ML20042D797
| ML20042D797 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/29/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20042D798 | List: |
| References | |
| NUDOCS 9004090377 | |
| Download: ML20042D797 (2) | |
See also: IR 05000336/1990003
Text
.._
__
10'
4
1
1
.
-
.
,
,
_
MAR 2 91990
Docket No.
50-336
Northeast Nuclear Energy Company
)
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
5
Engineering and Operations Group
1
P. O. Box 270
=i
Hartford, Cor.necticut 06141-0270
Gentlemen:
{
Subject:
Inspection Report To. 50-336/90-03
=
This letter refers to the' routine inspection conducted by Mr. L. J. Prividy
of this o'fice on January 22-26, 1990 at' Millstone Unit 2 in Waterford.
-=
Connecticut. Mr. Prividy discussed the results of the inspection with
1
Mr. Kennan of your staff at the cor.-lusion' of the inspection,
p:
Areas examined during this inspection are described in the NRC Region I
=
Inspection Report which is enclosed with this' letter. Within these areas, the
-2
inspection consisted of selected examinations of procedures and representative
-
records, interviews with personnel, and observations by the inspectors.
Based on the results of ~this inspection, it appears that one of your
"
activities was not conducted in full compliance with NRC requirements,
-2
as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This violation has been categorized by Severity Level in accordance with
-
the General Statement of Policy and Procedure for NRC Enforcement Actions,
You are required to respond to this letter and
.
in preparing your response, you should follow the instructions in Appendix A.
-
The responses directed by this letter and the accompanying Notice are not
,
subject to the clearance procedures of the Office of Management and Budget as
-
required by the Paperwork Reduction Act of 1980, PL 96-511.
51
Your cooperation with us in this matter is appreciated,
d
Sincerely,
)
Oririnni Gig,ned By:
,
- en
Jacque P. Durr, Chief
[
Engineering Branch
-
Division of Reactor Safety
Enclosures:
,
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-336/90-03
_
0FFICIAL RECORD COPY
IR MILL 2 90-03 - 0001.0.0
-"
03/28/90
9004090377 900329
ADOCK 05000336
11'
-
O
\\
yC
,f.
mw~ c g
J
..
.-
o
.
.
.
.
Northeast Nuclear Energy Company
'2
MAR 2 01990
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent-
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
D. B. Miller, Station Superintendent, Haddam Neck
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Atsistant, DRMA (w/o enc 1)
ORP Section Chief
M. Conner, SALP Report: Bely
J. Shediosky, $RI, Hado..n Neck
W. Raymond, SRI, Millstone 3
0..Jaffe, LPM, NRR
J. Djer, EDO
k
Cf
,
ORS:RI
ORS:RI
DRS:RI
Prividy/pmb/rw frEapen
Durr
2/11/90
2/2N/90
J/tT/90
0FFICIAL RECORD COPY
1R MILL 2 90-03 - 0002.0.0
02/15/90
_ .._ _ .
-
.