ML20043A119

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1990 for La Crosse Bwr
ML20043A119
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/30/1990
From: Berg W, Christians R
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LAC-12924, NUDOCS 9005180078
Download: ML20043A119 (5)


Text

.

m

- z. ;

DA/RYLAND:

p:h b[M[:

COOPERAT/VE

  • 3200 EAST AVE. SO.

May.9,.1990'-

-(808)788 4000

. FAX NO (608) 7871420 '-

Tj

' WILLIAM L. BERO In reply, please 0:neral Manager refer to' LAC-12924 1 7 l

DOCKET.NO.'50-409 Office of Management Information.

L and Program' Control

-U. S. Nuclear Regulatory Commission L

' Washington, DC 20555 j

Gentlemen:

s

SUBJECT:

Dairyland Power Cooperative.

.La Crosse Boiling Water Reactor (LACBWR)

~

Possession-Only License No. DPR-45 Monthly Operating' Data for April 7

REFERENCES:

. 1).NRC. Letter, Reid to Madgett, i

dated September 19,-'1977.-

2) NRC Letter,'Reid'to Madgett, dated December 29,-1977.

In accordance-with instructions contained' in Reference (1) And Technical Specification Amendments contained in Reference (2).-we are submitting.

information concerning operability;and availability of the La Crosse-Boiling Water Reactor (LACBWR) for the month of April.

J The La Crosse Boiling Water Reactor was permanently shut down on' April 30, 1987. All cumulative operability data'has been fixed'at the end of 7

April 1987, since.that was the termination of plantsoperation'.

s Please contact us if there-are any questions concerning this' report.

3 Sincerely, DAIRYLAND POWER COOPERATIVE hbb William L. Berg, eneral Manager

}

L WLB: REC:dh 3

/

A. Bert Davis, Regional Administrator NRC-DRO-III

/.

cc:

Peter Erickson, LACBWR Project Manager D. Sherman (ANI Library) j i

PC1-50 90o519oo7e 9oo43o 3

q PDR ADOCK 05000409

~

. i f/

.R PDC fjs a

m i

~

i-4 NARRATIVE SlTrtMARY OF OPERATING EXPERIENCE' APRIL-

~

The La Crosse BoilingLWater Reactor.was permanently shut down on; April 30, 1987.- Defueling of the reactor was' completed June 11, 1987.

{

t During the' month of-April,~no safety-related. maintenance was performed.-

A-Type-B leakage. test was performed on the Personnel Airlock with.

. satisfactory results..The_ leakage rate measured during the: airlock test.

-. i 1

performed on April-10,.1990, was_0lSCFH.' -A-leak test was also performed on i

the Containment Building Ventilation _ Damper inlet' valves. The' measured leakage of.027-SCFil'is satisfactory.

-]

,I

-a

.j il
l i

i i

)

-]

I

..]

i,

1

't p

.l OPERATING DATA REPORT 50-409-

. DOCKET NO.-

DATE 05/09/90 COMPLETED BY R. Christians ~

TELEPHONE. 608-689-2331

-i i?

OPERATING STATUS ~

1.

Unit Names _.La Crosse Boilina' Water Reactor 2.

Report Period:

0000,-04/01/90 to 2400, 04/30/90-1 3.~ Licensed 1 Thermal Power (HWt)4 165 4.: Nameplate-rating (Gross HWe):

65.3 5..

Design Electrical = Rating (Net lMWe):-

50 j

6.

Maximum Dependable Capacity._(Gross MWe):'

-50 1

7.

Maximum-Dependable Capacity (Net MWe):~

14 8 1

If Changes Occur in Capacityf atings'(Items;3 Through:7) Since Last. Report,iGivef R

8..

x Reasons:=

[

9..

Power Level to Which Restricted, If Any;(Net MWe):

Permanently shut down l10. Reasons for Restrictions,'If Any:

3 This Month-Year-to-Date' JCumulative 11.

Hours In Reporting. Period 720 2,880 181,847 l-12.

Number of Hours Reactor Was Critical N/A N/A 103,287.5-13.

Reactor Reserve Shutdown Hours N/A N/A 517.2 7

14.--Hours Generator On-Line N/A-N/A-96,274.6-i

15. Unit Reserve Shutdown Hours N/A' N/A-120.5 j

L

16. Gross Thermal Energy Generated (MWH)

N/A N/A 13,452,146.2

17. Gross Electrical Energy Generated (HWH)

N/A N/A 4,046,923 1

18. Net Electrical' Energy Generated (MWH)

N/A N/A-3,754,984 l

19.

Unit Service Factor N/A-N/A' 62.8 20.

Unit Availability Factor N/A N/A 62.9 l

21.

Unit Capacity Factor (Using HDC Net)

N/A N/A 51.0

22. Unit Capacity Factor (Using DER Net)

N/A N/A-49.0 1

23.

Unit Forced Outage ' Rate N/A N/A 11.7 24.

Shutdowns Scheduled Over Next 6 Months'(Type, Date, and Duration of Each):

1 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved

-i INITIAL CRITICALITY l

INITIAL ELECTRICITY j,

COMMERCIAL OPERATION a

l

.PCl-50

t

.. r AVERAGE DAILY UNIT. POWER LEVEL DOCKET No,.

50-40'9

. UNIT

-LACBWR DATE:

05/09/90 COMPLETED BY R. Christians-

= TELEPHONE 608-689-2331 i

F MONTH April-t;;

DAY AVERAGE DAILY POWER LEVEL DAY.

- AVERAGE DAILY POWER: LEVEL

[

(MWe-Net)

-(MWe-Net)

L

.1 N/A 17.

'N/A 2

N/A

'18 N/A-t 3

'N/A 19 N/A I

4 N/A 20 N/A 5

N/A-21-N/A 6=

N/A

.22-N/A-7

-N/A-23

'N/A-8 N/A 24 N/A f

9 N/A 25

'N/A' 10 N/A 26

'N/A.

11 N/A 27-

.N/A 12 N/A-28 N/A i.

13 N/A 29 N/A~

14 N/A

'30 -

N/A' y

15 N/A 31 N/A 16 N/A Instruction On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

.j -

j PCI-50 t

1 i

I

4 UNIT SHUTDOWNS.AND POWER REDUCTIONS

- 4 DOCKET NO. 409

~

UNIT NAME LACBWR DATE 05/09/90 REPORT MONTH April COMPLETED BY-R. Christians TELEPHONE 608-689-2331 e

s s

t t

t t

t t.

I 4

I I

f f

f 9

I I

t-l l

l l

l

!. Method of

Licensee l l

l Cause & Corrective

-l l

l l

l Duration l l Shutting Down! Event l System l Component l Action to

l.'

' No. l Date l Type l (Hours) l Reason l.

Reactor 3 l Report # l Code l Code 5 l

2 4

l Prevent Recurrence l~

l l

l l

l l-l l'

e i

t t

t

-t i

i e

-i i

e e

l87-5 l04/30/87l S l

720.0 l

H l

1 l

NA-l

-NA l

NA l Permanent Shutdown l

8 8

8 I

I I

9 1

8 9'

I e

f e

4 i

i i

I t

I f

8 I

e 0-t 8

i t

t "p.

O I

f f

I 1

8 I

i 9

3 t

I 9

4

't t

'e i

e o

I

_ t t

3 6

I I

g 9

I i

e i

t t

4 4

6 8

8 8

8 I

e I

I f

f 8

8 8

I t

e e

8 1

e i

.I I

4 1

1-8 1

8 9

9 8

9 3

I e

i 1

4 6

t 8

9 9

9 I

i i

I I

I f

3 3

-I t-t i

I i

4 8

I f

4

-l' B

t a

i 8

I I

I

't i

t 8

i t

t I

e t

4 I

I I

I' t

i I

I I

i t

l' t

I t

8 i

e i

e c

9 i-i i

e f

I f

8 8

I t

t t

l' I

t I

f I

f f

8 I

1 1

'f n

i i

i-i e

4 e

8-t t

I i

8 3

I s

t t

9 9

e i

I I

I 1

t 8

-l'

-I e

s t

t 0

f f

(

t t

i I

i 1

1 4

8

't

-t t

I 8

I i

8 e

i f

f I

I t

~n a

9 i

i

.e i

i 8

i e

t i

i e

i 8

i I

I I

S I

t i

i i-E i

e i

1 4-in i

t I

I I

t

't' 8

8-t l

l l.

1

'2 3

i+ -

' Reason Method ~

Exhibit G-Instructions'for F:

Forced A-Equipment Failure (Explain) 1-Manual.

Preparation of Data Entry Sheets'-

S: Scheduled B-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER)

C-Refueling 3-Automatic Scram File (NUREG-0161)

D-Regulatory Restriction 4-Other (Explain)

E-Operator Training & License Examination

'F-Administrative 5

G-Operational Error'(Explain)'

Exhibit 1 --Same Source H-Other-(Explain)-

~

, _.m

__