ML20042G930
| ML20042G930 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 05/04/1990 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| References | |
| NUDOCS 9005160301 | |
| Download: ML20042G930 (4) | |
Text
+
((
8
.,, 7 3 i
^
NAY 0 41990:
s L
' Docket.No.-50-271-Vermont Yankee Nucle'ar Power Corporation ATTN:
'Mr.-. Warren P. Murphy-Vice President and Manager.
of Operatio'ns JRD 5, Box.169-j Ferry Road Brattleboro', Vermont 05301 t
Gentlemen:
'i
Subject:
- .NRC-UTILITY INSPECTION' WORKSHOP-l Per'my commitment from the April 1989. Systematic Assessment of Licensee Performance Conference in King of Prussia, I am. proposing a workshop toLbe held?
at. the Hilton in King of-Prussia, Pennsylvania lon -June' 20-21, 1990.,The-g objective of the workshop is.to promote.a better understanding of the NRC's' j}
inspection' program.:
n For your. convenience,.a block of rooms has'been reserved at the Valley Forge Hilton,4at the' rate of:$75,00 dollars'.per night for a single room.
Re~s e rva- -
y tions should be made directly with the:Hilton (215-337-1200) forLyour stafr by:
-June'1, 1990. Af ter that date, reservations' will-be. accepted according to '
hotel availability. When making. reservations, mention that you will.be l
attending the NRC-Utility ' Inspection Workshop.
Enr.losed is the proposed agenda with. keynote. speakers.and an. outline.for a
breakout sessions facilitated similar:to previous conferences;. Session topics are currently being developed, as proposed in.the enclosediagenda 'along with t
L facilitators for the sessions. Bruce Preston of PSE&G (609-339-1229) is
-arranging.for utility presentations'. -Gene: Ke1N of my staff (215-337 _5234)'is-4 coordinating NRC presentations.
Recommendations for discussion-topics should be directed to Bruce or Gene as apprcpriate.
I anticipate that participation will: include site managementLand senior nuclear-l executives, at levels similar-to those in attendance at the.Apri111989c workshop. We estimate thatl75-90 utility representatives and'25-30 NRC representatives will attend.
s t
I look forward to your participation.
f t
Sincerely, ORIGINAL SIGNED BY:
-t 9005160301 900504
~
\\
JAMES T. WlGGINS R
ADOCK 05000271 William F..:Kane, Director
[-
PDC e
= Division of' Reactor Projects
Enclosure:
Workshop Agenda 1
L OFFICIAL-' RECORD COPY JUNE 20-21 WORKSHOP LETTERS H 0029.0:0 05/01/90;
.f
'h m
I L.
l Vermont' Yankee Nuclear Power. Corporation. 2 t
cc: w/ enc 1:
J. Weigand, President and Chief Executive Of ficer J. Pelletier, Plant Manager-J. DeVincentis, Vice President,' Yankee Atomic Electric Company L. Tremblay, Licensing Engineer, Yankee Atomic Electric Company 1
J. Gilroy, Director, Vermont Public Interest Research Group, Inc.
~!
'Public Document Room (PDR) local Public Document Room (LPDR)-
Nuclear Safety.Information Center (NSIC)
NRC Resident Inspector State of.New Hampshire, SLO Designee.
. State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee bec: w/ enc 1:
Region I. Docket' Room (with concurrences)
J.. Johnson,;-DRP Chief, RPS-3A, DRP M..Fairtile, NRR i
i l
q
)
q dRP RI:DRP' I:DRP
' K(ane Kelly /grm Wiggins S/1/90 5k py 0FFICIAL RECORD COPY JUNE 20-21 WORKSHOP LETTERS - 0030'.0.0 05/01/90~
i 1
y.; Jo.
q
~
' NRC-UTILITY SALP WORKSHOP' PROPOSED AGENDA' l
- PAINE / JEFFERSON ROOM **-
i
.(Ground. Floor).
WEDNESDAY - JUNE 20 PLENARY SESSIONS SPEAKER' Noon - 1:00 p.m..
-Registration'
. Gina Matakas, Secretary.-
Division of Reactor Projects-r 1:00.- 1:30 p.m;.
Kiynote-Thomas T.-Martin.
i
- Regional Administrator 1
1 4
1:30'- 2:00 p.m.
Inspection. Management.
William F.'Kane, Director Division of ReactorEProjects 2:00
'2:30 p.m.
Utility' Perspective To Be Determined i
2:30 - 3:00 p.m.
Team Inspections
- William'Johnston, Deputy: Director.
'l Division of Reactor: Safety 3
l 3:00 - 3:30 p.m.
Utility Perspective
- To-Be Determined
(
3:30 - 4:00 p.m.
Effective Communication Malcolm Knapp, Director 1
of Findings' Divisionlof Radiation' Safety and Safeguards r.
4:00 - 4:30 p.m.
Utility. Perspective To Be-Determined 4:40 - 5:00 p.m.
Programmatic Areas of Focus:
James Partlow Future Direction of the Associate Director Inspection Programe for Projects,,
-Office of Nuclear' Reactor i
{
Reguis+. ion
[J 5:15 - 5:30 p.m.
Breakout Session Assignments q
e l
.i -.
.\\
I
[
v
:.,1.... '..
. i
. - - - e-c i; '
THURSDAY. JUNE 21 BREAK 0"' SESSIONS - (5 GROUPS) 8:00 - Noon Breakout Sessions-There-will1be six separate breakout sessions, each with.
1 approximate 1y'20 people.
Each group wiii.be able to-address 'each of the suggested topics with appropriate time r
allotted for each.
You will be asked,- at registration-to I
-identify the top three topics of interest to you'~-
Topics Board Rooms-1.
Planning & Scheduling' Rm. 206-2.
Team Inspections.
Rm. 211' 3.
Communication of Findings Rm. 212
- j 4.
Open Item Commitment -
Rm. 215 Cost and Priorities 5.
Backfit Potential Rm. 216
[
6, Self-Assessment Credit Rm. 220 7.
'Open (Based on Feedback from Letter)
L l
Noon - 1:30 p.m.
Lunch - (Buffet - Optional - at Rain Forrest Room)~
AFTERNOON 1 30 - 2:30 p.m.
Reconvene Breakouts to Form Conclusions 2:30 - 4:00 p.m.
Full Session Summaries-
- HANC0CK ROOM **
by Facilitators (Second Floor).
4:00 - 4:30 p.m.
. Closing. Remarks William F. Kane, Director L
Division of Reactor Projects-l e
s l
P 7
w v
93