ML20042E372
| ML20042E372 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 04/10/1990 |
| From: | Bradham O SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20042E373 | List: |
| References | |
| NUDOCS 9004200690 | |
| Download: ML20042E372 (3) | |
Text
e 4-South Carolina Oectr6c & Gas Company
- S Bradham J nkinsvitu, GC 2'C;5 Nuciar Oper:t:ons (803) 3454040 e
SCE&G,
s.u.= m.,
April 10, 1990 Document Control Desk U. S. Nuclear Regulatory Commission r
Washington, DC 20555
Subject:
Virgil C. Summer Nuclear Station Locket No. 50/395 Operating License No..NPF-12 Technical Specifications Change l
Request - Diesel Fuel Oil Honitoring Gentlemen:
South Carolina Electric & Gas Company (SCE&G) hereby requests a revision to the Virgil C. Summer Nuclear Station (VCSNS) Technical Specifications.
Specifically, this proposed amendment revises Surveillance Requirement 4.8.1.1.2 of Technical Specification 3/4.8.1, "A. C. Sources," with respect to diesel-fuel oil storage, monitoring, sampling, and analysis.
i The marked-up pagesfor the' proposed amendment to 3/4.8.1 are provided in L. provides the required safety evaluation. The proposed no significant hazards evaluation is provided as Attachment 3.
This submittal is a reformatted version of tM Diesel Fuel Oil Monitoring L
Technical Specifications change Request suMt:d on July 27, 1989.
SCE&G requests the NRC to review and approve this amendment request by L
May 23, 1990.-
This request has been reviewed and approved by both the Plant Safety Review l
r Committee and the Nuclear Safety Review Committee.
l I declare that the statements and matters set forth herein are true and correct to the best of my knowledge, information and belief.
Should you have any questions, please call at your convenience.
Very truly yours, t
$ba
~
O. S. Bradham EWR/OSB:1bs Attachments c:
See page 2 j
9004200690 900410 M
PDR ADOCK 050003951 Il P..
PNV s..
s ti c.
s V
.i b
. Document Control Desk i
I..'
-, - Apr'11 = 12, 1990 -
l Page 2 of 2 l
j c:
D. A. Nauman/0. W. Dixon,=Jr./T. C.'Nichols. Jr.
i E. C. Roberts-R. V. Tanner.
i L
'S. D. Ebneter i
J. J., Hayes Jr.
General. Managers C..A. Price i
R. B. Clary i
L K.-E. Nodland' L
-J. C. Snelson j
R. L. Prevatte 0
H. G. Shealy-J.' B.-Knotts, Jr.
1 W. R. Baehr
-W. F. Bacon H. R.-Goff
'l E. W. Rumfelt
-NSRC i
NPCF i
RTS (TSP 890003) j File (813.20)
.i
-i k
l k
t t
l.
I i
l l
1
[
[
l t
?
7, ATTACHMENT 1 MARKED-UP TECHNICAL SPECIFICATION PAGES Pace Specification Chance Description 3/4 8-3 4.8.1.1.2.c. " Electrical Deletes the current section "c" 3/4 8-4 Power Systems" detailing sampling and testing of fuel oil in accordance with ASTM D270-1975, and inserts new sections "c,"
"d," and "e" which will require sampling under ASTM 04057-81 and ASTM-D2276-88.
3/4 8-4 4.8.1.1.2.d.e.f,g, Relabels sections to be consistent 3/4 8-6a
" Electrical Power with the insert described above.
Systems" i
,