Amend 139 to License DPR-16,revising Tech Specs 3.17 & 4.17 to Require Two Control Room HVAC Sys to Be Operable During All Modes of Operation & to Add New Limiting Conditions for Operation for Control Room
ML20043D244
Person / Time
Site: Oyster Creek
Issue date: 05/29/1990
From: Stolz J
Office of Nuclear Reactor Regulation
To:
GPU Nuclear Corp, Jersey Central Power & Light Co
Shared Package
ML20043D249 List:
References
DPR-16-A-139 NUDOCS 9006070290
Download: ML20043D244 (5)


Text

-.

l i

  • #gm..g%,

umTED *TATES i

~

e NUCLEAR REGULATORY COMMISSION wA,HiwoTow, p. c. 20666 l

'*,... * /

GPU NUCLEAR CORPORATION AND JER$EY CENTRAL POWER & LIGHT COMPANY DOCKET NO. 50-219 DYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.139 License No. DPR-16 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by GPU Nuclear Corporation, et al.,

(thelicensee),datedOctober 18, 1989 as supplemented February 21, 1990 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The f acility will oprate in conformity with the application, the provisions of the Act, and the rules and regulctions of the l-Comission; C.

Thereisreasonableassurance(i)thattheactivitiesauthorized i

by this amendment can be conducted without endangering the health and (ii) that such activities will be and safety of the public,ith the Comission's regulations; l

conducted in compliance w D.

The issuance of this amendment will not be inimicc1 to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's reguletions and all applicable requirements have been satisfied.

L 9006070290 900s2p PDR ADOCK 0500021" P

PDC

4' 2

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, andparagraph2.C.(2)ofProvisionalOperatingLicenseNo.DPR-16ishereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.139, are hereby incorporated in the license. GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effettive as of the date of issuance, to be implemented within 60 days of issuance.

OR THE NUCLEAR REGU ATORY COMMIS$10H 111 1

Jo F. Stolz, Dire r

P oject Directorate 1-4 ivision of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: May 29, 1990 l

{

o l

. ~

s ATTI,0WENT TO LICENSE AMENDMENT NO.139 PROVISIONAL OPERATING LICENSE NO. DPR-16 C0CKET NO. 50-219 Replace the followir.g pages of the Appendix A Technical Specifications with the enclosed pages as indicated. The revised pages are identified by.

amendr4nt number and contain vertical lines indicating the areas of change.

Remove Insert f

Page 3.17-1 Page 3.17-1 I

Page 4.17 1 Page 4.17-1 I

I f

r I

,yy it.

j i

3,17 Cent rel Peer Meat!ne, Ventilatine, and Air-cenditierine Evatem Are11earility:

Applies to the operability of the control room testing, ventilating, and air conditioning (NVAC) systems.

Ordertive:

To assure the capability of each control room HVAC system to minimise the amount of radioactivity f rom entering the control room in the event of an accident.

sce ri f i e nt i en A.

Two control room NVAC systems shall be operable during all modes of plant operation.

8.

With one control room NVAC system determined ineperables (1) Demonstrate once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> the partial recirculation mode of operation for the operable system, or place the operable system in the partial recirculation modet and (2) Restore the inoperable system within 7 days, or prepare and submit a special report to the Cor. mission in lieu of any cther report required by section 6.9, within the next 14 days, outlinang the action taken, the cause of the inoperability and l

the plans / schedule for restoring the HVAC system to operable status.

C.

With both control room HVAC systems dete. tined inoperable.

(1) During Power Operations place the reacter in the cold shutdown condition within 30 hcurs 5

(2) During Refueling n

(a) Cease irradiated fuel heraling operations; and (b) Cease all work on the reactor or its connected systems in the reactor building which could result in inadvertent releases of radioactive materials.

11111:

The operability of each control room HVAC system ensures that the E

control room will remain habitable for operations personnel during a postulated design basis accident. The control room envelope includes the control room panel area, the shift superviser's office, toilet room, kitchen, and lower cable spreading room, since systems A and 3 do not have NEPA filters or charcoal adsorbers, the supply f an and dampers for each system minimise the beta and gamma doses to the operators by providing positive pressurisation and 1!miting the j

makeup and infiltration air into the control-room envelope. For the supply of 2004 outside air to the control room anvelope, the doses increase to 29.1 rem beta and 3.14 rem gamma for the assumed 30 days; however, these values are within the allowable limits.

l ors 7tR CRrrn 3.17-1 Amendment no.: Jef. 139

i l

i 4.17 centrol Room Heat ine Ventilatina, and Air-cenditienine svatem i

Atelicarility:

Applies to surveillance requirements for the control room heating, ventilating, and air conditioning (NVAC) systems.

i ohinetive To verify the capability of each control room NVAC system to minimise the amount of radioactivity from entering the control room in the event of an accident.

i gaggification Surveillance of each control room NVAC system shall be as follows:

l A.

At least once monthly: by initiating, from the control room, the partial roeirculation mode of operation, and by verifying that the system components are aligned such that the system is operating in this mode.

S.

At least once every refueling outages by verifying that in the partial recirculation mode of operation, the control room and lower cable spreading room are,

maintained at a positive pressure of 2 1/8 in. Wo relative to the outside aemosphere.

Baais:

74riodic surveillance of each control room NVAC system is required to ensure the operability of the eyetem. The operability of the system in conjunction with control room design provisions is based upon limiting the radiatien exposure to personnel occupying the control room to less than a 30-day integrated gamma dose of $ rom, and a 30-day integrated beta does of 30 rom.

e i

)

}$$,139 OYSTER CRIEK 4.17-1 Amendment No.: