ML20042D283
| ML20042D283 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/29/1989 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mcneill J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20042D284 | List: |
| References | |
| NUDOCS 9001080216 | |
| Download: ML20042D283 (2) | |
See also: IR 05000277/1989025
Text
sir';
g;
,;
-
,
,
y y.c c
'e
'
.;#
'
...,
,.
,_ ,
if
,
'
DEC 2 91989 -
. Docket Nos. 50-277-
-
50-278
'
m
Philadelphia. Electric Company
ATTN: .Mr. C.-A.:McNeill
Executive Vice President-Nuclear
,.i
-Correspondence Control. Desk
'P. O. Box.7520
Philadelphia,' Pennsylvania- 19101
Gentlemen:
"
Subject: Combined. Inspection Report Number 50-277/89-25; 50-278/89-25
A
- This = letter refers to the.' routine safety inspection conducted by R. A. McBrearty
Lof this office.on November 27 - December 1, 1989 at the Peach Bottom Atomic
Power Station, Units 2 and 3 in Delta, Pennsylvania. Mr. McBrearty discussed
the findings of. the inspection with Mr. J. Franz of your staff at the conclusion
-of:the, inspection.
.
. Areas examined during this inspection are described in-the NRC Region I
-Inspection Report which is enclosed with this letter. Within these areas, the
+
inspection consisted of selective examinations of procedures;and representative
- records, interviews with personnel, and observations by the inspector.
Within the~ scope of this inspection, no violations were observed.
No reply to this-letter is required. Your cooperation with us in this matter
- is appreciated.
Sincerely,
OriCinal SI:ned By:
P. K.T4. pen
Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: Combined NRC Region I Inspection Report Number 50-277/89-25;
50-278/89-25
0FFICIAL RECORD COPY
CIR pB2&3 89-25 - 0001.0.0
9
12/29/89
Pg1080216891229
s\\
-
ADOCK 05000277
g
--
_-_______-_-_-____-___-__'M---_-
T
.
. --
-
,
-
,
<
x
.
. :;
DEC 2 91989:
.
'4
> thiladelphia Electric Company.-
2.
.
cc w/ enc 1:
.
-
'D. R. Helwig, Vice' President, liuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President Peach Botton Atomic Power Station
Jack Urban, General fianager, Fuels Department, Delmarva Power & Light Co.
,
John F. Franz, Plant lianager, Peach Bottom Atomic Power Station
T. E. Cribbe, Regulatory Engineer,-Peach Bottom Atomic Power Station
J. P. Wilson, Acting Project flanager, Peach Bottom /itomic Power Station
Troy B. Conner, Jr., Esquire
W.' H. Hirst, Director, Joint Generation Projects Department.
.'.tlantic Electric
Bryan' W. Gorman, flanager, External Affairs
.E. J. Cullen. Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire
Thomas flagette, Power Plant Siting Nuclear Evaluations
.
G. A. Hunger, Director, Licensing Section
'
-Doris Poulsen, Secretary of Harford County Council
1
R. J. Lees, Chairman, Nuclear Review Board
Public Document. Room (PDR)
Local Public Document Room (LPDR)
14uclear Safety Information Center (!! SIC)-
NRC Resident Inspector
'!
,
Comonwealth of Pennsylvenia
i
.bcc w/ encl:
Region I: Docket Room (with concurrences)
,
. Management Assistant, DRMA (w/o er.cl)
i
DRP Section Chief
I
fiont Conner, SALP Reports Only
!
PA0 (2) SALP Reports and All Inspection Reports
-
R. itartin, NRR
i
J. Dyer, EDO-
R. ficBrearty, DRS
R. Bores, DRSS
(
.
'
.
1
)
RI:DRS
- j
A'
RI:DRS
RI' RS
p0urr
McBrearty
Strosnider
j
\\ 12/28/89
12/26 /89
12/jf/89
0FFICIAL RECORD COPY
CIR PB2&3 89-25 - 0002.0.0
12/28/89
.
__
-