a Nebraska Public Power District
" ' "
- n "" ARM 2"A?^ "'"
--..nw.
CNSS907214 May 4, 1990 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555;
Subject:
Monthly Operating Status Report for April 1990, Docket No,.50 298 I
Gentlemen:
o Enclosed for your information and use is the Cooper Nuclear Station Monthly.-
0perating Status Report for April 1990. The report includes Operating Status,.
Avorage Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.
Should you have anf comments or require additional information regarding this report, please contact me, Sin erel,:
/~
G. R.) Horn
~ Division' Manager of Nuclear Operations GRH/EAK:Ju Enclosures cc:
G. D. Watson w/ enc, L
R. D. Martin w/ene.
2 MM
- _ _ - - - _ =
= = = = = = =
- = = = = =.
ec.
'j ',
s(
L..
OPERATING DATA REPORT 1
.t
.c E
DOCKET NO, 050-0298,
- UNIT CNS DATE May 4 '. 1990
- OPERATING STATUS-TELEPHONE (402')' 825-5291'
- i 1.
Unit dame:
Coooer Nuclear Station Notes 2.
Reporting Period:
Aoril 1990 3.'
Ucensed Thermal Power (MW:):
2381 4
Nameplate Rating (Gross MWe):
836
[
6 Design Electrical Rating (Not MWe)i 778 6/
Maximum Dependable Capacity (Gross MWe): 787 7,
. Maximum Dependable Capacity (Not MWe):
764
- ' B.
if Changes Occur in Capacity Ratings (Items Number 3 Throech 7) Since Last Report, Give Reasons:
- g, Power Level To Which Restricted,if Any (Not MWe)
- 10. :
Reasons For Restriction lf Any:
?
This Month Yr. to-Date
' Cumulative 11.
Hours in Reporting Period 719.0 2.879.0 138.792.0 12 Number of Hours Reactor Was Critical 0.0 1.465.0 104.113.2
- 13.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 '
14.
Hours Generator On-Une 0.0 1.465.0-102.496.7 L
-15c
- Unit Reserve Shutoown Hours 0.0 0.0 0.0 -
16 Gross Thermal Energy Generated (MWH) -
0.0 3.307.528.0 205.990.558.0 17.
Gross Electrical Energy Generated (MWH) 0.0 1.108.739.0
_ D6.444.612.0 '
f
- 18. ~
Not Electrical Energy Generated (MWH) 0.0 1.069.620.0 64.084.815.0 19.
Unh Service Factor 0.0 50.9 73.8
- 20. ~
Unit AvsilabilityFactor 0.0 50.9 73.8
- 21. '
' Unit Capacity Factor (Using MDC Net) 0.0 48.8-60.4 22c Unit Capacity Factor (Using DER Net) 0.0 47.6 59.3
.{
23 Unit Forced Outage Rate 0.0 0.0 4.7 r
24 Shutdown Scheduled Over Next 6 Months (Type, Date, and duration of Each):
Refuelina and Maintenance Outaae 13. Scheduled for March 1990: 8 Week duration
'6 ff Ghut Down At End of Report Period, Estimated Date of Startup:
May 6.1990
]
1 26.
Units in Test Status (Prior to CommercialOperation):
Forecast Achieved
'NITIAL CRITICALITY j
INITIAL ELECTRICITY
,g COMMERCIAL OPERATION J
- g
L. -; a,. 7,y DOCKET NO.
050-0298
-T UNIT-CNS
- DATE, May 4, 1990 TELEPHONE (402) 825-5291
' MONTH March 1990 DAY-AVERAGE DAILY POWER LEVEL DAY ~ AVERAGE DAILY POWER LEVEL (MWe-Met)
(MWe-Met) 1 0
17 0
2 0
18 0
3 5
19 0
4 0
20 0
'S 0
21 0
6 0~
22 0
7-0 23 0
-8 0
24 0
'9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
-15 0
31 0
.16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each
- day in the reporting month.
Compute to the nearest whole megawatt.
l
/
m_ _ -_- - _
-_.__m____m_.
.m_.__.
m.._
'f-
~ ~
75_.
_ya -..,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0298 7
.1 UNIT NAME Cooper Nuclear Station f "
DATE May 4.1990 -
'I COMPLETED BY ' ' J. E. Thompson _
- TELEPHONE (402) 925-5291 REPORT MONTH APRIL 1990
['
~
MeWxf of.
Ucensee Cause & Corrective Duration Shutung Event System' Component
- Action to -
No.
Date Type '
(Hours)
Reason' Down Reactor *.
Report #
Code Coue
.. Prevent Recurrence 90-01
~900303 S
719 C
2 N/A N/A N/A Reactor, shutdown for ~1990 (EOC13)
Refueling and Maintenance Outage.I l
i 1
F: Forced 2
Reason:
3 Method-4 Exhibit G - Instructions for -
S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparaton of Data Entry.
B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C-Refueling 3 - Automatic Scram Report (LER) File (NUREG416t}
D - Regulatory Restriction 4 - Continued
- E - Operator Training & License Examination
~ 5 - Reduced Load.
5 Exhibit 1 - Same Soutre F - Administrative _
6 - Other G - Operational Error (cAin)
H - Other (Explain) w p%,--
.m.
9 4
_e,-
g,
.+
,MA 4
.w*
g g
9-e,yq-
-y
+.%-'
9 6,g3.
v-ngAp,-
u.
yq.
,,m y
%....,49.q
.og
-4%g. pq.
- y;,.c.,, s..
l OPERATIONS NARRATIVE Cooper Nuclear Station April 1990 i
t The 1990 (EOC13) Refueling and Maintenance Outage continued throughout the month of April.
The capacity factor for April was 0%.