UNITED STATES
,[
NUCLEAR REGULATORY COMMISSION 4,,.....,/g i
ti.
WASHINGTON, D, C,20666 ARKANSAS POWER AND LIGHT COMPANY' DOCKET NO. 50-368 4RKAt!SASNUCLEARONE, UNIT ~2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.104-License No. NPF-6 1.
The Nuclear Regulatory Comission.(the Comission) _has found that:
A.
The application for amendment by' Arkansas Power and Light Company
'(thelicensee)datedDecember 15,.1989, con. plies with the standards 1
and requiren.ents of. the' Atomic Energy Act of ~1954, as amended (the Act), and the'Comission's rules and regulations set forth in 10 CFR Chapter I; D.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the. rules and regulations.
I of the Comission; 1-C.
There is reasonable assurance:
(i) that the activities authorized L
by this amendment can be conducted without endangering-the health and safety of the public, and (ii).that such activities wili be conducted in. compliance with the Comission's regulations;,
D.
The issuance. of this license amendment will not be inimical to the-I comon defense'and security or to the health ar.d safety of the public; and E.
The issuance of this amendment'is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements 'have-been satisfied.
5
[
I l
.I v
90051]hk
[
PDR P
2 2.
-Accordingly, the license is amended by changes to the Technical Specifications as it.dicated in the attachment to this license cri.endment, and Paragraph 2.C.(2)' of facility Operating License No.
I tiPF-6 is hereby amended to read as follows:
2.
Technical Specifications.
The Technical Specifications contained in Aspendix A, as revised through Amendment No.104, arr hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical-Specifications.
3.
The-license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
l
' O)m
_h+
Frederick J. Hebdon, Director '
Project Directorate IV-Division of' Reactor Projects -'III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical..
Specifications Date of Issuance: April 30, 1990 i
i l
l
ATTACHMENT T0 LICENSE AMENDMENT NO.104
[A,CILITYOPEP.ATINGLICENSENO.NPF-6 DOCKET NO. 50-368, Revise the following page of the Appendix "A" Technical Specifications with.the attached page. The revised page is identified by An.endment number and ccntains a vertical line indicating the area of chenge. The corresponding overleaf pese is.also provided to maintain document completeness.
.)
REMOVE PAGE INSERT PAGE i
3/4 9-9 3/4 9-9
- );
q l
I I
~
l
.1
.~
9 '
REFUELING OPERA 110NS SHUTDOWN COOLING A.ND COOLANT' CIRCULATION SHUTDOWN COOLING - ONE LOOP LIMITING CONDITION FOR OPERATION i
3.9.8.1 At least~one shutdown cooling loop:shall be in operation.
l-(
APPLICABILITY:
MODE 6.
ACTION:
i a.
With less than one shutdown cooling loop in operation, except as
~
provided in b. below, suspend all operations involving an increase in the reactor decay heat load or a-reduction in' boron-concentration of the Reactor Coolant System.
Close all containment penetrations providing direct access from the containment atmosphereLto the outside atmosphere within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, b.
The shutdown cooling loop may be removed.from operation for'up'to-
- 1. hour per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period during the performance of CORE ALTERATIONS.
The provisions of Specification 3.0.3 are not applicable.
c.
SURVEILLANCE REOUIREMENTS 4.9.8.1 A shutdown cooling loop shall be determined to be in operation and-circulating reactor coolant at a flow rate of 2 2000 gpm at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
l l
i
\\
ARKANSAS - UNIT 2 3/4 9-9 Amendment No. 29,104 l
L
..