-- e [

J c. CQ R4(Ng# ]

5 0,

' UNITED STATES /

y

,:J

^

. NUCLEAR REGULATOR (COMMISSION"

~

ff WASHINGTON, D. C. 20655 f

I..

[

.May 14.-'1990-

. (...

99901'28/88-01' Docket.No.-

1 e

Mr. RL-S., Walker President

Power Distribution Technology.

o

,15115 Shady! Grove Road.

1A Roct,ville, Maryland J20850.-

Y

Dear Mr.- Walker:

t

~This letter. addresses;.the inspection of your;facilitiesiat Newport' News.t,

J Virginia, conducted by; Messrs. J.7Jacobson and.T. Silko"of this office onJ ~

0ctober 17 through 19.-1988,?and the discussions of theirJfindings'with L Mr.1R. Shematek, and;other members of'ycur staff at the conclusion of
the4:

i.nspection..

D The' purpose of:the inspectio'n was to. review Power Distribution Technology 3 1

activities in the area:of circuit breaker refurbishment.m Release of this.

M report was delayed during NRC's ongoingsre'v1ewgof nonconforming and: substandard l

vendor' pro; ducts.

4 1

4

~

.i Areas examined during the inspection and ourifindings:are discussed in!the" enclosed report. <This~ inspection consisted'of.an examination of, procedures and' 4

representative records, interviews with personnel,$and. observations by-the.

inspectors.

Al During this inspection, 'it;was;found that' thefilmplementation:of Lyour; quality -

[

assurance program; failed:to meet' certain NRC requirements, as imposed upon:you in' licensee safety-related procurement documents, relating-to adequacy of

,{

procedures and test; control. The' specific findingsTand references.to the:

1 w

pertinent requirements are identified in the enclosures to this.Lletter.

4 Please provide us, 'within 30 days from the'date of this, letter, a written-1 statement containing..

-(1) a' description of steps that.have~ been or will;be:taken ito correct the 1

cited deficiencies;.

(2) a ' description of steps that have been or will be taken to prevent-s

' recurrence; and (3) the dates your corrective actions an'd preventive measures were or 'will be completed.

We will consider extending -the response time if you-canishow good cause forz us y

to do so.

If' 1

I (fi 9005210121 900514

"~

r Olb p

m 3

7 y-

m_

kr.R.S. Walker May 14, 1990 i'

The responses requested by this letter are not subject to the clearance proce.

~ dures of the Office of Management ~ and Budget as required by-the Paperwork

~ Reduction Act of 1980, PL 96-511.

In accordanceLwith 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed. inspection report will be placed in thc--NRC's 3

Public Document Room.-

i Should you have any questions concerning this inspection, we will be pleased:

to discuss them with you.

Sincerely, 1

ORIGINAL SIGNED BY:

ULDIS POTAPOVS FOR E. William Brach, Chief Vendor: Inspection Branch Division of. Reactor Inspection.and' Safeguards.

-i

.0ffice of Nuclear. Reactor Regulation

Enclosures:

1.

Appendix A. Notice of Nonconformance 2.

Appendix B. Inspection Report 99901128/88-01.

i i

DISTRIBUTION:

Wocket, control / RIDS CODE NRR:09 i

VIB Reading DRIS Reading BKGrimes jl' EWBrach UPotapovs

.SAlexander

/ k l

OFC

VIB MIS:NRR
VlB:

IS:NRR :C:V;.j:DRIS:NRR:

IS - R

.j i.........:..

.........:.0y.......__.

-i

NAME A exander:sda :UPo apovs

[' WBrach es-

.............___:.........__..f:.............. :_...___...... : ___.........:.........__.

3

5/q/90 5/9/90
5/fV/90 DATE' :5 F1/90 i

/

qw W 0FFICIAL RECORD COPY Document Name:- POWER DISTRIBUTION LETTER 4