolz S. Norris D. Jaffe 0FC
- LA:PDI-4
- PM:PDI.4
- BC:SICB
- D:PDI.4 4 ME
- S orris:rc*
- DJaffe*
- SNewberry*
- JSt'1z*
DATE : 5 &l/90
- // / / 'l/90
- S //0/90
- 9'/2//90 OFFICIAL RECORD COPY Document Name: GL 8919
- See previous concurrence
)
i Mr. E. J. Mroczka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. 3 cc:
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 i
W. D. Romberg, Vice President D. O. Nordquist i
Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Prutection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary First Selectmen Energy Division Town of Waterford Office of Policy and Management Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 S. E. Scace, Nuclear Station Director W. J. Raymond, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station r
Northeast Nuclear Energy Company c/o U. S. Nuclear Regulatory Comission rost Office Sox 128 Post Office Box 811 Waterford, Connecticut 06385 Niantic, Connecticut 06357 C. H. Clement, Nuclear Unit Director M. R. Scully, Executive Director Millstone Unit No. 3 Connecticut Municipal Electric Northeast Nuclear Energy Company Energy Cooperative Post Office Box 128 30 Stott Avenue Waterford, Connecticut 06385 Norwich, Connecticut 06360 Ms. Jane Spector Mr. Alan Menard, Manager Federal Energy Regulatory Comission Technical Services 825 N. Capitol Street, N.E.
Massachusetts Municipal Wholesale Room 86080 Electric Company Washington, D.C.
2042f Post Office Box 426 Ludlow, Massachusetts 01056 Burlington Electric Department c/o Robert E. Fletcher, Esq.
271 South Union Street Burlington, Vermont 05402 l
...v.
- Docket 'No.' 50 423 Mr. Edward J. Mroczka Senior Vice President Nuclear Engineering and Operations Connecticu Yankee Atomic Power Company Northeast N clear Energy Company Post Office x 270--
Dear Mr. firoczk :
SUBJECT:
CLOSE0U OF GENERIC LETTER 89-19, REQUEST FOR ACTION RELATED TO RESOLUTI 0F UNRESOLVED SAFETY ISSUE A 47 SAFETY IMPLICATION OF CONTROL SY TEtiS IN LWR NUCLEAR POWER PLAtiTS PURSUANT TO 10 CFR 50.54(f)"( C 74964)
Your. letter dated tiarch 7, 1990, responded to Generic Letter (GL) 89-13 for Millstone Unit No. 3.
Yo response stated that your plant meets all the guidance provided in the GL regarding steam generator overfill protection and associated procedures and Te nical Specifications..A detailed technical review of your response has no been performed and therefore approval of your design is neither intended nor
. plied. However, your confirmation provides an adequate basis to consider NR 's review of your response complete. Further NRC review, if any, will be perfor ed either by inspection or audit.
Since rely,
Davi H. Jaffe, Project tianager Proje Directorate 1 4 Divisi of Reactor Projects. 1/11 Office o Nuclear Reactor Regulation cc:
See next page DISTRIBUTION
. Docket File OGC NRC-A Local PDRs E. Jordan (MNBB3302)
Plant File ACRS(10)
S.Varga(14E4)
S. Newberry B. Boger (14A2)
J. Stolz S. Norris D. Jaffe
/
- 0FC
- LA
- PDI-4
- PM:PD,
- BC:SICB
- D: ( l-4 NAkE Sb
!DbaffI \\ I $Sb bSto rry DATE :9 //C)/90
- 4/$/90
/ lif/90
- II//; /90 i
l I
0FFICIAL RECORD COPY Document Name: GL 8919