ML20043C135
| ML20043C135 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 05/24/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Carns N ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20043C136 | List: |
| References | |
| NUDOCS 9006040110 | |
| Download: ML20043C135 (3) | |
See also: IR 05000313/1990009
Text
=
L ,/b
.
_,
MAY 241990
. . . -
In Reply Refer To:
Dockets: 50-313/90-09
50-368/90-09
Arkansas P.wer.& Light Company
ATTN:
Neil S. Carns, Vice President
Nuclear Operutions
P.O. Box 551
-
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Messrs. C. C. Warren and R. C. Haag,
of this office, during the period March 16 through April 30, 1990, of
activities authorized by NRC Operating Licenses DPR-51 and NPF-6 for Arkansas
Nuclear One, Units 1 and.2, and to the discussion of our findings with
Mr. J. W. Yelverton and other members of your staff at the conclusion of the
inspection.
-Areas examined during the inspection included followup of events, operational
safety verification, surveillance, and maintenance. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
The
findings are documented in the enclosed inspection repoit.
Within the scope-of-+t.e inspection, no violations or deviations were
- identified.- Howevec, an additional example of a previously cited violation,
failure to perform a-surveillance requirement within the' required interval,.was
identified on April 1, 1990 .and reported by your staff.- This continued patte'rn
.of weaknesses in the scheduling and implementation of the surveillance program
concerns the staff.
During the last quarterly performanco meeting on April 24,
1990, the actions you have taken to improve your' surveillance test program were
discussed. While the. initial assessment of your actions appear appropriate,
the staff will continue to closely monitor the scheduling and performance of
surveillances to determine the long-term effectiveness of your program changes.
We-have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in -
Section 3.0 of the enclosed report.
,
RIV:RI
C:DRP/A
M
CCWarren
RCHaag
TFWesterman
J
s
3
5/23/90
Sh3/90
5/23/90
/90
'
I
9006040110 900524
ADOCK 05000313
Q
. , .
v
.
' ,
,,
Arkansas Power & Light Company
-2-
,
Should you have-any questions concerning this inspection, we will be pleased to
o
discuss them with you.
Sincerely,
OdginalS3 nedBy:-
0
Samuel J. Collins
Samuel J. Collins, Director
Division of Reactor Projects
-Enclosures:
Appendix - NRC Inspection Report
'
'50-313/90-09
50-368/90-09
cc w/ enclosures:
Arkansas Nuclear One
ATTN:
Early Ewing, General Manager
Technical Support and Assessment
P.0, Box 608
Russellville,. Arkansas 72801
Arkansas Nuclear One
ATTN: Jerry Yelverton, Director
a
-Nuclear Operations
P.0 Box 608
.
Russellville, Arkansas 72801
Combustion Engineering, Inc.
ATTN:
Charles B.'Brinkman, Manager
Washington Nuclear Operations
,
12300 Twinbrook Parkway, Suite 330
!
Rockville, Maryland 20852
1
1
Honorable Joe W. Phillips-
County Judge of Pope County
!
Pope County Courthouse
Russellville, Arkansas 72801
'
~ Bishop, Cook, Purcell & Reynolds
ATTN:
Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
i
~
Washington, D.C.
20005-3502
.i
1
.
x:s;
- .
.e
Arkansas Power-& Light Company
-3-
' Arkansas' Department.of Health
-ATTN: - Ms. Greta.Dicus, Director
Division of Environmental Health
Protection
'4815 West Markam Street
Little Rock,fArkansas 72201
,
Babcock & Wilcox
Nuclear Power Generation Division
- ATTN: Mr. Robert B. Borsum
_
1700.Rockville Pike,-Suite 525
Rockville, Maryland 20852--
U.S. Nuclear Regulatory Commission-
ATTN:
Senior Resident' Inspector
'l Nuclear Plant Road
Russellville,' Arkansas 72801
.U.S. Nuclear Regulatory Commission
ATTN: ' Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington,. Texas 76011
bec to DMB'(IE01)
bec distrib. by.RIV:-
- R. D.-Martin
- Resident IAspector
' DRSS-FRPS
- Section Chief (DRP/A)
Lisa Shea, kri/ALF
- RIV File
- DRP
- MIS System
- RSTS Operator
- Project Engineer (DRP/A)
- DRS
- T. ' Alexion,- NRR Project Manager (MS:
13-E-21)
- C
Poslusny, NRR Project Manager (MS: .13-D-18)
- w/766
._
a