ML20042G930

From kanterella
Jump to navigation Jump to search
Proposes Workshop on 900620-21 in King of Prussia,Pa to Promote Better Understanding of NRC Insp Program.Proposed Agenda,W/Keynote Speakers & Outline for Breakout Sessions Encl
ML20042G930
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/04/1990
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9005160301
Download: ML20042G930 (4)


Text

+

((

8

.,, 7 3 i

^

NAY 0 41990:

s L

' Docket.No.-50-271-Vermont Yankee Nucle'ar Power Corporation ATTN:

'Mr.-. Warren P. Murphy-Vice President and Manager.

of Operatio'ns JRD 5, Box.169-j Ferry Road Brattleboro', Vermont 05301 t

Gentlemen:

'i

Subject:

.NRC-UTILITY INSPECTION' WORKSHOP-l Per'my commitment from the April 1989. Systematic Assessment of Licensee Performance Conference in King of Prussia, I am. proposing a workshop toLbe held?

at. the Hilton in King of-Prussia, Pennsylvania lon -June' 20-21, 1990.,The-g objective of the workshop is.to promote.a better understanding of the NRC's' j}

inspection' program.:

n For your. convenience,.a block of rooms has'been reserved at the Valley Forge Hilton,4at the' rate of:$75,00 dollars'.per night for a single room.

Re~s e rva- -

y tions should be made directly with the:Hilton (215-337-1200) forLyour stafr by:

-June'1, 1990. Af ter that date, reservations' will-be. accepted according to '

hotel availability. When making. reservations, mention that you will.be l

attending the NRC-Utility ' Inspection Workshop.

Enr.losed is the proposed agenda with. keynote. speakers.and an. outline.for a

breakout sessions facilitated similar:to previous conferences;. Session topics are currently being developed, as proposed in.the enclosediagenda 'along with t

L facilitators for the sessions. Bruce Preston of PSE&G (609-339-1229) is

-arranging.for utility presentations'. -Gene: Ke1N of my staff (215-337 _5234)'is-4 coordinating NRC presentations.

Recommendations for discussion-topics should be directed to Bruce or Gene as apprcpriate.

I anticipate that participation will: include site managementLand senior nuclear-l executives, at levels similar-to those in attendance at the.Apri111989c workshop. We estimate thatl75-90 utility representatives and'25-30 NRC representatives will attend.

s t

I look forward to your participation.

f t

Sincerely, ORIGINAL SIGNED BY:

-t 9005160301 900504

~

\\

JAMES T. WlGGINS R

ADOCK 05000271 William F..:Kane, Director

[-

PDC e

= Division of' Reactor Projects

Enclosure:

Workshop Agenda 1

L OFFICIAL-' RECORD COPY JUNE 20-21 WORKSHOP LETTERS H 0029.0:0 05/01/90;

.f

'h m

I L.

l Vermont' Yankee Nuclear Power. Corporation. 2 t

cc: w/ enc 1:

J. Weigand, President and Chief Executive Of ficer J. Pelletier, Plant Manager-J. DeVincentis, Vice President,' Yankee Atomic Electric Company L. Tremblay, Licensing Engineer, Yankee Atomic Electric Company 1

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

~!

'Public Document Room (PDR) local Public Document Room (LPDR)-

Nuclear Safety.Information Center (NSIC)

NRC Resident Inspector State of.New Hampshire, SLO Designee.

. State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee bec: w/ enc 1:

Region I. Docket' Room (with concurrences)

J.. Johnson,;-DRP Chief, RPS-3A, DRP M..Fairtile, NRR i

i l

q

)

q dRP RI:DRP' I:DRP

' K(ane Kelly /grm Wiggins S/1/90 5k py 0FFICIAL RECORD COPY JUNE 20-21 WORKSHOP LETTERS - 0030'.0.0 05/01/90~

i 1

y.; Jo.

q

~

' NRC-UTILITY SALP WORKSHOP' PROPOSED AGENDA' l

    • PAINE / JEFFERSON ROOM **-

i

.(Ground. Floor).

WEDNESDAY - JUNE 20 PLENARY SESSIONS SPEAKER' Noon - 1:00 p.m..

-Registration'

. Gina Matakas, Secretary.-

Division of Reactor Projects-r 1:00.- 1:30 p.m;.

Kiynote-Thomas T.-Martin.

i

- Regional Administrator 1

1 4

1:30'- 2:00 p.m.

Inspection. Management.

William F.'Kane, Director Division of ReactorEProjects 2:00

'2:30 p.m.

Utility' Perspective To Be Determined i

2:30 - 3:00 p.m.

Team Inspections

- William'Johnston, Deputy: Director.

'l Division of Reactor: Safety 3

l 3:00 - 3:30 p.m.

Utility Perspective

- To-Be Determined

(

3:30 - 4:00 p.m.

Effective Communication Malcolm Knapp, Director 1

of Findings' Divisionlof Radiation' Safety and Safeguards r.

4:00 - 4:30 p.m.

Utility. Perspective To Be-Determined 4:40 - 5:00 p.m.

Programmatic Areas of Focus:

James Partlow Future Direction of the Associate Director Inspection Programe for Projects,,

-Office of Nuclear' Reactor i

{

Reguis+. ion

[J 5:15 - 5:30 p.m.

Breakout Session Assignments q

e l

.i -.

.\\

I

[

v

:.,1.... '..

. i

. - - - e-c i; '

THURSDAY. JUNE 21 BREAK 0"' SESSIONS - (5 GROUPS) 8:00 - Noon Breakout Sessions-There-will1be six separate breakout sessions, each with.

1 approximate 1y'20 people.

Each group wiii.be able to-address 'each of the suggested topics with appropriate time r

allotted for each.

You will be asked,- at registration-to I

-identify the top three topics of interest to you'~-

Topics Board Rooms-1.

Planning & Scheduling' Rm. 206-2.

Team Inspections.

Rm. 211' 3.

Communication of Findings Rm. 212

j 4.

Open Item Commitment -

Rm. 215 Cost and Priorities 5.

Backfit Potential Rm. 216

[

6, Self-Assessment Credit Rm. 220 7.

'Open (Based on Feedback from Letter)

L l

Noon - 1:30 p.m.

Lunch - (Buffet - Optional - at Rain Forrest Room)~

AFTERNOON 1 30 - 2:30 p.m.

Reconvene Breakouts to Form Conclusions 2:30 - 4:00 p.m.

Full Session Summaries-

    • HANC0CK ROOM **

by Facilitators (Second Floor).

4:00 - 4:30 p.m.

. Closing. Remarks William F. Kane, Director L

Division of Reactor Projects-l e

s l

P 7

w v

93