ML20042G873

From kanterella
Jump to navigation Jump to search
Forwards Requalification Retake Exam Rept 50-348/OL-90-01 for Units 1 & 2 Administered During Wk of 900129.Comments Made by Util Training Personnel Re Accuracy of Answers to Questions in Written Exam Also Encl
ML20042G873
Person / Time
Site: Farley  
Issue date: 05/04/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20042G874 List:
References
NUDOCS 9005160211
Download: ML20042G873 (2)


Text

e X_

3 D

+

6 May4k1990L I

v

.g e

u

. ATTN:-Mr.W.:G.-Hairston,EIII(-

' Alabama Power Companys 1

' Senior:Vice President'

. < Nuclear Operations 1

P.,0.sBox 1295 l

l Birmingham, AL -35201 i

Gentlemen:!

SUBJECTi-;FARLEY REQUALIFICATION RETAKE EXAMINATIONLREPORTE-- 50-348/0L-90-01J

}

The. NRC 3 administered. examinations duringL the week"of January 29,41990,.to y l employees-of 'your company who currentlyc hold licenses to operatecthe~ Farley-Nuclear Plant._~ At the'conclusio'n of the' site visit, preliminary findings werei a

discussed with those-members (of your? staff identified in the Examination 9

Report, Enclosure'1.,

l

~

[j L A table summarizing-the examination results1 for.'each examined l individual is

'provided in: Enclosure l2..

Comments made by your training staff-concerning the-

. accuracy:e of 'some of the1 answers to < questions mini the : written 'examinatio'n : are?

d contained in Enclosure 3; Copies of.the written examinations landlanswerEkeys are included in this' report as-Enclosure 4.1 f

1 A Requalification/ Program Evaluatioli is.not' included.

Due to,the. nature:of'.

this examination,'therei was an; insufficient: sample size andJexamination1 scope-to make an ' appropriate _' determination._ However, we t have? included inn this report'_ any' identified operator weaknesses -or program areasneeding

. improvement. These concerns _have been discussed,with your training staff.-

A Simulation Facility - FidelityL Reportiis provided in ' this Ereport ; as.

1 In accordance with 10 CFR 2.790(a)_. of the Commission's regu1~ations, a ciopy;:of-this letter and Enclosures 1, 3, 4, and; 5 will be placed'in.;the. NRC's Public.

I Document Room.. is exempt from publicidisclosure pursuant -to j

10'CFR 2.790(a) and will not be sent to the public Document Room.-

a Should you.have any questions concerning.this examination,'please contact us.

I Sincerely, J

lt Thomas A. Peebles, Chief Operations Branch

~

Division of Reactor Safety.

e

Enclosures:

(Seepage 2) l J/-b 9005160211 900504 t

PDR ADOCK 05000348

-7r"lf 7 1

V PCC 1

,^

a

3 Alabama Power Company /

21 May 4,:1990 l

t.;

Enclosures:

1.

Examination' Report No.l50-348/0L190-01 1

l 2.

Requalification Results Summary Sheet.

'~

(Official.Use Only - Privacy Act Information)_

3. : Facility Comments on Written Exam Items 4.

R0/SR0 Examination and Answer Keys.

I

5. ' Simulation-Facility Fidelity Report cc w/encls 1, 2, and'5:'

D.-lN.-Morey, General Manager, Farley Nuclear Plant cc w/encls 1, 2, 3, 4, and 5:

.L. S. Williams, Training Manager cc w/ encl 1:-

State-of-Alabama L

bec w/encls:1=and 4:

^

E. Reeves,-NRR 1

d E. Merschoff, DRS F. Cantrell - DRP 4

G. Maxwell, Farley Senior

Resident. Inspector i

R. McWhorter DRS bec w/encls I and'5:

d Operator Licensing Branch, DLPQ:NRR 1

tsc w/encls 1, 3, 4, and 5:

1 i,ocument Control Desk I

[

!.i 1

l RII:DRS RII:DRS RII:0RP RII: RS i

"In 5 977 C fih j%CPayne:btm AJMunro NCantrell T

bles 5/t/90 5/z/90 5/ 7 /90 5/f/90 I

y 1

l