Forwards DOE Weekly Rept for Wk Ending 900511
ML20043B006
Person / Time
Issue date: 05/21/1990
From: Gilray J, Prestholt P
NRC
To: Linehan J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-WM-11 HLWR, NUDOCS 9005240046
Download: ML20043B006 (5)


Text

__

.\\,,

UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION 5

WASHINGTON, D. C. 20b56

.g...../

Reply tot 1050 East Flamingo Road Sui t e 319 Las Vegas, Nevada B9119 Tel:

(702) 388-6125 FTS:

590-6125 TO:

John J. Linehan, Di rec t or, HLPD Di vi si on of High-Level Weste Management. M/S 4-H-3 FROM:

Paul T. Prestholt, Sr. : On-Si te Li censing Representati ve John W. Gilray, Sr. On-Si te Li censing Representati ve DATE:

May 21, 1990 SilDJECT :

DDE WEEKLY REPORT Please find enclosed the above-referenced report received in this office, i.e.,

for week ending May it. 1990.

There is nothing of any particular signi f i cance i n thi s report except f or a notation made on page two.

nan cc w/encs.:

King Stablein. H/S 4-H-3 Harold R.

Denton. M/S 17-F-2 Dean Kunihiro, Rggion 5 t

I(

Y" 99994o046 000521

[dB ppg WASIE PDC fM WM-11 I'llllTD(T ASClliCAN

/

g-

F 4 *,.

Department of Energy i

. g Nevaca Operations Office WBS 1.2.9 j

R O. Box 98518 QA N/A Las Vegas, NV 89193 8518

- w MAY 141990 Lake H. Barrett, Acting Associate Director, racilities Siting and Development, HQ (N4-20) FORS YUCCA MOUICAIN PM7ECI' WEEKLY HIGHLIGHTS FOR THE WI2K ENDING MAY 11, 1990 1.

Critical Item Status A.

Site Characterisation Plan (SCP) Progress Reports Yucca Mountain Project staff coupleted the review of compiled input for the Project Mchnical Status Report for the period of October 1989, through March 1990.

We Yucca Mountain Project Office (Project Office) submitted a final draft of the TSR to the U.S. Department of Energy / Headquarters (DOE /HQ) on May 11, 1990.

SCP Connents ne technical review of public questions and comments made during the March-April 1990, Public Update Meetings continued. Comments made by the technical leads are being incorporated.

SCP Study Plan Status: May 11, 1990 Screening reviews were ceapleted for draft Study Plan 8.3.1.17.4.5,

  • Detachment raults at or Proximal to Yucca Mountain," 8.3.1.2.3.2,

" Characterization of Saturated 2,one Hydrochemistry," and 8.3.1.4.2.1,

" Characterization of the vertical and Lateral Distribution of Stratigraphic Units in the Site Area." he plans have been forwarded for subsequent participant and DOE /HQ review.

S'IUDY PLAN BREAKDOWN Project Office Acceptance Review...

O Revision..............

1 Project Review.......

O Post-Project Office Revision....

0-Parallel Project Office /HQ Review..

10 HQ Review (Project Office Review complete).....

1 Awaiting comment resolution....

9 Post-HQ Revision..........

7 Project Office /HQ Audit.......

9 i

NRC Acceptance Review........

7 Revision O

NRC Start-Work Review...

O Revision O

NRC Acceptance 2

Total.....

46

Lake H. Barrott

  • gyy B.

Core Sample Management i

Sample Management racility personnel continued processing prototype core and cuttings from the Apache Leap, Arizona, site.

C.

Quality Assurance The integrated Office of Civilian Radioactive Weste Management /nacca Mountain Project Quality Assurance Requirements Document and the Quality Assurance Program Descr.iption wre submitted for-U.S. Nuclear Regulatory Connission (NRC) review and approval on April 13, 1990. Comment resolution, if required, is scheduled to begin on May 14, 1990.

D.

Exploratory Shaft racility (E$r) l Project E8r staff attended the EST Alternative Studies Task 4 h am meeting.

Staff also attended a briefing on the preliminary results of the Calico Hills study..

E.

Long Range Planning (LRP) and Project Planning and Control-System (PACS)

Phase 2 activities for the LRP update continued on schedule.

Devetlopment of the PACS Inglementation Schedule Plan'was completed.

A meeting to present the plan to the participant PACS representatives.has been planned.

Draft procedures to support the PACS are scheduled for completion f

next week.

F.

Environmental Permitting A draft of the first Environmental Monitoring and Mitigation Plan i

Progress Report was completed. We report, which covers monitoring activities from September 15, 1988, to September 30, 1989, is being reviewed by the Project Office prior to D0t/HQ review.

G.

Nuclear Waste Technical Review Board Meetings and Interactions-No significant interactions to report.

Significant Accomplishments /Information Items II.

he monthly-Project Manager-h chnical Project Officer (TPO) Planning and Budget meeting was held on May 10, 1990, in Las Vegas, Nevada.

We next-meeting is tentatively scheduled for May 30,1990. %e. M aw 1 Q m e eb a *)

he review of the Waste Acceptance Preliminary SpeciNakion.loLede c

ca s Document' was completed.

Consents wre transmitted to the Project Office.

i

t. m 4 :

m l

4

+

~

thke H.-Barrett g y4 i

Preparations are underway for upcoming presentations to the National l

Academy of Science, scheduled for May 30, 1990, in

{

Menlo Park, California. Materials are also being prepared for the i

NRC technical exchange on significant faulting and the subsequent

)

Yucca Mountain site visit.

III. Upcoming Events-l i

Please note that the usage of "(P)" in the Upcoming Events Calendar

]

indicates that the event is open to the public.

=i Date Event Location Participant

)

A.

Coordinating Group Meetings None.

B.

HQ Meetings j

hursday, Program Management Washington, C. Gerts, j

May 24 meeting DC Project Office

Thursday, Program Management Las Vegas, C. Gerts, June'21 meeting W

Project Office C.

Internal Project and DOE / Nevada Operations Office (W) meetings t

Wednesday Manager's (W)

Las Vegas, C. Gerts, May 16 Program Review W

Project

-Office I

Wednesday, Monthly Planning Las' Vegas, C. Gerts, j

May 30 and Budget meeting W

Project (tentative)

Office

nursday, TPO meeting Las Vegas, C. Gerts, May 31 W

Project (tentative)

Office D.

State and Public Interactions i

Wednesday, Presentation to the

'Ibnopah, M. Powell, l

May 16 Society of Mining W

Project Metallurgy &

Office Exploration, Inc.

Tuesday, Cannen Jr. High Las Vegas, M. Powell',

May 22 School W

Project Office C. Gerts,

[

Tuesday, Clark County Las Vegas, May 22 optimist Club W

Project Office

MAY I 41990 i

Laka ti. marrott,

Date Event Location Participant Tuasday-International sympo-

Golden, C. Gertz,-
rriday, sium on Unique Under-CO Project June 12-15 ground struct' ares (P)

Office t

E.

Yucca Mountain Project Tabletop Exhibit _Shewings (P)

None.

l F.

NRC Interactions Wednesday, Regulatory strategy Rockville, M.' slanchard, i

May 30 meeting MD Project Office l

G.

Other i

Thursday,.

NWrRB Site Visit Albuquerque, D. Dobson, May 17 to SNL IM

Project

. Office-

_rriday, NWIRB Site Visit-

' Apache Leap, D. Dobson, May 18 to Apache Leap At Project Office 1

Carl P. Gerts, Project Manager YMPtDLH-3290 Yucca Mountain Project Office I

l l

l f

Ni e

f A

4 e

. }

o i

.}

i n

9 y

.4 9

, --.