ML20043A880
| ML20043A880 | |
| Person / Time | |
|---|---|
| Site: | Yankee Rowe |
| Issue date: | 05/02/1990 |
| From: | Knapp M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kadak A YANKEE ATOMIC ELECTRIC CO. |
| References | |
| NUDOCS 9005230235 | |
| Download: ML20043A880 (6) | |
Text
... _..... _.. _..........
MAY 'O 2' 1990 :
.l l
Docket No.-50 '
Yankee Atomic Electric Company ATTN:
Dr. Andrew C. Kadak President and Chief Operating Officer 580 Main Street Bolton,. Massachusetts 01740-1398 Conference Attendees:
l
~
Subject:
Radiation Protection Manager's Conference
. Enclosed is the agenda for the NRC-Region'I Radiation Protection Manager's l
Conference. The conference was announced'in my letter to you: dated i4 arch 19,-
1990. The conference will be beld at the Valley Forge Hilton,_ King of Prussia, 1
Pennsylvania on May 23-24, 1990 -
I look forward.to your participation in this conference.
Sincerely, f
j
.j
[.
I Malcolm Ri.Kna p, Director.-
Division of' Radiation Safety; and Safeguards.
Enclosure:
1 Agenda-for the Radiation Protection Manager's.
1 Conference i
5
$g
O M q g-to 50YRossaggggg2,,
b e8c 9\\
' Yankee Atomic. Electric' Company 2
MAY 02 1Rgr cc.w/ enc 1:
N. St, Laurent, Plant Superintendent G. Papanic, Jr., Senior Project Engineer
. Licensing R. Hallisey, Dept. of Public Health, Commonwealth of Massachusetts Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector-
,3 Commonwealth of Massachusetts, SLO Designee State of Vermont, SLO Designae
~
t
.?
t i
f 1
l I
t l:
0FFICIAL RECORD COPY RAD PRO CONF - 0062.0.0 l:
04/24/90
. c.
t
,' Yankee l Atomic Electric Company 3t MAY 0 21999; t
~
bcc w/ enc 1::
- Region.I-Docket Room (with concurrences)
M. - Perkins_, DRMA (w/o encl)
R. Bellamy, DRSS
- R. Blough,-DRP.
M. Conner, SALP Reoorts Only i
H. Eichenholz,= SRI - Vermont Yankee-(w/ concurrences)~
G. Grant, SRI - Vermont Yankee-
- J.' Johnson' DRP K.' Abraham,: PAO-(20) SALP Report and'(2) All Inspection Reports-J. Caldwell,:NRR-
. M. Fairtile, NRR
+
f I
I I
e OFFICIAL RECORD COPY FU(D PRO CONF - 0063.0.0 04/24/90 g
+%.-
=
W
h i
AGENDA REGION I RPM /NRC WORKSHOP t-q 23, 1990
' Wednesday, May 8:00-8515 Workshop Welcome Dr. Malcolm Knapp, Director -
Division Of Radiation Safety.
e and Safeguards (DRSS)
.NRC Region I 8:15 - 8:30' Meeting Format and Dr. Walter-Pasciak, Chief Introduction of Moderators Facilities Radiation; Protection Section, DRSS 8:30 - 8:45 NRR Comments Thomas Essig, NRR HQ.
Session.1 - Exposure Controls Moderators and Discussion Leaders -
T. Cellmer.Public Service Electric and Gas Company.
R. Nimitz - Nuclear Regulatory Commission
.8:45
.9:15 Radiological Consequences-of Unexpected Crud Bursts-S E
.8:45 - 9:00. E. Cohen - Ducuesne Light' Company
[
9:00 - 9:15 R. Gary - Public. Service-Electric -
i
~
l
- and Gas Company i
9:15 - 9:45 Status of the "New" 10 CFR 20 Including the Application of. Beir V
~
t T. Essig - Nuclear Regulatory Commission-9:45
.10:00 Prenatal Radiation Exposure - Arbitration J. Kelly - New York Power Authority 10:00 - 10:20 Break 10:20 - 11:00 Exposure of Fertile Females f
D. Chawaga - Nuclear Regulatory Comission
.11:00 - 11:30 Dosimetry Placement-R. Pederson - Nuclear Regulatory Commission 11:30 - 12:00 Open Discussion 12:00 - 1:00 Lun,ch I
s 1
.I i
-4
y N
2 Session 2-Contamination Control.
Moderators and. Discussion' Leaders
- B. Murray. = Nuclear Regulatory Commission, Region >IV H..Riley:- Pennsylvania Power and Light-Company 1:00 - 1:30 Current Status of Hot Particle Efforts and I.mpact on' l
-Enforcement-.
i T. Essig - Nuclear Regulatory Commission, HQ
.,q 1:30;- 2:00 = Ingestion of a Hot Particle P.- Volza Niagara. Mohawk Power Corporation 2:00 - 2:20. Break' 2:20 - 3:00 Respiratory Protectiori Program. Issues :
R.;Pederson - Nuclear Regulatory Commission. HQ 1
3:00 - 3:30 Radiological Controls for! Steam; Generator Work-
'J..Wray, Public' Service Electric and~ Gas Company 3:30 - 4:00 -Open. Discussion 4
Thursday,:May-24, 1990-Session 3 --Administrative Issues and NRC Policy.
Moderators and Discussion Leaderst I
T.:Dragoun - Nuclear Regulatory Commission, Region I l
R. Dubiel - Philadelphia Electric Company i
8:00 - 8:15 The New, EPA Emission Standards'and the NRC o
1 T. Essig - Nuclear. Regulatory Commission, HQ-l 8:15 - 8:30 Posting of Radioactive MaterialL Storage Areas -
R. Nimitz - Nuclear Regulatory Connission, Region. I l:
8:30 - 9:00 Self Assessments and Training Program Improvements L
1 H. Riley Pennsylvania Power and Light Company
[
9:00 - 9:30 Converting RETS to an ODCM and Environmental Monitoring T. Essig"- Nuclear Regulatory Connission, HQ.'
s F
9:30 - 10:00 Brookhaven ALARA: Activities J. Baum/T. Kahn <- Brookhaven National Lab i
i 10:00 - 10i20 Braak; 10:20 - 11:00 Dosimetry Testing - Status of the Revised ANSI Standard Dr. S. Sherbini Nuclear Regulatory Connission L
t-
=
N
1 l
1 l
3 l-11:00 - 11:30-Health Physics Audits-B; Murray, Nuclear Regulatory Commission, Region IV
]
11:30 - 12:00 Open discussion -
-12:00 - 1:00 Lunch
' Moderators and Discussion Leaders:
Dr. S. Sherbini ~- Nuclear Regulatory: Commission.
4 D. Quinn
.New York Power Authority' '
1:00 - 1:30 Use of 10 CFR 20.302 including DisposalLof' Sewage Sludge T. Essig - Nuclear Regulatory Commission 1:30 - 2:00' Determination of' Dose-t
.P. O'Connell:- Nuclear Regulatory Commission 2
2:00 - 2:20 Break 2:20 - 3:00 High Radiation _ Area' Access Control Requirements.
T. Dragoun - Nuclear Regulatory Commission 3:00 - 3:30 Open Discussion-l' 3:30 - 3:45 Concluding Remarks 1 Dr. R. Bellamy, Nuclear Regulatory Commission,tRegion I.
I i
l
i i
i.
W 0
4 A
L t '.
.