ML20042G677
| ML20042G677 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/10/1990 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20042G678 | List: |
| References | |
| NUDOCS 9005150278 | |
| Download: ML20042G677 (7) | |
Text
. - -
i.,
',' +Q ok UNITED STATES NUCLEAR REGULATORY COMMISSION -
>m g
3 J' E
WASHINGTON, D,. C. 20$55
%g.'.
,p
{
CUKE POWER COMPANY DOCKET NO. 50-369 i
McGUIRE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE t
Amendment No. 108 -
License No. NPF-9 1.
The Nuclear Regulatory Comission (the Commission) has found that:
i The app (lication for amendment to the McGuire Nuclear Station, Unit 1 th A.
1 by the Dule Power Company (the licensee) dated January 19, 1990,-
conplies with the standards.and requirements.of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations r
as set forth in 10 CFR Chapter I;
' D.
The facility will operate 'in conformity with the application, the provisions of the Act, and the rules and regulations of.the Comission;-
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) tiet such activities will be conducted in conpliance with the. Commission's regulations set. forth in ~10 CFR ~
Chapter I; i
D.
The issuance of this anendnent will.not be inimical to the comon.
defense and security or to the health and safety of the public; and-l E.
The issuance of this emenament is in accordance with 10 CFR Part 51 L
of the Comission's regulations and all applicable requirements have i
been satisfied.
l.
l l-I
~
l 0
9005150278 900510 PDR ADOCK 05000369 p
I E
j
- 2,-
i 2..
Accordingly, the. license is hereby' amended by page changes-to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-9 is hereby.
R
- amended to read as follows:-
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.-108, are hereby incorporated into the license.
The licensee shall operate the facility in accordance with the-i Technical. Specifications and the Environmental Protection Plan.,
3.
This license amendment is effective aslof its date of issuance.
1 FOR THE NUCLEAR REGULATORY COMMISSION-
/
. Y, di
<.</1; David B. Matthews, Director:
Project Directorate 11-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes l-Date of Issuance:
MaylS,1990 l-l:
l i
g
(
l
,i 1
. f sa Cion
.')
\\
o,,
UNITED sT ATEs -
t E-NUCLEAR REGULATORY COMMISSION ~
n
{.
..I.'
WASHINGTON, D. CI 20$$5 9
DUKE POWER COMPANY
- i DOCKET NO. 50-370 McGUIRE NUCLEAR STATION, UNIT 2 f
AMENDMENT TO F/4ILITY OPERATING LICENSE t
r-
- Amendment No. 90 j
Li cen se-No. 'ilPF-17.
1.
The Nuclear ' Regulatory Connission (the Commission) has found that:
J The app (lication for amendment to the McGuire Nuclear Station,.the fac A.
Unit 2 by -the Dule Power Cogany (the licensee) dated January 19' 1990,.
coglies with the standards-and requirements of the Atomic Energy Act' of 1954, as anended (the Act) and the Comission's rules and regulations as set forth in 10 CFR: Chapter I; B.
The facility will operate in conformity.with the application, the provisions of the Act, and the.rvles and regulations'of the Consnission; C.
There is reasonable assurance (1) that the activities authorized by this amendnent. can' be-conducted without endangering the health and 1
safety of the public, and (ii) that such activities will be condJcted in compliance with the Commission's regulations.' set forth:in 10 CFR Chapter.I; D.
he issuance of this amendnent will not be inimical to the comon
&+cnse and security or to the health and safety of the public; and t
E.
The issuance of this amendnent is in 'acccrdance.with 10 CFR Part 51 of the Connission's regu lations and' all applicable requirerents' have.been l
sa ti sfied.
i Y
f
. i
):
r
--,f 1
--n.
e a
re r,,
e.e r v
Et.
i 2
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to-this license amendment, and Paragraph.2.C.(2) of Facility Operating License No. NPF-17 is hereby' amended to read as follows:.
=!
Technical Specifications t
I The Technical Specifications contained in Appendix A,Las-revised through Amendment No. 90:, are hereby incorporated into the license.-
~
The licensee shall operate the facility.in accordance with the Technical Specifications and-the Environmental Protection Plan.
3.
This license amendment is effective as of its date of' issuance.
FOR THE NUCLEAR REGULATORY COMMISSION.
(/
dcW David B. Matthews, Director Project Directorate:II-3 Division of Reactor Projects-I/II-i Office of Nuclear Reactor' Regulation' f
I
Attachment:
1 Technical Specification Changes-l Date of Issuance:
May 8, 1990 l
I L
L i
i
_ 7,.,
4.
ATTACHMENT TO LICENSE AMENDMENT NO. 108 i
FACILITY OPERATING LICENSE NO. NPF g DOCKET NO. 50-369-
.i AND
.TO~ LICENSE AMENDMENT NO. 90 FACILITY OPERATING LICENSE NO. NPF DOCKET NO. 50-370 Replace the following pages of the Appendix "A" Technical Specifications'with
-the enclosed pages.
The revised pages are. identified by Amendment' number and t
contain vertical lines indicating the areas of change.'
Remove Pages Insert races 3/4 7-13 3/4 7-13 i-3/4 7-14 3/4 7-14 r
I p
\\
l-
. a:
w, PLANT SYSTEMS
[
3/4.7.6 CONTROL AREA VENTILATION SYSTEM e
LIMITING CONDITION FOR OPERATION 3.7.6 Two independent. Control Area Ventilation' Systems shall be OPERABLE.
APPLICABILITY:
ALL MODES ACTION:
(Units 1 and 2)
~ MODES 1, 2,-'3 and 4:
With one Control Area Ventilation System inoperable, restore the inoperable system to OPERABLE status 'within 7 days or be in at least HOT STANDBY within l
~
the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the'following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
1 MODES 5 and 6:
a.
With one-Control Area Ventilation System inoperable, restore the inoperable system to OPERABLE status within 7 days or initiate and-l
. maintain operation of-the remaining OPERABLE Control Area Ventilation System in the recirculation mode; and b.
With both Control Area Ventilation Systems inoperable, or with the OPERABLE Control Area Ventilation System, required to be.in the.
recirculation mode by. ACTION a., not capable of being powered by an OPERABLE emergency power source, suspend all operations involving CORE ALTERATIONS or positive reactivity changes, c.
The provisions of Specification 3.0.4 are not applicable.
l -
SURVEILLANCE REQUIREMENTS l
4.7.6 Each Control Area Ventilation System shall be-demonstrated OPERABLE:
a.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, by verifying that-the control room air temperature is less than-or equal to 90 F; l
b.
At least once per 31 days on a STAGGERED TEST. BASIS, by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying that the system operates-for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the heaters operating; f
Amendment No.108 Unit 1)
Amendment No. 90 ((Unit 2)
McGUIRE - UNITS 1 and 2 3/4 7-13
s
?
4, v
5..
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c.
At least once per 18 months, or (1) af ter any structural maintenance on the HEPA filter or charcoal adsorber housings,;or (2) following painting, fire or chemical release in any ventilation zone
..1
-communicating with the system, by:-
-1)
Verifying that the. system satisfies the in place penetration
~
and_ bypass leakage testing acceptance criteria of,less.than 1%
a and uses_ the. test procedure guidance of Regulatory Positions C.S.a, C.5.c, and C.S.d of Regulatory Guide 1.52, Revision 2, March 1978, and.the system flow rate.-is 2000 cfm i 10%;-
2)
Verifying, within 31 days af ter removal, that a laboratory-l analysis _of a "presentative. carbon sample obtained in
.accordance wm regulatory Position C.6.b of Regulatory Guide 1.52, Revision i,. March 1978, meets the laboratory testing-criteria'of Regulatory Position C.6.a of Regulatory Guide 1.52,
. Revision 2, March 1978, for.a methy1_ iodide penetration of less than 0.175%; and
- l-3)
Verifying a system flow rate of 2000 cfm i 10% during system-operation when tested in accordance with ANSI N510-1975, d.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation, by verifying within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained.in accordance with Regulatory Position-C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, meets the laboratory testing' criteria of Regulatory Position C.6.a of Regulatory Guide 1.52, Revision 2, March 1978, for a methyl iodide penetration of less than 0.175%;
j e.
At least once per 18 months, by: _
r 1)
Verifying that the pressure drop across-the combined pre-i t
I-filters, HEPA filters and charcoal adsorber banks is less -
than 5 inches Water Gauge while operating the system at a flow rate of 2000 cfm i 10%;
2)
Verifying that upon actuation of a diesel-generator sequencer-the system automatically. switches into a mode of operation with flow through the HEPA filters and charcoal.adsorber_ banks; 3
3)
Verifying that the system maintains the control room at a positive pressure of greater than or equal to 1/8 inch W.G.
relative to the outside atmosphere;during system operation; and i
4)
Verifying that the heaters dissipate 1011.0 kW when tested in i
accordance with ANSI N510-1975.
l I
L McGUIRE - UNITS 1 and 2 3/4 7-14 Amendment No.108 (Unit 1).
Amendment No. 90 (Unit 2)-