~x 4

~

. 1 Power Distribution Technology-Docket / Report No. 99901128/88-01 APPENDIX A NOTICE _0F NONCONFORMANCE-

,q i

I Based on the.results ofian NRC inspection conducted October ~17 through 19, 1988;

'it appears that certain of your activities were not conducted in accordance.

1 with'NRC_ requirements which were; imposed on you by purchase order contracts' with NRC1 licensees. Nonconformances with these requirements'are:as follows:

LA.

-Criterion V;of Appendix B'to110 CFR Fart 50, " Instructions, Procedures,

.and Drawings,". states: " Activities affer. ting quality shall-be prescribed by documented instructions,. procedures, or drawings, of a type appropriate' to the circumstances!and-shall-be accomplished in accordance with these

. instructions,. procedures, or-drawings.' Instructions, procedures,-or _

drawings shall include appropriate quantitative or qualitative acceptance criteria for determining that important: activities have'been.satisfac-

-torily accomplished;"'

Contrary to;the above, Power: Distribution, Technology procedure PDT-QA-07, I

' Document' Control. and Distribution," was not appropriate -to the c1rcum-L q

stances,in that it did not require that current revisionsito' vendor technical manuals and. product bulletins be obtained:and'used for work' l

performed on safety-related circuit breakers..(88-01-01) o B.

Criterion XI of Appendix-B to 10lCFR Part 50, " Test Control;" states', in

~f part: "A test program shall be established to assure that:nll-testing required to demonstrate that. structures, systems,'and components will perform' satisfactorily in service is identified;and performed in' accor..

dance with written test procedures'which' incorporate 1the requirements and j

acceptance' limits contained in applicable. design' documentst...":

Contrary to the above,_ Power Distribution. Technology test procedure PDT-0P-04 did not incorporate acceptance limits contained.in applicable design documents in that the trip' time acceptance limits listed in the procedure wereitaken.from a combination of sample. curves inithe' vendor' technical manual generated for'a particular Setfof pickup and. delay settings that'maj be (and, in the cited instance,"were).different from i

those of breakers under test.