Forwards Insp Rept 50-298/90-14 on 900409-13.No Violations or Deviations Noted
ML20042E854
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/27/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20042E855 List:
References
NUDOCS 9005030243
Download: ML20042E854 (3)


See also: IR 05000298/1990014

Text

.

.

APR 2 7 m

"

in Reply Refer To:

Docket: 50-298/90-14

Nebraska Public Power District

lTN : George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbus, Nebraska- 68002-0499

Gentlemen:

This refers to the inspectio's conducted by Mr. P. C. Wagner of this office

during the period April ?.13,1990, of activities authorized by NRC Operating

License DPR-46 for the Coopr 'luclear Station, and to the discussion of our

findings with Mr. Guy Horn and other members of your staff at the conclusion of

the inspection.

The area examined during this inspection included the review of design changes

and modifications implemented during the last two refueling cycles. Within

this area, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. The inspection findings are documented in the enclosed inspection

report.

t

The inspector also examined the actions you have taken in response to

previously identified inspection findings. The status of these items is

discussed in paragraphs 2 and 3 of the enclosed report.

i

Within the scope of the inspection, no violations or deviations were

identified.

j

Should you have any questions concerning this inspection, we will be pleased to

,

discuss them with you.

Sincerely,

Dioinal stoned sy:

Samuel J. CoHina

,

!

Samuel J. Collins, Director

Division of Reactor Projects

l

,

Enclosure:

Appendix - NRC Inspection Report

50-298/90-14

!

  • C:PSSh
  • D:DRS

D:F :

  • RIV:RI:PSS

PWagner:1m

TStetka

LJCallan

SJ R

ins

/ /90

4 /$/90

/ /90

A/!

/90

,

  • Previously concurred

%

.

1

)

gk{

PDR

ADOCK 05000200

O

l

FDC

.

_.

. _ . . . _ . . _ _ _ _ _ _ . .

-

a

.

"

APR 2 7 m

In Reply Refer To:

Docket: 50-298/90-14

Nebratita Public Power District

ATTN: ' George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbas, Nebraska 68602-0499

Gentlemei:

This refers to the inspection conducted by Mr. P. C. Wagner of this office

during the period April 9-13, 1990, of activities authorized by NRC Operating

License DPR-46 for the Cooper fluclear Station, and to the discussion of our

findings with Mr. Guy Horn and other members of your staff at the conclusion of

the inspection.

The area examined during this inspection included the review of design changes

and modifications implemented during the last two refueling cycles. Within

this area, the inspection consisted of selective examination of procedures and-

representative records, interviews with personnel, and observations by the

inspector, The inspection findings are documented in the enclosed inspection

report.

The inspector also examined the actions you have taken in response to

previously identified inspection findings. The status of these items is

discussed in paragraphs 2 and 3 of the enclosed report.

Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

Original Signed By:

Samuel J. Collirm

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-298/90-14

  • C:PSSh
  • RIV:Al:PSS
  • D:DRS

D:t

PWagner:1m

TStetka

LJCallan

50 3

ins

/ /90

t/23/90

/ /90

4/,

/90

Previously concurred

.

gDR

ADOCK OGOOc,Tps

e De

,\\

4

4

--

.

.

. . .

..

..

.

_

1

l

9

,

<.

.,

Nebraska Public Power District

-2-

cc w/ enclosure:

Nebraska Public Power District

ATTH:

G. D. Watson, General Counsel

P.O. Box 499

Columbus, Nebraska 68601

Cooper Nuclear Station

ATTN: Guy R. Horn, Division

Manager of Nuclear Operations

P.O. Box 98

Brownville, Nebraska 68321

Nebraska Department of Environmental

Control

ATTN: Dennis Grams, Director

P.O. Box 98922

Lincoln, Nebraska 68509-8922

Nemaha County Board of Commissioners

ATIN: Larry Bohlken, Chairman

Nemaha County Courthouse

1824 N Street

Auburn, Nebraska 68305

Department of Health

Division of Radiological Health

ATTH:

Harold Borchart, Director

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

Kansas Radiation Control Program Director

0.S. Nuclear Regulatory Commission

AVTN: Senior Resident Inspector

P.O. Box 218

)

Brownville, Nebraska 68321

i

U.S. Nuclear Regulatory Commission

{

ATTN:

Regional Administrator, Region IV

611 Ryan Plaza Drive, Suite 1000

'

Arlington, Texas 76011

1

i

-

,

,

.

-

..

Nebraska Public Power District

-3-

bectoDMB(IE01)

bec distrib. by RIV:

'R. D. Martin

  • Resident Inspector
  • SectionChief(DRP/C)

Lisa Shea, RM/ALF

  • DRSS-FRPS
  • MIS System

l

  • RIY File
  • Project Engineer (DRP/C)

,

'

  • RSTS Operator
  • DRP
  • P. O'Connor, NRR Project Manager (MS:

13-D-18)

  • DRS
  • T. Stetka

'

  • P. Wagner
  • w/766