Text
.
-- e [
J c. CQ R4(Ng# ]
5 0,
' UNITED STATES /
y
,:J
^
. NUCLEAR REGULATOR (COMMISSION"
~
ff WASHINGTON, D. C. 20655 f
I..
[
.May 14.-'1990-
. (...
99901'28/88-01' Docket.No.-
1 e
Mr. RL-S., Walker President
- Power Distribution Technology.
o
,15115 Shady! Grove Road.
1A Roct,ville, Maryland J20850.-
Y
Dear Mr.- Walker:
t
~This letter. addresses;.the inspection of your;facilitiesiat Newport' News.t,
J Virginia, conducted by; Messrs. J.7Jacobson and.T. Silko"of this office onJ ~
- 0ctober 17 through 19.-1988,?and the discussions of theirJfindings'with L Mr.1R. Shematek, and;other members of'ycur staff at the conclusion of
- the4:
i.nspection..
D The' purpose of:the inspectio'n was to. review Power Distribution Technology 3 1
activities in the area:of circuit breaker refurbishment.m Release of this.
M report was delayed during NRC's ongoingsre'v1ewgof nonconforming and: substandard l
vendor' pro; ducts.
4 1
4
~
.i Areas examined during the inspection and ourifindings:are discussed in!the" enclosed report. <This~ inspection consisted'of.an examination of, procedures and' 4
representative records, interviews with personnel,$and. observations by-the.
inspectors.
Al During this inspection, 'it;was;found that' thefilmplementation:of Lyour; quality -
[
assurance program; failed:to meet' certain NRC requirements, as imposed upon:you in' licensee safety-related procurement documents, relating-to adequacy of
,{
procedures and test; control. The' specific findingsTand references.to the:
1 w
pertinent requirements are identified in the enclosures to this.Lletter.
4 Please provide us, 'within 30 days from the'date of this, letter, a written-1 statement containing..
-(1) a' description of steps that.have~ been or will;be:taken ito correct the 1
cited deficiencies;.
(2) a ' description of steps that have been or will be taken to prevent-s
' recurrence; and (3) the dates your corrective actions an'd preventive measures were or 'will be completed.
We will consider extending -the response time if you-canishow good cause forz us y
to do so.
If' 1
- I (fi 9005210121 900514
"~
r Olb p
m 3
7 y-
m_
kr.R.S. Walker May 14, 1990 i'
The responses requested by this letter are not subject to the clearance proce.
~ dures of the Office of Management ~ and Budget as required by-the Paperwork
~ Reduction Act of 1980, PL 96-511.
In accordanceLwith 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed. inspection report will be placed in thc--NRC's 3
Public Document Room.-
i Should you have any questions concerning this inspection, we will be pleased:
to discuss them with you.
Sincerely, 1
ORIGINAL SIGNED BY:
ULDIS POTAPOVS FOR E. William Brach, Chief Vendor: Inspection Branch Division of. Reactor Inspection.and' Safeguards.
-i
.0ffice of Nuclear. Reactor Regulation
Enclosures:
1.
Appendix A. Notice of Nonconformance 2.
Appendix B. Inspection Report 99901128/88-01.
i i
DISTRIBUTION:
Wocket, control / RIDS CODE NRR:09 i
VIB Reading DRIS Reading BKGrimes jl' EWBrach UPotapovs
.SAlexander
/ k l
OFC
- VIB MIS:NRR
- VlB:
IS:NRR :C:V;.j:DRIS:NRR:
IS - R
.j i.........:..
.........:.0y.......__.
-i
- NAME A exander:sda :UPo apovs
[' WBrach es-
.............___:.........__..f:.............. :_...___...... : ___.........:.........__.
3
- 5/q/90 5/9/90
- 5/fV/90 DATE' :5 F1/90 i
/