ML20043C449

From kanterella
Jump to navigation Jump to search
Revised Page 2-28 to QA Program for Operation Policy Document
ML20043C449
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/31/1990
From:
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20043C439 List:
References
NUDOCS 9006050201
Download: ML20043C449 (1)


Text

l y

1

.E Any decision to reduce requirements to permit use of nonconforming parts, I

materials, or components in essential -systems, will be-documented as-a i

nonconformance report and will be subject to Station Operations Review Committee 1

(SORC) review and approval. Appropriate design modification documentation will be completed if required.

y l, 4

j A'

Approved Procedures will be utilized for repair and rework of essential-parts and equipment. All such rework will be thoroughly documented,: including >

-i

-Quality Control and, Quality Assurance Surveillance activities, to assure I

"1 conformance with the requirements of the specifications, procedures, and other l

1 i

controlling documents.

.1 i

Essential equipment classified as scrap will be identified and segregated

-l in such a manner-to prevent inadvertent use or installation in an essential'

system, l

l

.l The'CGO QA Department will issue a quarterly trend report to the Nuclear

=!

Power Group Manager which may identify adverse trends that require corrective action.

I 2.16 Corrective Action i

NRC Regulations which require formal reporting to the NRC of failures, a

malfunctions, deficiencies, unusual operating experiences, and deviations which j

may have a significant effect on quality or safety will be reviewed and evaluated -

by the Station Operations Review Committee and, where appropriate, by the Safety Review and Audit Board.

It will be the responsibility of the Nuclear Group 2-28 Revision 6 1

i 9006050201 900531 I

PDR ADOCK 05000298 P

PDC m