ML20042G873
| ML20042G873 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 05/04/1990 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W ALABAMA POWER CO. |
| Shared Package | |
| ML20042G874 | List: |
| References | |
| NUDOCS 9005160211 | |
| Download: ML20042G873 (2) | |
Text
e X_
3 D
+
6 May4k1990L I
v
.g e
u
. ATTN:-Mr.W.:G.-Hairston,EIII(-
' Alabama Power Companys 1
' Senior:Vice President'
. < Nuclear Operations 1
P.,0.sBox 1295 l
l Birmingham, AL -35201 i
Gentlemen:!
SUBJECTi-;FARLEY REQUALIFICATION RETAKE EXAMINATIONLREPORTE-- 50-348/0L-90-01J
}
The. NRC 3 administered. examinations duringL the week"of January 29,41990,.to y l employees-of 'your company who currentlyc hold licenses to operatecthe~ Farley-Nuclear Plant._~ At the'conclusio'n of the' site visit, preliminary findings werei a
discussed with those-members (of your? staff identified in the Examination 9
Report, Enclosure'1.,
l
~
[j L A table summarizing-the examination results1 for.'each examined l individual is
'provided in: Enclosure l2..
Comments made by your training staff-concerning the-
. accuracy:e of 'some of the1 answers to < questions mini the : written 'examinatio'n : are?
d contained in Enclosure 3; Copies of.the written examinations landlanswerEkeys are included in this' report as-Enclosure 4.1 f
1 A Requalification/ Program Evaluatioli is.not' included.
Due to,the. nature:of'.
this examination,'therei was an; insufficient: sample size andJexamination1 scope-to make an ' appropriate _' determination._ However, we t have? included inn this report'_ any' identified operator weaknesses -or program areasneeding
. improvement. These concerns _have been discussed,with your training staff.-
A Simulation Facility - FidelityL Reportiis provided in ' this Ereport ; as.
1 In accordance with 10 CFR 2.790(a)_. of the Commission's regu1~ations, a ciopy;:of-this letter and Enclosures 1, 3, 4, and; 5 will be placed'in.;the. NRC's Public.
I Document Room.. is exempt from publicidisclosure pursuant -to j
10'CFR 2.790(a) and will not be sent to the public Document Room.-
a Should you.have any questions concerning.this examination,'please contact us.
I Sincerely, J
lt Thomas A. Peebles, Chief Operations Branch
~
Division of Reactor Safety.
e
Enclosures:
(Seepage 2) l J/-b 9005160211 900504 t
PDR ADOCK 05000348
-7r"lf 7 1
V PCC 1
,^
a
3 Alabama Power Company /
21 May 4,:1990 l
t.;
Enclosures:
1.
Examination' Report No.l50-348/0L190-01 1
l 2.
Requalification Results Summary Sheet.
'~
(Official.Use Only - Privacy Act Information)_
- 3. : Facility Comments on Written Exam Items 4.
R0/SR0 Examination and Answer Keys.
I
- 5. ' Simulation-Facility Fidelity Report cc w/encls 1, 2, and'5:'
D.-lN.-Morey, General Manager, Farley Nuclear Plant cc w/encls 1, 2, 3, 4, and 5:
.L. S. Williams, Training Manager cc w/ encl 1:-
State-of-Alabama L
bec w/encls:1=and 4:
^
E. Reeves,-NRR 1
d E. Merschoff, DRS F. Cantrell - DRP 4
G. Maxwell, Farley Senior
- Resident. Inspector i
R. McWhorter DRS bec w/encls I and'5:
d Operator Licensing Branch, DLPQ:NRR 1
tsc w/encls 1, 3, 4, and 5:
1 i,ocument Control Desk I
- [
!.i 1
l RII:DRS RII:DRS RII:0RP RII: RS i
"In 5 977 C fih j%CPayne:btm AJMunro NCantrell T
bles 5/t/90 5/z/90 5/ 7 /90 5/f/90 I
y 1
l