ML20043B578
| ML20043B578 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 05/24/1990 |
| From: | Bournia A Office of Nuclear Reactor Regulation |
| To: | Gates W OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20043B579 | List: |
| References | |
| TAC-75770, NUDOCS 9005300244 | |
| Download: ML20043B578 (3) | |
Text
s O
May 24, 1990 Docket No. 50-285 Mr. W. Gary Gates Division Manager. Nucleer Operatier.s Omaha Put lic Power District 444 South 16th Street Mall Peil Stop BE/EI 4 Omaha, liebraska 6F102
Dear Mr. Gates:
SUBJECT:
CORRECTION TO AMENDMENT NO.130 TO F ACILITY OFERATING LICENSE NO DPR FORT CALH0lt STATION, UNIT NO.1 (TAC NO. 75770)
On May 2,1990, the Connission issued Amendment No.130 to f acility Operating License No. OPR.40 for the Fort Calhoun Station, Unit No. 1.
The amendment modified Technical Specific 6 tion (TS) 2.12, Control Room Systems, which applies to control room air condition and filtering systems. The amendment conservatively lowered the maximum limit for control room air temperature (from I?O'I to 105*f) upon which you are required to take action.
This change was necessary in order to more accurately direct the application of the TS to the equipment it was origirelly intended to address.
TS page P-59 contained an administrative error in which the change made to this page with Amendment No. 128 was not incorporated with the changes made with Amendment No.130.
A corrected copy of TS page ?.59 is enclosed.
Plrase accept our apology fer any inconvenience this error may have caused you.
Sincerely,
/s/
Anthony Bournia, Project Manager Project Directorate IV Division of Reactor Projects - Ill, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION:
t/Fo We~tW T E a NRC PDR Local PDR PD4 Reading G. Holahan F. Hebdon P. Noonan L. Constable, Rly A. Bournia (?)
OGC-Rockvlilt C. Hagan E. Jordan G. Hill (4)
Wanda Jones J. Calvo PD4 Plant file ACRS (10)
GPA/PA ARM /LFMB
$t" ~ hht7W '[i:thT/IK ~ ".."..'ihbl "i
....:......g
- . 7
!AME :PNoonan
- ABournia:t j :Fh don
'kT b5k/9b b5/5h9b b[/[4/bb omtunmwar--
wcwewreenc tammr-e 907 300;94 gogn rf P[ih (diou ON nw @.
F fly g
/ sc0 Msg'o UNITED STATES
[ '
w, I.,g NUCLEAR RE@ULATORY COMMISSION
.g t
W ASH 6 NoTON. D. C. 20$$$
k.....)
May 24, 1990 Docket No. 50-285 Mr. W. Gary Gates Division Manager - Nuclear Operations Omaha Public Power District 444 South 16th Street Mall Mail Stop BE/EP 4 Omaha, Nebraska 68102
Dear Mr. Gates:
SUBJECT:
CORRECTION TO AMENDMENT NO. 130 TO FACILITY OPERATING LICENSE NO. DPR TORT CALHOUN STATION, UNIT NO.1 (TAC NO. 75770)'
On May 2,1990, the Commission issued Amendment No.130 to facility Operatingi License No. DPR-40 for the. Fort Calhoun Station, Unit No. 1.
The amendment modified Technical Specification (TS) 2.12, Control Room Systems, which applies.
to control room air condition and filtering systems. The amendment conservatively-lowered the maximum limit for control room air tenperature (from 120'T to 105'r) upon which you are required to take action. This change was necessary J
in order to more accurately direct the application of the TS to the equipment it was originally intended to address.
TS page 2-59 contained an administrative error in which the change made to this page with Amendment No. 128 was not incorporated with the changes made with i
Amer 4 ment No. 130. A corrected copy of TS page 2-59 is enclosed.
Please accept our apology for any inconvenience this error may have caused you.
Sincerely, (l. deaf lbM w wi Anthony Bournia, Project Manager Project Directorate IV Division of Reactor Projects - III, l
IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page i
Mr. W. Gary Gates Fort Calhoun Station Oraha Public Power District Unit No. 1 cc:
Harry H. Voigt. Esq.
LeBoeuf, Lamb Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.
20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebreska 68008 Mr. Phillip Harrell, Resident Inspector U.S. I:uclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Corbustion Engineeririg, Inc.
12300 lwinbrook Parkway, Suite 330 Rockville, MD 20852 Regional Administrator, Region IV U.S. huclear Regulatory Connission Office of Executive Director for Operations 011 Pyan Plaza Drive, Suite 1000 Arlington, Texas 76011 Parold Borchert, Director Division of Radiological Health Departnent of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 fir. G. R. Peterson, Manager Fort Calhcun Station l
P. O. Box 399 l
Fort Calhoun, Nebraska 68023 l
l l
I
- m:.