ML20043C449

From kanterella
Jump to navigation Jump to search
Revised Page 2-28 to QA Program for Operation Policy Document
ML20043C449
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/31/1990
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20043C439 List:
References
NUDOCS 9006050201
Download: ML20043C449 (1)


Text

l. 1 y

,, ,- .E Any decision to reduce requirements to permit use of nonconforming parts, I

materials, or components in essential -systems, will be- documented as- a i

nonconformance report and will be subject to Station Operations Review Committee 1 (SORC) review and approval. Appropriate design modification documentation will '

be completed if required. y l, 4

j A '

Approved Procedures will be utilized for repair and rework of essential- ,

parts and equipment. All such rework will be thoroughly documented,: including > ,

-i

-Quality Control and , Quality Assurance Surveillance activities, to assure I "1

conformance with the requirements of the specifications, procedures, and other '

l 1

i controlling documents. '

.1 i

Essential equipment classified as scrap will be identified and segregated -l in such a manner- to prevent inadvertent use or installation in an essential' system, l l

.l The'CGO QA Department will issue a quarterly trend report to the Nuclear =!

Power Group Manager which may identify adverse trends that require corrective  !

action.

I 2.16 Corrective Action i

NRC Regulations which require formal reporting to the NRC of failures, a malfunctions, deficiencies, unusual operating experiences, and deviations which j

may have a significant effect on quality or safety will be reviewed and evaluated - '

by the Station Operations Review Committee and, where appropriate, by the Safety Review and Audit Board. It will be the responsibility of the Nuclear Group 2-28 Revision 6 1 i

9006050201 900531 I PDR ADOCK 05000298 P PDC

_ _ m