R.
.
.
'-
14AY - 71990
i
In Reply Refer To:
[
Docket: 50-285/90-04
i
,
Omaha Public Power District
ATTN:
W. G. Gates, Division Manager
3
Nuclear Operations
444 South 16th Street Mall
Mail Stop BE/EP4
Omaha, Nebraska 68102-2247
Gentlemen:
This refers to the system entry and retest (SERT) inspection conducted by
'
Messrs. M. E. Murphy, D. L. Kelley and H. F. Bundy of this office during the
period March 26-30, 1990, of activities authorized by NRC Operating
.
License DPR-40 for Fort Calhoun Station, and to the discussion of our findings
'
with you and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included system entry retests for modifica-
tions, temporary modifications, and maintenance activities. Within these
,
areas, the inspection consisted of selective examination of procedures and
'
representative records, interviews with personnel, and observations by the
inspectors. The inspection findinas are documented in the enclosed inspection
'
report.
Within the scope of the inspection, no violations or deviations were identified.
1
Should you have_any questions concerning this inspedtion, we will be pleased to_
discuss them with you.
1
Sincerely.
-
original signedsy:
Samuel J. Colins
.
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
l
50-285/90-04
i
cc w/ enclosure:
LeBoeuf, Lamb, Leiby & MacRae
.
'ATTH:
Harry H. ' Voigt Esq.
i
1333 New Hampshire Avenue, NW
/
i
'
Washington, D.C.
20036
f
RI:TPS
RI:TPSb
C:TPS
D
RIV:h
-HEMurphy:1m
D,LKelle
HFBundy
WCSeidlie
LJCallan S
ns
/f /p /90
/p/90
V/$o/90
V /& 4/90
</ /3o/90 $/4/90
k\\
9005110113 900507
ADOCK 05000285
f $f
3
p.
L, f
,:
,
,
. ,
.,
.
,
'
. n.
,
,
Omaha Public Power District
-2-
!
,
r
Washington County Board
I
of Supervisors
ATTN: Jack Jensen, Chairman
Blair, Nebraska 68008
Combustion Engineering, Inc.
ATTN: Charles D. Brinkman, Manager
i
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
<
Department of Health
ATTH: Harold Borchert, Director
l
Division of Radiological Health
!
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509
i
,
Fort Calhoun Station
ATTN:
G. R. Peterson, Manager
,
t
P.O. Box 399
Fort Calhoun, Nebraska 68023
i
U.S. Nuclear Regulatory Commission
!
!
ATTH: Resident inspector
P.O. Box 309
.
Fort.Calhoun, Nebraska 68023
U.S. Nuclear Regulatory Commission
.
ATTN: Regional Administrator, Region IV
611 Ryan Plaza Drive, Suite 1000
Arlington, Texas 76011
,
'
bectoDMB(IE01)
t
i
bec distrib. by RIV:
l
l
- R. D. Martin
- Resident Inspector
F
- DRSS-FRPS
- SectionChief(DRP/C)
- MIS System
- RIV File
-*DRP
- RSTS Operator
- ProjectEngineer(DRP/C)
Lisa Shea, RM/ALF
i
- DRS .
~
- M. E. Murphy
,
- D. L. Kelley-
- A. Bournia, NRR Project Manager (MS:*H.F. Bund)u
13-D-18
i
- W. Seidle
,
,
,