ML20042D265

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Board Repts 50-424/89-26 & 50-425/89-30 for Oct 1988 - Sept 1989.Improvements Noted in Areas of Maint/Surveillance & Radiological Controls.Further Improvements in Radiological Controls Expected
ML20042D265
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/06/1989
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML20042D266 List:
References
NUDOCS 9001080174
Download: ML20042D265 (4)


See also: IR 05000424/1989026

Text

g

-

-

-

g.

,T

OFFICIAL FILE COPY

F:

. %-

4

/ :W '

?

G

)

'

i

DEC 0 61989

j

i

.

f

Docket Nos.- 50-424. 50-425'

!

u

License Nos. .NPF-68. NPF-81

.

L

j

g

' Georgia Power Company

!

ATTN:

Mr.,W. G. Hairston. III-

!

>

.

Senior Vice. President -

i

b

..

. Nuclear Operations

>

P

P. 0. Box.1295-

Birmingham. AL 35201-

!

Gentlemen:

I

'

~ SUNECT: ' SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

'(NRC INSPECTION REPORT NOS. 50-424/89-26AND50-425/89k)

.

The Nuclear Regulatory Commission (NRCF Systematic Assessment of Licensee

, Performance (SALP1 Board has completed i .', periodic evaluation of your Vogtle

i

b

-facility for the period October 1.1988. .through September 30, 1989.

The

l

'

results of this evaluation are documentec in the enclosed SALP. Report.

This

report will be discussed with you'at a pub N meeting to be held at your Vogtle

"

facility in Waynesboro; Georgia on December 24, 1989, at 10:00 a.m.

l

t

T

The performance of your Vogtle facility was evt uated in the fur.ctional areas

!

'of plant operations. radiological controls, maint' nance / surveillance. emergency

I

l

4

,

preparedness. security and safeguards

engineering / technical support, safety

!

assessment / quality verification, preoperational testing, and startup testing,

.

t

Although.the functional areas evaluated during this assessment period are not

i

1

' identical to those evaluated in the previous period, a close correlation can be

'

.

'made'for identifying changes in performance.

l

The overall level of performance attained during this SALP period is comparable

!

- to that of:the last SALP period.

Lessons learned during startup and early

operation of Unit I were effectively applied to Unit 2 activities.

Professionalism in the control room was a strength and management support for

,

operations was strong.

Improvements have been noted in the areas of main-

i

,

tenance/ surveillance and radiological controls.

Further improvements in

radiological controls are expected ~ as the plant staff gains experience.

!

Although. the Securit.y Program. as defined on paper, is sound, implementation

deficiencies have caused declining performance in this crea.

A decline of

i

performance in the emergency preparedness area was also noted. The decline in

'

this area-is: attributed to the loss of command control and the failure to make

a timely General Emergency declaration during your exercise.

As discussed in

.

the previous SALP. improvement in communications between management and the NRC

'

residents was needed.

Progress has been made in this area; however, communi-

cation channels need to be further nurtured.

Attention to detail within the

plant staff was also a source of performance short-comings.

Increased

management attention is warranted in this area.

"

9001000174 891206

PDR

ADOCK 05000424

G

PNU

'

_

g

,

6

i

,

a

a

g

...

,

.91

DEC 06 Trj3

,

Georgia Power Company

2

I

j

Any comments you have concerning our evaluation of the perforinance of your

i

facility should be submitted to this office within~30 days following the date

'

y'

of our meeting.

These comments will be considered in the development of the

Final SALP. Report. Your comments, a summary of our meeting, and my disposition

[

' of your coments will be issued as appendices to the Final SALP Report.

I

' Should you have any questions concerning this letter. we will be glad to

discuss them with you.

j

Sincerely.

ORIGINAL SIGNED BY

,

ALBERTS F. GIBSON/for

,

!

.

I

Stewart D. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report - Vogtle

cc w/ enc 1:.

R. P. Mcdonald

Executive Vice President-Nuclear

Operations

f

Georgia Power Company.

P. O. Box 1295:

Birmingham. AL- 35201

C.'K. McCoy

Vice President-Nuclear

i

Georgia Power Company

l

P. O. 1295

Birmingham. AL 35201

,

t

G. Bockhold. Jr.

General Manager. Nuclear Operations

Georgia Power Company

P. O. 1600

Waynesboro. GA 30830

J. A. Bailey

,

Manager-Licensing

Georgia Power Company

P. O. Box 1295

'

-Birmingham. AL 35201

B. W. Churchill Esquire

Shaw. Pittman. Potts, and Trowbridge

2300 N Street. NW

Washingten. D. C.

20037

(ce w/ enc 1 cont'd - see page 3)

[

b

,

C

-.

T

'

.,

.,

-Georgia Power Company-

3

pgc 0 01989

j

!

,

i

cc w/ enc 1:. Cont'd

'

J. E. Joiner.' Esquire

'

'

0

~lTroutman. Sanders. Lockerman, and

1

Ashmore

.

!

1400 Candler Building

'

['

127 Peachtree Street. NE

Atlanta. GA 30303

i

>

>

y

j.

D. Kirkland. III. Counsel-

!

!"

Office of the Consumer's

.

'

Utility Council

Suite.225. 32 Peachtree Street NE

(

Atlanta. GA 30302

' Office of Planning and Budget

!

Room 615B-

.

i

270 Washington Street. SW

L

Atlanta, GA'. 30334

Office of the County Commissioner

. Burke County Commission

r

Waynesboro. GA 30830

'

,

,J. Leonard Ledbetter. Director

Environmental Protection ~ Division

Department of Natural Resources

205 Butler Sttvet ~SE. Suite 1252

' Atlanta. GA 30334

,

' Attorney General-

.

Law Department

p

132 Judicial Building

'

Atlanta. GA' 30334

,

State of. Georgia

.

bec w/ enc 1:-

.K. M. Carr. Chairman

y

T. M. Roberts. Commissioner

F. J. Remick, Connissioner

.K. C. Rogers. Commissioner

i

J

R. Curtiss. Commissioner

-

J. M. Taylor. E00

'

H. L. Thompson. Jr. . EDO

I

R. W. Borchardt. Regional

Coordinator. EDO

'T. E. Murley. NRR

'

-(bec w/enci cont'd - see page 4)

,

y

'o

.

.

.

. .

.

-

. .

ym+

-

[

'

.

-

,

l

.c-

.

i

'

'

7

. Georgia Power Company

4

)

'

DEC 0u Int

+

Lcc w/ enc 1: : Cont'd

5. Varga..NRR.

'

E. Reis. OGC

4

f J. Hopkins. NRR-

D. Matthews. NRR-

{

L. Trocine. DRP. RII

i

>

- R. Nease. SALP Coordinator. NRR

j

= Regional Administrators. RI. RI!!

RIV. and RV-

i

4:

1. : Clark. RII. PA0

i

K. Brockman. DRP. RII

j

A. Herdt. DRP, RII

K. Landis. Chief. TSS

,

,

..

- NRC Resident Inspector

DRS and DRSS Branch Chiefs.

1

and Section Chiefs

INPO

)

i

'IMPELL

Document Control Desk

e

i

I

)

4

.

i.

,

l$. A> lA

,

,

RIl

RII

RII

RI

RII

RII )$'

RII T l Ro{45

'

of)

k

4

d

sf 7

41

,

rdt

Jyopkins 'DMatthews

e

KBrdekmanAHe//8912/f/89

'

LTrocinep12/3/89

gge

12/ f/89 12/

12/ f/89 12/ /89 12/ /89

12/r/89'

'

VJ

Pu

RI

RII

Tele '"

7 "'"

'AGi & n

Milh an

l_

12/f/8

12/h/89

L

,

,.