Notice of Violation from Insp on 900131-0207.Violation Noted:Failure to Take Action on Various Feedwater Transmitter Calibr Errors Identified by GE & Plant Exceeded Licensed Thermal Power in 1988 Due to Instrument Mod
ML20042E342
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/10/1990
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042E334 List:
References
50-333-90-11, NUDOCS 9004200649
Download: ML20042E342 (1)


Text

--

o ENCLOSURE Notice of Violation New York Power Authority-Docket Nc.

50-333 James A. FitzPatrick Nuclear Power Plant License No. DPR-59 As a result of the inspection conducted on January 31 through February 7,1990, and in accordance with the NP.C Enforcement Policy (10 CFR 2, Appendix C), the.

following violations were identified.

A.

Facility Operating License No. DRP-59,. Section 2.C.(1)' authorizes NYPA to operate FitzPatrick at a thermal reactor power not to exceed 2436 mega-watts (100 percent power of rated power).

Contrary to the above, NYPA operated FitzPatrick at a thermal power -in excess of 2436 megawatts between October 1988 and November 1989.

Based on calculated errors, NYPA operated the reactor at a' power level up to 101.4 percent of rated power. This occurred due to errors in the calcula-tion of feedwater flow transmitter calibration settings regarding static pressurization effects and feed nozzle characteristics.

This violation has been categorized as Severity Level IV (Supplement 1).

B.

10 CFR 50, Appendix B, Criterion XVI, requires in part that measures shall be established to assure that once identified prompt corrective action is.

taken for conditions that are adverse to quality.

Contrary to the above, NYPA fe.iled, following identification by GE, to take prompt corrective action on various feed water transmitter calibra-tion errors, known to have existed at similar' boiling. water reactors.

Failure to take action led to the operation 'of the plant - above the L

licensed core thermal power for an extended period of time. This informa-i tion, provided by GE in October and November 1988, did not get adequately reviewed until November 1989.

This violation has been categorized as Severity Level IV (Supplement 1).

I Pursuant to the provisions of 10 CFR 2.201, the Power Authority of the' State l

of New York is hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written, statement or explanation in reply, including: (1) the corrective steps which will be taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending this response time.

I OFFICIAL RECORD COPY SIR FITZ 90 0004.0.0 04/10/90 9004200649 9oo43o

{DR ADOCK 05000333 PDC

.