Advises That Util 891117 Response to Generic Ltr 89-07, Power Reactor Safeguards Contingency Planning for Surface Vehicle Bombs Acceptable
ML20042D339
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/14/1989
From: John Hickman
Office of Nuclear Reactor Regulation
To: Holtzscher D
ILLINOIS POWER CO.
References
GL-89-07, GL-89-7, TAC-74656, NUDOCS 9001090013
Download: ML20042D339 (3)


Text

. 3;

}r F

"4C:w l DecemberL14, 1989 1

~~

y 1

g. ; f,r

,13.

g.

i QTjDh3

'n Docket No. 50-461 lp.d Ea BGrimes J

p1

.NRC & Local PDRs ACRS(10) o

' Sfir Mr. Dale L..Holtzscher

.l

? Acting Manager. Licensing and Safety PD111-2 R/F:

Eleeds

^l y"

Clinton Power Station-JCraig JZwolinski P.O.. Box 678-

.LLuther JHickman j

Mail Code V920 OGC-EJordan

?Clinton Illinsis 61727 CMoore BMendelsohn 4

(

Dear lMr.1Holtzscher:

7

'l

'LSUBJECTF.CLINTON POWER STATION RESPONSE TO NRC GENERIC LETTER 89-07

.I L(TAC N0i 74656)

?

OhAprif28/1989,ith'eNRCissuedGenerie Letter 89-07

" Power Reactor LSafeguards Contingency Planning' for Surf ace Vehicle,Bont>s." The purpose of

.the Generic l Letter was;to request: licensees to modify, as.necessary, their

,l 1..;c safeguards contingency: procedures'to address the possibility of a land vehicle.

j g

,1 bomb. Guidance for. the developinent of such contingency procedures was L,

'provided.

By: letter da'ted November 17,-1989, you responded to Generic Letter 89-07.

JYour response stated that an appropriate safeguards contingency procedure for the. possibility of a land vehicle bomb had been implemented for the Clinton

'. Power Station..The staff considers this response satisfactory and, therefore,.

your
requirements:for responding'to NRC Generic Letter 89-07 are fulfilled.

[

Sincerely,

/s/

l w

John B. Hickman, Project Manager-0 Project Directorate III-2 Division of Reactor Projects - III -

IV, V and Special Projects Office of Nuclear Reactor Regulation cc:. See.next page' J

7 C:P PDIll-2:LA

PDIII-2:PD l

c----: g g g :--------

-:------ g :------------:------------::------------:---------

[AME:JEchman:sr:lluther

JCraig b.__.:.......__...:

$ ATE!:12//f/89 '

12//2t/89
12M/9 D

OFFICI AL RiiCORD COPY

. Document-Name:.CLINTON GL 8907 A

9001090013 891214 M

1 H

PDR ADOCK 05000461 PDC i g 1:

F W

4, g" '

~

Mi j

yn W

}Y ?'i }l

~

8 noe f $l,,, J ' b n f

~ UNITED STATES..

l 1

7 d:l lo NUCLEAR REGULATORY COMMISSION D%y'jf,($ "*

i f.g WWNGToN, D, C. 20656 :

p g;

December 14. 1989 i

g[

^

s**s*.

i+f E, iDocketl.No.L 502461 M%

j FBF

Mr.TDale'L. Holtzscher.

u wj".

gl,

. Acting Manager'. Licensing and Safety

'M.

Clinton Power Station

~

u 2 S

" P.O. Box 678.-'

~

P*

Mail Code V920?

JClinton,,111inois';61727' m

D i

' I.

Dear Mr. Holtzscher:

?

q 9

CLINTON POWER STATION: RESPONSE TO NRC GENERIC LET1ER 89-07

SUBJECT:

r

~

1 (TAC.NO.74656)

~

.,.,(

t, l'

Safeguards Contingency ~ Planning for Surface Vehicle-Bombs." The purpose of ithe Genericitetter was.to. request licensees;to modify, as necessary, their.

.e 6

isafeguards contingency' procedures to; address the possibility of a land vehicle i

y *%

bomb. ' Guidance.for: the development.of; such contingency procedures 'was.
provided.
By11etter dated.' November 17, 1989, yc9 responded to' Generic Letter 89-07.
<Yout response stated 1that-an appropriate safeguards contingency procedure for the possibility of;'a! land-vehicle-bomb had been implemented for the:Clinton, r

PowerJStation.1 The-staff. considers this-response satisf actory and,= therefore, syour requirements for: responding)to NRC Generic' Letter 89-07 are fulfilled.

c Sincerely,

/D 7

John B; Hickman, Project Managa-Project Directorate.III-2 Division of Reactor Projects - III,

. IV, V and Special Projects Office of Nuclear Reactor Regulation cc:

See next page k

y l

E l

Ef T;

i i pf

, 3:

n; w

+

4 Wh

_ ;f J_ ; /;7 3.

Mr.' Dale L. Holtzscher Clinton Power Station W

Illinois Power Company Unit 1-

-r

, C C' s

Mr. J. S; Perry 1111nois Department

W

' Assistant Vice Presidenti of Nuclear Safety

>Clinton Power Station

Office of Nuclear Facility _ Safety h,,

.P.'O. Box'678 1035 Outer Park Drive Clinton, Illinois ~, 61727 Springfield, Illinois 62704 r

.Mr. R. DL Freeman Mr. Donald Schopfer Manager-Nuclear. Station Engineering Dept.

Project Manager

Clinton' Power Station:

Sergent & Lundy Engineers ok P. O. Box 678-55 East Monroe Street

Clinton' Illinois 61727 Chicago, Illinois 60603 c

Sheldon Zabel, Esquire?

Schiff, Hardin & Waite-o

7200 Sears Tower

-233 Wacker Drive-Chicago, Illinois-60606 PisidentInspector-U. S.. Nuclear Regulatory Commission RR#3, Box 229 A Clinton Illinois 61727~

, Mr. : L. Larson.

project Manager.

General Electric Company 175 Curtrer Avenue. N/C-395 San Jose, California o5125 Regional Administrator, Region 111 1799 Roosevelt Road, Bldg. #4

Glen Ellyn, 1111r.ois'60137
Chairman of DeWitt. County c/o. County Clerk's Office

-DeWitt County Courthouse

-Clinton,' Illinois 61727 Th

,