Requests That Encl Surveys Re Status of Plants Currently Shut Down Be Completed & Forwarded by 900511
ML20042F160
Person / Time
Issue date: 04/27/1990
From: Murley T
Office of Nuclear Reactor Regulation
To: Davis A, Ebneter S, Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9005070302
Download: ML20042F160 (4)


Text

..

-~

APR I 7102 l

l MEMORANDUM FOR: Thomas T. Martin, Regional Administrator, Region I l

Stewart D. Ebneter, Regional Administrator, Region II l

A. Bert Davis, Regional Administrator, Region 111 l

Robert D. Martin, Regional Administrator, Region IV John B. Martin, Regional Administrator, Region Y i

FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

STATUS OF PLANTS CURRENTLY SHUT DOWN l

l As part of the short-term follow.up to the recent loss of AC Mwer event l

at Vogtle, the NRR staff is gathering information to assess the vulnerability of plants which are currently shutdown for maintenance and/or refueling.

In this regard, I request that you have resident personnel complete the enclosed survey for plants which are currently shutdown for refueling or significant maintenance activities. The survey is intended to be a " snapshot" of current status.

It is straightforward and should take less than an hour to compiete.

l I

Survey responses should be completed by May 11, 1990 and forwarded to the NRR Assistant Director responsible for projects in your region.

Original 81cso by m anE. Wrley l

Thomas E. Murley, Director Office of Nuclear Reactor Regulation i

Enclosure:

As statert i

8

)

y N

y cc w/ enclosure:

(

1 of W. Russell

)

\\

j

$d D. Crutchfield lg F. Gillespie q h() /

o NRR Division Directors

/

l.8@

NRR Assistant Directors for Projects

~k M [,

^

'go NRC Regional Division Directors

/

ge g

for Reactor Projects g,

f11 SS DISTRIBUTION: !Cests1?F11e' SRXB R/F RJones MCaruso

'MCaruso R/F" JPartlow AThadani BBoger y'h

  • See previous page for concurrence

.)

D i

n DFC :5RXB:D5T

5RXB:D5T
D: DST
AD/RI:

M :ADP:NRR J NRR

DR I

P... :.........%

........./

NAME :MCaruso:jh* :RJones*

AThadani*
BBoge
JPartlow*

iraglia

TLMurley

.....:............:............:............:...,........:........g.:............:..y.

DATE :4/17/90

4/17/90
4/18/90
4/g5/90
4/20/90 k1
4g/,/90
4M4/90 l

0FFICIAL RECORD COPY MEMO REGIONAL ADMINISTRATORS EC FEf Document Name:

ENCLOSURE PLANT NAME:

INSPECTOR:

DATE:

1.

REACTOR STATUS AS OF $URVEY DATE

1. Date Reactor was Shutdown 2.ReactorVesselHead(tensioned,detensioned,off)?

Vents Open?

3. Reactor Fueled or Defueled?
4. RCS Temperature:

S. RCS Pressure:

6. Reactor Yessel Water Level:

(e.gRefuelingLevel, Drained,Mid-loop,etc.)

7. Estimated Restart Date:

!!. PLANT EQUIPMENT STATUS AS OF SURVEY DATE NUMBER NUMBER ITEM INOPERABQ OPERABLE Residual / Decay Heat Removal Pumps ECCS Injection Pumps OffsiteACPowerSources(3)

On-siteEmergencyACPower(3)

Sources (EDG, Gas Turb. etc)

SafetyGradeDCPowerSources(3)

Non-safetyDCPowerSources(3)

MainFeedwaterPumps(1)

CondensatePumps(1)

AuxiliaryFeedwaterPumps(1,2)

Normal Service Water Pumps Emergency Service Water Pumps NOTES FOR ITEM !!:

Motor-driven Only PWR Only If inoperable, briefly describe circumstances under item V. below l

i CONTAINMENT STATUS AS OF SURVEY DATE If containment integrity is not being maintained, briefly describe any activities currently ongoing inside containment and actions which would be necessary to establish containment integrity.

4 l

J 1

!Y.

MAINTENANCE ACTIVITIES AS OF SURVEY DATE j

Briefly describe any significant ongoing maintenance or replacement activities other than those addressed in item III.

I' l

i l

i 1

i

V.

ELECTRICAL SUPPLIES Briefly describe the circumstances surrounding any inoperable power sourcesnotedaboveinItem!!,(e.gEDGdisassembled),andany electrical system line-ups that are off-normal (e.g., backfeeding ACpowerviamaingenerator),

i i

j i

l

]

i 4

7 I

t P

4 n,

a

.,v,.

v.