ML20043C011
| ML20043C011 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/27/1990 |
| From: | Haverkamp D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NUDOCS 9006010181 | |
| Download: ML20043C011 (2) | |
Text
i X
+
I O T
U.S.NUCLEARREGULATORYCOMMISSION No. 90-31' REGION 1 Revision-2l 4
NOTICE OF SIGNIFICANT LICENSEE MEETING i
Licensee:
Connecticut. Yankee Atomic Power Company.
APR 171990 1
Facility:
Haddam Neck i
a Docket No:
50-213 m
Time and Date:
9:00 a.m.,' May 9,.1900 Location:
Main' Conference Room; Region -I Of.fice,-
King of Prussia, PA-
Purpose:
Meeting'to Discuss Plant Outage Activities and Restart-j Plan, and Northeast Utilities Fitness for. Duty' Program
}
1 NRC Attendees:
W. Hodges, Director, Division of. Reactor Safety,(DRS)
M. Knapp, Director, Division of' Radiation'. Safety and Safeguards (DRSS)-
J. Wiggins, Deputy Director, Division of Reactor' Projects I
-(DRP)
E. Wenzinger, Chief, Projects Branch Noi;4,-DRPJ D. Haverkamp,~ Chief, Reactor Projects Section:4A,.DRP A. Vegel,. Reactor Engineer, RPS 4A,' DRP-i T. Shediosky, Senior Resident Inspector, DRP-A. Asars, Resident Inspector, DRP p
i J. Strosnider, Chief, Materials'and Processes-Section, DRS p
R. Gallo, Chief,.0perations Branch,.DRS P.'Eselgroth, Chief, PWR Section, DRS L
N. Blumberg,. Chief, Operational Program Sections DRS:
R. Bellamy, Chief, Radiological: Safety..and Safeguards /
I Branch, DRSS W. Pasciak, Chief, Radiation-Protection Section, DRSS R. Bores, Chief,. Effluents-Radiation Protection Section, DRSS p
A. Wang, Project Manager, Project Directorate I-4L NRR=
. Licensee Attendees: W. Romberg, Vice President Nuclearf 0perations 1
E. DeBarba, Nuclear Station Director
-J. Laplatney, I&C Manager G. Bouchard, Nuclear Unit Director.
i i
M. Brothers, Senior Engineer i
l G. Van Noordennen, Supervisor, Nuclear Licensing
~
G. Malchiodi,-Fitness.for Duty: Coordinator i
Note: Attendance by NRC personnel at this-meeting should be made known by i
May 7, 1990 via telephone cal 1~to Donald R. Haverkamn or i
Tony Vegel, Regiun I, at FTS 8-346-5120.
l 9006010181 900427
^
DR. ADOCK 0500 3
Prepared by*
Donald R. Haverkamp:. Chief, RPS 4A
~/0FFICIAL?RECORDJCODY
.HADDAM NECK c1EETING NOTICE - 0001-0'.0-t t
5 a
1 7
g Distribution:
i
-J. M. Taylor, Executive Director for Opern+-ions J. Sniezek,t Deputy Executive Director for. % clear Reactor Regulation, Regional Operations and Research (DEDR)
-H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards and Operations Support (DEDS)
B. K. Grimes, Director, Division of Reactor Inspection and Safeguards, NRR l
J. Lieberman, Director, Office of Enforcement T. E. Murley, Director, Office of Nuclear Reactor'Regulati:an '.
-F Miraglia, Associate Director for Inspection and Safeguards,- NRR B. Boger, Assistant Director for Region I Reactors', NRR J. Caldwell, Regional Coordinator, EDO l
J, Stolz,-Director, Project' Directorate I-4, NRR-
Local Public Document Room (LPDR) 1 State of Co.,uecticut-bec:
Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs L
Section Chiefs 4
Public Affairs Officer (2 copies)
M. Miller, RI D. Holody, R:
K. Smith, RI l
Region I Receptionist DRMA Files i
DRP Files Bulletin Board M. J. DiDonato, DRP l.
)
averkamp/
f 0)/90 0FFICIAL RECORD COPY HADDAM NECK MEETING NOTICE - - 0002.0.0 04/09/90 1
,,.