ML20042D317
| ML20042D317 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/22/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20042D318 | List: |
| References | |
| NUDOCS 9001080266 | |
| Download: ML20042D317 (2) | |
See also: IR 05000336/1989020
Text
s
_
_
'
- '
.
'
,
,
,
.
.
>
,u
DEC 2 21909
Docket No.
50-336
,
Northeast Nuclear Energy Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection Report No. 50-336/89-20
This letter refers to the routine inspection conducted by Mr. Robert Winters
of this office and Mr. C. V. Codd a consultant from the Oak Ridge National
Laboratory, on November 7-9, 1989 at Millstone Unit 2 in Waterford, Connecticut.
Mr. Winters discussed the results of the inspection with Mr. Keenan of your
l
staff at the conclusion of the inspection.
This inspection was directed at activities related to steam generator eddy current
testing during the mid-cycle outage. Areas examined during this inspection are
described in the NRC Region I Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selected examinations
of procedures and representative records, interviews with personnel, and obser-
!-
vations by the inspectors.
Within the scope of this inspection, no violations were observed.
We note that a meeting to discuss the results of your mid-cycle steam generator
inspection has been scheduled at NRC headquarters on February 8, 1990. Results
l
of your evaluation of the eddy current test data, analysis of the removed tube
l'
samples, your estimated rate of cracking, and future inspection plans will be
subjects of particular interest at that meeting.
l
l
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
'l
Sincerely,
n ,.
a - _ m m. :
R q.
&HU
,;JacqueP.Durr, Chief
.
'
^
t
d
Engineering Branch,
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report No. 50-336/89-20
0FFICIAL RECORD COPY
IR 50-336/89-20 - 0001.0.0
9001060266 891222
I\\
>
{DR
ADOCK 05000336
1
1 E 8.1
a
__
.
.
. . . -
,
.
Northeast Nuclear Energy Co.
2
CEC 2 21S09
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
D. B. Miller, Station Superintendent, Haddam Neck
Gerald Garfield, Esquire
PublicDocumentRoom(PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DRP Section Chief
J. Shedlosky, SRI Haddam Neck
W. Raymond, SRI, Millstone
D.- Jaffe, LPM, NRR
J. Dyer, EDO
R. Bores. DRSS
C. Y. Cheng, NRR
.
RI:DRS
RI:DRS
RI
S
'
ters
Strosnider
Du
0
l-
12Ao/89
12/2 /89
12/p/89
'
0FFICIAL RECORD COPY
IR 50-336/89-20 - 0002.0.0
12/20/89
l
l
L-
-
A