Forwards Insp Repts 50-313/90-09 & 50-368/90-09 on 900316-0430.No Violations or Deviations Noted.Addl Example of Previously Cited Violation Re Missed Surveillance Identified
ML20043C135
Person / Time
Site: Arkansas Nuclear  
Issue date: 05/24/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20043C136 List:
References
NUDOCS 9006040110
Download: ML20043C135 (3)


See also: IR 05000313/1990009

Text

=

L ,/b

.

_,

MAY 241990

. . . -

In Reply Refer To:

Dockets: 50-313/90-09

50-368/90-09

Arkansas P.wer.& Light Company

ATTN:

Neil S. Carns, Vice President

Nuclear Operutions

P.O. Box 551

-

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag,

of this office, during the period March 16 through April 30, 1990, of

activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas

Nuclear One, Units 1 and.2, and to the discussion of our findings with

Mr. J. W. Yelverton and other members of your staff at the conclusion of the

inspection.

-Areas examined during the inspection included followup of events, operational

safety verification, surveillance, and maintenance. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspectors.

The

findings are documented in the enclosed inspection repoit.

Within the scope-of-+t.e inspection, no violations or deviations were

identified.- Howevec, an additional example of a previously cited violation,

failure to perform a-surveillance requirement within the' required interval,.was

identified on April 1, 1990 .and reported by your staff.- This continued patte'rn

.of weaknesses in the scheduling and implementation of the surveillance program

concerns the staff.

During the last quarterly performanco meeting on April 24,

1990, the actions you have taken to improve your' surveillance test program were

discussed. While the. initial assessment of your actions appear appropriate,

the staff will continue to closely monitor the scheduling and performance of

surveillances to determine the long-term effectiveness of your program changes.

We-have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in -

Section 3.0 of the enclosed report.

,

RIV:RI

SRI

C:DRP/A

M

CCWarren

RCHaag

TFWesterman

J

s

3

5/23/90

Sh3/90

5/23/90

/90

'

I

9006040110 900524

PDR

ADOCK 05000313

Q

PDC

. , .

v

.

' ,

,,

Arkansas Power & Light Company

-2-

,

Should you have-any questions concerning this inspection, we will be pleased to

o

discuss them with you.

Sincerely,

OdginalS3 nedBy:-

0

Samuel J. Collins

Samuel J. Collins, Director

Division of Reactor Projects

-Enclosures:

Appendix - NRC Inspection Report

'

'50-313/90-09

50-368/90-09

cc w/ enclosures:

Arkansas Nuclear One

ATTN:

Early Ewing, General Manager

Technical Support and Assessment

P.0, Box 608

Russellville,. Arkansas 72801

Arkansas Nuclear One

ATTN: Jerry Yelverton, Director

a

-Nuclear Operations

P.0 Box 608

.

Russellville, Arkansas 72801

Combustion Engineering, Inc.

ATTN:

Charles B.'Brinkman, Manager

Washington Nuclear Operations

,

12300 Twinbrook Parkway, Suite 330

!

Rockville, Maryland 20852

1

1

Honorable Joe W. Phillips-

County Judge of Pope County

!

Pope County Courthouse

Russellville, Arkansas 72801

'

~ Bishop, Cook, Purcell & Reynolds

ATTN:

Nicholas S. Reynolds, Esq.

1400 L Street, N.W.

i

~

Washington, D.C.

20005-3502

.i

1

.

x:s;

.

.e

Arkansas Power-& Light Company

-3-

' Arkansas' Department.of Health

-ATTN: - Ms. Greta.Dicus, Director

Division of Environmental Health

Protection

'4815 West Markam Street

Little Rock,fArkansas 72201

,

Babcock & Wilcox

Nuclear Power Generation Division

ATTN: Mr. Robert B. Borsum

_

1700.Rockville Pike,-Suite 525

Rockville, Maryland 20852--

U.S. Nuclear Regulatory Commission-

ATTN:

Senior Resident' Inspector

'l Nuclear Plant Road

Russellville,' Arkansas 72801

.U.S. Nuclear Regulatory Commission

ATTN: ' Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 1000

Arlington,. Texas 76011

bec to DMB'(IE01)

bec distrib. by.RIV:-

  • R. D.-Martin

' DRSS-FRPS

  • Section Chief (DRP/A)

Lisa Shea, kri/ALF

  • RIV File
  • DRP
  • MIS System
  • RSTS Operator
  • Project Engineer (DRP/A)
  • DRS
  • T. ' Alexion,- NRR Project Manager (MS:

13-E-21)

  • C

Poslusny, NRR Project Manager (MS: .13-D-18)

  • w/766

._

a