Forwards List of Incomplete USIs for Plant,Per Util 891121 Response to Generic Ltr 89-21 & Encourages Efforts for Completion
ML20042G507
Person / Time
Site: Point Beach  
Issue date: 05/09/1990
From: Swenson W
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
References
REF-GTECI-A-11, REF-GTECI-A-44, REF-GTECI-A-46, REF-GTECI-A-47, REF-GTECI-EL, REF-GTECI-RV, REF-GTECI-SC, REF-GTECI-SY, TASK-A-11, TASK-A-44, TASK-A-46, TASK-A-47, TASK-OR GL-89-21, NUDOCS 9005150011
Download: ML20042G507 (5)


Text

ns T,

,y May 9,'1990 i_ j 3

t

~

Docket Nos. 50-266-DISTRIBUTION I

c "and 50-301 g~ ~DocketfilesF NRC & Local PDRs PDlII-3 r/f JZwolinski t

JHannon TColburn

+

PKreutzer 0GC-WF1.

i Mr.

C'.

W.' Fay, Vice President EJordan ACRS(10)

Nuclear Power Department' PDIII-3 Gray RWessman Wisconsin Electric Power Company KEccleston-

?

.231-West Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

'UNIMPLEMENTED UNRESOLVED SAFETY ISSUES AT THE POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 0n' October 19, 1989, thestaffissuedGenericLetter-(GL)89-21whichrequested information concerning the status of implementation of unresolved safety issues (USIs) 'at your. facility. Based on your response to this GL, dated November 21, 1989, our review of Agency records and discussions-between.your staff and the NRC Project Manager, the NRC staff has compiled the enclosed list repre-7.f senting our assessment of USI implementation. These results were presented i

to the Commission at a meeting on February 14, 1990.

' Enclosure 1 to this letter presents the staff understanding of the status of all unimplemented USIs for the Point Beach Nuclear Plant, as reported to the Commission. The staff encourages your effort to complete the unimple-

.mented USIs.-

.If you have questions or comments about the enclosed information, please contact me at (301) 492-1386.

Sincerely,

}

/s/

l l

Warren H. Swenson, Project Manager R

Project Directorate III-3 p

Division of Reactor Projects - III, L

IV, V and Special Projects Office of Nuclear Reactor Regulation l

Enclosure:

As stated cc w/ enclosure:-

See next page DOCUMENT NAME:

USI PT. BEACH Office:

L

-3 P

f fM-3 PD/ Dill-3 Surname:

r enson/bj JHannon Date:

S/fr/90

,f/g/90

[/6/90 9005150011 900509 PDR ADOCN 05000266 l

K' P

PDC 1

-l

}

May 9,.1990 4

Docket Nos. 50-266' DISTRIBUTION l

4-and 50-301' Docket Files NRC & Local PDRs PDIII-3 r/f JZwolinski

'l JHannon TColburn l

PKreutzer OGC-WFI l

Mr. C. W. Fay, Vice President EJordan ACRS(10)

. Nuclear Power Department-PDIII-3 Gray RWessman L

Wisconsin Electric Power Company KEccleston v

231 West Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear.Mr. Fay:

SUBJECT:

UNIMPLEMENTED UNRESOLVED SAFETY ISSUES AT THE POINT BEACH NUCLEAR PLANT, UNIT N05._1 Aiiu 2 On October 19, 1989, thestaffissuedGenericLetter(GL)89-21whichrequested-l:

~information concerning_the status,of implementation of unresolved safety issues l

(USIs) at your facility. _ Based on your response to this GL, dated November 21, L

1989, our review of Agency-records and discussions between_your staff'and l

.the NRC Project Manager,-the NRC staff has compiled the enclosed list repre-l senting our assessment of USI implementation.

These results were presented l

.to.the Commission at a meeting _ on February 14, 1990.

l-l to this letter presents the staff understanding of the status of l-

_all unimplemented USIs-for the Point Beach Nuclear Plant, as reported to the Commission. The staff encourages your effort to complete the unimple-mented USIs.

If you have questions or comments about the enclosed information, please contact me at (301) 492-1386.

Sincerely, l

/s/

Warren H. Swenson, Project Manager Project Directorate III-3 L,

Division of Reactor Projects - III, IV, V and Special. Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DOCUMENT NAME: USI PT. BEACH PD/hDIII-3 Office:

L

-3 P

-3 Surname:

r wdwenson/bj JHannon Date:

$/p/90

,f/g/90

[/6/90

Q 0tEQy"'o, NUCLE AR REGULATORY COMMISSION UNITED STATES

[

- ~,

g W ASHINGT ON, D. C. 20655 g

.j May 9, 1990 k..... p#

Docket Nos. 50-266 and 50-301 Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

UNIMPLEMENTED UNRESOLVED SAFETY ISSUES AT THE POINT

SUBJECT:

PLANT, UNIT NOS. 1 AND 2 the staff issued Generic Letter (GL) 89-21 which requested On October 19, 1989, information concerning the status of implementation of unresolved safety issues Based on your response to this GL, dated November 21, (USIs) at your f acility.1989, our review of Agency records and discussions betw the NRC Project Manager, the NRC staff has compiled the enclosed list repre-These results were presented senting our assessment of USI implementation.

to the Commission at a meeting on February 14, 1990. to this letter presents the staff understanding of the status of ell unimplemented USIs for the Point Beach Nuclear Plant, as repo the Commission.

mented USIs.

If you have questions or comments about the enclosed information, please contact me at (301) 492-1386.

S ncerely, I

1 War H. Swenson, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

I f.

e

4 I

ENCLOSURE 1 List of Incomplete USIs for Point Beach Nuclear Plant, Unit Nos. I and 2 (As Reported to the Commission on February 14 1990)

^

Estimated USI TITLE Imp. Date Remarks A-11 Reactor Yessel Materials 12/30/90 Pending B&W Toughness Owners' Group m

Generic submittal A-44 Station Blackout 03/31/92 SER Scheduled for 3/31/90 A-46 Seismic Qualification of Requirenents ut. der Equipment in Operating Plants development A-47 Safety Implication of 03/20/90 New Requirement.

Control Systems in LWR Response due by huclear Power Plants 03/20/90 l

l L

1 L.

I i

t'

{

s

+(

p l

?

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2

+

cc Ernest L. Blake J r.

Shaw,Pittman,fottsandTrowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear. Plant i

Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 F

Two Rivers, Wisconsin 54241

{

Chairman Public Service Commission of Wisconsin I

Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director 3

for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60 " 7

)

i' Resident Inspector's Office U.S. Nuclear Regulatory Commission p

6612 Nuclear Road L

Two Rivers, Wisconsin 54241 l

l l

1 1

t-e i

I t

-