ML20042G574

From kanterella
Jump to navigation Jump to search
Forwards Summary of Meeting Conducted on 900412 at Facility. Meeting Beneficial in Understanding Corrective Actions to Establish & Maintain Emergency Svc Water Sys Operability as Well as long-term Plans to Improve Sys Performance
ML20042G574
Person / Time
Site: Peach Bottom 
Issue date: 05/07/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20042G575 List:
References
NUDOCS 9005150098
Download: ML20042G574 (2)


Text

,l:.

/

y

?

i 07 MAY 1980 Docket No. 50-277-Philadelphia Electric Compt.ny ATTN: Mr. D. M. Smith Senior.Vice President-Nuclear Correspondence Control Desk P. O. Box 7520 Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Peach Bottom Meeting Summary - April 12, 1990 This letter refers to the meeting held at your request on April 12, 1990 in the Region.! office at King of Prussia, Pennsylvania to discuss the Peach Bottom Unit 2 emergency service water (ESW) system operability. Topics of discussion

~

during this meeting are described in the enclosed meeting summary.

We believe the meeting was beneficial in understanding your corrective actions c

to establish and maintain Unit 2 ESW system operability as well as your long_

term plans to improve system perforn,ance.

No reply to this letter is required. Your cooperation with us in this matter is appreciated.

Sincerely, Off.?hd Wm.sd by A. Randy Moegh A. Randolph Blough, Chief Projects Branch No. 2 Division of Reactor Projects

Enclosure:

NRC Region I Meeting Summary OFFICIAL RECORD COPY PB MEETING

SUMMARY

-4/12/90 - 0001.0.0

~.

05/03/90 900515co9e 9005o7

/

h g

ADOCK05cogf7 g

DR m

o-

'[,

Philadelphia Electric Company 2

1 07 MAY 1990 cc w/ enc 1:

D. R. Helwig, Vice President, Nuclear Engineering and Services E. C. Kistner, Chairman, Nuclear Review Board D. Miller, Vice President, Peach Bottom Atomic Power Station J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station T. B. Conner, Jr., Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric B. W. Gorman, Manager, External Affairs E. J. Cullen, Esquire, Assistant General Counsel (Without Report)

R. L. Hovis, Esquire T. Magette, Power Plant Siting, Nuclear Evaluations G. Hunger, Director, Licensing Section D. Poulsen, Secretary of Harford County Council R. J. Lees Chairman, Nuclear Review Board J. H. Walter, Chief Engineer, Public Service Commission of Maryland Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Ascistant, DRMA (w/o enc 1)

R. Bellamy, DRSS DRP Section Chief M. Conner, SALP Reports Only PA0 (2) SALP Reports and All Inspection Reports G. Suh, NRR J. Caldwell, EDO i

RI:DRP R::: RP I:DRP-J akoski/rh1 LDoerflein RBlough 5/ 4 /90 5/~1/90 5/>/90 0FFICIAL RECORD COPY PB MEETING

SUMMARY

-4/12/90 - 0002.0.0 05/03/90 i