Forwards Combined Requalification Program Evaluation Insp Repts 50-352/90-01OL & 50-353/90-01OL on 900129-0202.Plant Requalification Program Unsatisfactory Based on Less than 75% of Operators Passing Exam
ML20042E358
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/09/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20042E360 List:
References
NUDOCS 9004200677
Download: ML20042E358 (3)


See also: IR 05000352/1990001

Text

.

.,

q*

4:

.

.

APR

81990

Docket Nos. 50-352

50-353

-

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill, Jr.

Executive Vice President - Nuclear

Correspondence Control Desk

P. O. Box 7520

Philadelphia, Pa. 19101

Gentlemen:

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION, LIMERICK GENERATING STATION

(Combined Inspection Report 50-352/90-01 (OL) and 50-353/90-01 (OL))

During the week of January 29, 1990, the NRn conducted a requalification

program evaluation at the Limerick Generating Station Units-1 and 2. . The

evaluation was conducted in accordance with NUREG-1021, " Operator Licensing

Examiner Standards, Rev. 5, section ES-601, " Administration of NRC Requali-

-

fication Program Evaluations." The evalustion had two purposes: (1) to evalu-

4

ate individual licensed operator competency; and-(2) to evaluate the effec-

tiveness of the licensed operator training program. At the conclusion of.the

evaluation, findings related to the preparation and administration of the.

requalification examination were discussed with those members of-your staff-

identified in the enclosed report.

As a resul_t of this evaluation, the Limerick Generating Station Units 1 and 2

requalification program was determined to be unsatisfactory based on less,than

75% of the operators passing the examination.

The NRC results indicate that

4 of the 13 operators examined failed the NRC administered requalification

examination and one of the four crews that participated in the examination

performed unsatisfactorily on the simulator portion of the examination.

In

addition, one reactor operator, who had previously passed an NRCl administered

requalification examination and was-used to complete the crew staffing needs

during the simulator portion of the examination demonstrated unsatisfactory

performance in the simulator.

By letter dated February 7, 1990, your staff provided a basis for continued

operation of Limerick Generating Station.

The acceptance of the basis for

continued operation and actions to be'taken as a result of the unsatisfactory

requalification program determination were the subject of.our' Confirmatory

Action Letter (CAL) 1-90-003, " Unsatisfactory Licensed Operator Requalification

Program," dated February 9, 1990.

The NRC staff will address its follow-up

evaluations of'the operating crews-in Combined Inspection. Reports 50-352/90-10

and 50-353/90-09,

'

90042006n 900409

-

PDR

ADOCK OS000352_

-

em

4

O

90

i

M

'

-

-

J.

.

O

,

Philadelchia Electric Company

2

.

.

In accor::aatr with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter ?nd da: ;nclosed report will be placed in the NRC Public Document Room.

No reply to this letter is required.

Should you have any questions, please

contact Mr. R. Conte, Chief, BWR Section, at (215) 337-5210.

Sincerely,

' Original Signed By:

!

8 44antin VV. Hodges

Marvin W. Hodges, Director

Division of Reactor Safety

i

Enclosure: Combined Report No. 50-352/90-01 (0L)

l

and 50-353/90-01 (OL)

!

CC W/ encl.:

R. J. Lees, Chairman, Nuclear Review Board

G. M. Leitch, Vice President - Limerick Generating Station

D. R. Helwig, Vice President - Nuclear Services

S. J. Kowalski, Vice President - Nuclear Engineering

J. W. Durham, Sr., Vice President and General Council

l

M. J. McCormick, Jr., Manager - Limerick Generating Station

G. A. Hunger, Jr. , Director - Licensing Section

J. Doering, Project Manager - Limerick Generating Station

i

J. F. O'Rourke, Manager - Limerick Quality Division

T. B. Conner, Jr. , Esquire

G. J. Madsen, Regulatory Engineer - Limerick Generating Station

Public Doc'iment Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bct, w/ encl . :

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl.)

Section Chief, DRP

J. Dyer, ED0

R. Conte, DRS

P. Bonnett, DRS

T. Easlick, DRS

,

0FFICIAL RECORD COPY

FLOREK/ LIMERICK REQ./3/1/90 - 0001.1.0

04/02/90

I

,

, - - . - -

ne

i i

--mm-m

.:

.

.

Philadelphia Electric Company

3

.

.

becw/ enc 1.(cont'd.):

D. Florek, DRS

0.L. Facility File

Master Exam File

DRS Files (4)

I

!

l

i

j.

l

!

!

!

h

vPL

i

D

0 : I

ORS:RI

DRS I

S:RI

j'

F1 re dmg

Comte

G llo

Jo

ston

Hodges

Q

Nb0

,

i

-a

I

0FFICIAL RECORD COPY

FLOREK/ LIMERICK REQ./3/1/90 - 0002.0.0

03/01/90

~

-

i

,