ML20042D330
| ML20042D330 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/29/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20042D331 | List: |
| References | |
| NUDOCS 9001090002 | |
| Download: ML20042D330 (2) | |
See also: IR 05000213/1989023
Text
g
';
_;
b-
y
~
a%
-
p
-
-
'
. . . .
w.
',
'
,
p
.l
,
?
' DEC 2 91999
'
'
L
.i
L
j
Docket No. 50-213
i
Connecticut Yankee Atomic Power Company
a
b
-ATTN:. Mr. E. J. Mroczka
-
'
- Senior Vice President - Nuclear
L
. Engineering and Operations
,
b
P.'0; Box 270-
Hartford, Connecticut.-06141
m
6
-Gentlemen:'-
,
o
Subject:
Inspectio_n Report Number 50-213/89-23
7
This' letter refers,to the routine safety. inspection conducted by
,'
Mr. Joseph A. Golla. of: this office 'on November 27 - December 1,1989 of
.'
b
activities related to the implementation of your Inservice test program and to
"
the discussions of our findings' held by Mr. Golla.with Mr. Donald Miller.of
'
-your staff-at-the conclusion of the inspection.
.,
!
Areas examined'during this inspection are described in the NRC Region I
q
. Inspection- Report which is enclosed with this letter. Within these areasc the
!
' inspection consisted of selective examinations of procedures and representative-
~
-
c records,, interviews' with personnel, and observations by the inspector.
!
\\
"
Within the scope of this-inspection, no violations were observed.~
- No reply to this letter is required. Your cooperation with us in this matter
>
,
is appreciated.
t
Sincerely,
,
Oridnal Stacd By:
'
Ack 11. Shosnider
.
Jacque P. Durr, Chief
Engineering Branch
"
,.
Division of Reactor Safety
i
Enclosure:
f'
NRC tegion I. Inspection Report Number 50-213/89-23
f
9001090002 891229
hi
I
ADOCK0500g3
,
O
0FFICIAL RECORD COPY
IR HN 89-23 - 0001.0.0
s
12/28/89
I
I
\\
IE'Ol
,
x
a
-
y w
,
p
3
i,+
.,
..
.
r
.
[A
DEC 2 91983-
1
. ' '
Connecticut. Yankee Atomic Power
2
'~
-"
Company-
kk
- cc w/ enc 1:
.
.
W. D. Romberg, Vice President, Nuclear Operations
D. B. Miller, Station Superintendent
D. 0.- Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
,h"
, S."E. Scace, Station Superintendent, Millstone
Gerald Garfield, Esquire
" . .
- Public Document Room ~(PDR)
"
,
'~
Local Public Document Room (LPDR)
.
Nuclear Safety Information Center (NSIC)
i'
NRC Resident Inspector-
H,l
State of Connecticut-
bec w/ encl:
. Region 1 Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
-
DRP Section Chief
i
A. Wang . LPM, NRR
J
M. Conner,.SALP Reports Only
- J. Shedlosky, SRI, Haddam Neck
W. Raymond,. SRI, Millstone 1&2
..
J. Dyer, EDO
.
I
l
'
i
.I
l-
I
,
l-
I
'
!
If
R
\\
\\
'
RI: S
R%RS
RI:DRS
1
-pola/ tim /rw
Espen
- ]urr
i
h/89
-12
12/ /89
12/gj /89
g
h
0FFICIAL RECORD COPY
IR HN 89-23 - 0002.0.0
)
0
12/28/89
,
1
_