ML20042G060
| ML20042G060 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 04/30/1990 |
| From: | Ronald Bellamy NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20042G061 | List: |
| References | |
| NUDOCS 9005110050 | |
| Download: ML20042G060 (2) | |
See also: IR 05000277/1990009
Text
-.
,3
i.
}G
-
.
'
.
APR 3 01993
i
L
Docket Nos.
50-277
50-278
-.
L
Philadelphia Electric Company
L
ATTN: Mr. D. M. Smith
L
Executive Vice President-Nuclear
'
Correspondence Control Desk
P. O. Box 7520
,
'
Philadelphia, Pennsylvania 19101
-
t
Gentlemen:
Subject: Combined Inspection Report Nos. 50-277/90-09 and 50 278/90-09
.
This refers to the routine safety inspection conducted by Mr. J. J. Kottan of
this office on April 2-6, 1990 of activities authorized by NRC License Nos.
PPR-44 and DPR-56 at the Peach Bottom Atomic Power Station, Units 2 and 4 and
to the discussions of our findings held by Mr. J. Kottan with Mr. D. LeQuia and
others of your staff at the conclusion of the inspection.
.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
!
inspection consisted of selective examinations of procedures nnd representative
records, interviews with personnel. and observations by the inspector.
In addition, our Mobile Laboratory was also brought to your site and used by
the inspector to make certain independent measurements.
The basic purpose of
these independent measurements is to verify your capability for aralyzing
radioactive effluents, &nd to achieve and maintain comparable methods of
analyses between your facility and the NRC. The complete data from these
measurements will be reported in a subsequent inspect 4n report.
]
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely.
Onsinal Sicned By:
Ronald R. Bellamy
Ronald R. Bellamy, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
l
'
0FFICIAL RECORD COPY
CIR PB 90-09/09 - 0001.0.0
1
t
p
s
'
- .
04/25/90
] 1s
li '
'
m
9005110000 900430
b
,
ADOCK 05000277
g =:= . - W%
"'
>
W
Q
'
,i
o
.
.
.
.
0E
Philadelphia Electric Company
2
'
i
,
Enclosure:
Combined NRC Region I Inspection Report Nos. 50-277/90-09 and 50-278/90-09
cc w/ enc 1:
D. R. Helwig, Vice President of Nuclear Engineering and Services
-
E. C. Kistner, Chairman, Huclear Review Board
.
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
T. E. Cribbe, Regulatory Engineer, Peach Bottom Atomic Power Station
J. P. Wilson, Acting Project Manager, Peach Bottom Atomic Power Station
D. B. Miller, Vice President for Peach Bottom
T. B. Conner, Jr. , Esquire
'
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
B. W. Gorman, Manager, External Af fairs
E. J. Cullen, Esquire, Assistant General Counsel (Without Report)
R. L. Hovis, Esquire
T. Hagette, Power Plant Siting, Nuclear Evaluations
G. Hunger, Director, Licensing Section
D. Poulsen, Secretary of Harford County Council
'
R. J. Lees, Chairman, Nuclear Review Board
J. d. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Room (PDR)
.
Local Public Document Room (LPDR)
'
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
'
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant,_DRMA (w/o enc 1)
R. Bellamy, DRSS
DRP Section Chief
M. Conner, SALP Reports Only-
K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports
J. Caldwell, NRR
G. Suh, NRR
t
RI:0RSS
RI:DRSS
R :DRSS
RI:DRSS
Mhgi
g
Be'4
amara
Kottan
res
lamy
04/27/90
044//90
04/J&/90
044o/90
0FFICIAL RECORD COPY
CIR PB 90-09/09 - 0001.1.0
04/25/90