ML20043D143

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-483/90-08 on 900401-0515.No Notice of Violation Issued for Violation Noted,Per 10CFR2, App C,Section V.G.1
ML20043D143
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/31/1990
From: Knop R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20043D144 List:
References
NUDOCS 9006070174
Download: ML20043D143 (2)


See also: IR 05000483/1990008

Text

g

i

p co/ Oc 6 ( aro[)

<

-

f-

a

,

!.

MAY 81 1990

[:

Docket No. 50-483

Union Electric Company

ATTN: Mr. Donald F. Schnell

,

L

Senior Vice President - Nuclear

..

Post Office Box 149 - Mail Code 400

-

p

St. Louis, MO 63166

Gentlemen:

y

)'

This refers to the roJtine safety inspection Conducted by Messrs. B. H. Little,

"

B. L. Bartlett, and C. H. Brown of this office from April 1 through May 15,

1990 of activities as Callaway Plant, Unit 1, authorized by NRC Operating

License No. NPF-30. and to the discussion of our findings with Mr. J. D. Blosser

and others of you. staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements as identified in the enclosed ccpy of our inspection

report. The inspection showed that the violations .;L the test of 10 CFR 2,

Appendix C,Section V.G.1; accordingly no Notice :.i Violation was issued.

No

reply to the violation is required, and we nave no further questions regarding

this matter at-this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

t

50ricinni n'~rd tv t. L. &mn

Richard C. Knop, Chief,

Reactor Projects Branch 3

Enclosure:

Inspection Report

No. 50-483/90008(DRP)

See Attached Distribution

RI-L '

i,

'

itI,(st

!

/ /

hiks/mj

  1. mh

8aueh

f%

,/ c}

n

i

.

9006070174 900531

PDR

ADOCK 05000403

(

o

PDC

'

- - - _ _ - _ _ _ _

_ -_ _ -

- _ - _ - _ - -

O.

9

-.

Union Electric Company

2

MAY 81 1990

Distribution

cc w/ enclosure:

G. L. Randolph, General Manager,

Nuclear Operations

J. V. Laux, Manager Quality

Assurance

Tom P. Sharkey, Supervising

Engineer. Site Licensing

<

.

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

,

m-

Region IV

'

Resident Inspector, Wolf Creek

K. i> rey

Chris R. Rogers, P.E.

Utility Division, Missouri

Public Service Commission

CFA, Inc.

- Gerald Charnoff, Esq.

Thomas'6axter, Esq.

R. A. Kucera, Deputy Director,

Department of Natural Resources

l

l

l

,

s

$