Text
.
..,, EMERCENCY CORE C00LINC SYSTEMS-SURVIILIANCE REOUIREMINTS (Centinued)
==
1.
The automatic interlock function of the RHR System shall be verified within the seven (7) days prior to placing the RXR System in service for cooling of the Reactor Coolant System.
verifying.with a test' signal corresponding to a reactor coolantThis shall be pressure of 375 psig or greater, that the 2RM1 and 2RM2 valves i
cannot be opened.
- (Footnote from page 3/4 5-6)
Flow balance testing pursuant to Specification 4.5.2.h shall be performed the first time the unit is in COLD SHUTDOWN after December 15, 1981.-
- (Footnote to page 3/4 5 6 item h.2)
The maximum limit (i.e. s 550 gps) on ECCS Centrirugal Charging Pump Flow is waived on a orge. time basis for the period commencing January 4, 1990 and ending upon initial entry into Mode 5 during the Unit 2 5th Refueling Outage, l-l' L
l L
l i=
i=
l '.
L L-r i L'
To be implemented before startup from the fifth refueling outage.
SALEM - UNIT 2 3/4 5 6a Amendment No. 84 L
CORRECTION LETTER DATED MAY 14, 1990 9003220182 900514 PDR ADOCK 05000311 L