-l-4(
January 26,1989
&p p,
k'[r$',,"
J
..v
.. xi.
g,W kEMORANDilM FOR:
All. Project Managers L
3 m,
{y/."
M FROM:
James C. Stone, Project Manager J
Pro.iect Directorate I-2 l
Division of Reactor Projects I/II a..;
d.E.
SUBJECT:
NRC BULLETIN 88-10: NON. CONFORMING MOLDED-CASE CIRCUIT L
- .f4.
BREAKERS 4
7,
.'h"'
Enclosed are two memos that have a direct bearing on the application of Bulletin 88-10 by licensees.
The first memo, Rossi to Varga/Holahan dated January 5,1989, address the actions that Itcensees are to take if they choose not to test any untraceable l
breakers. The second memo, Grimes to Regional DivTsTon Directors, dated December 12, 1988, asks that Ifeensees be requested to hold any breakers that fall during testing for at least six months. One additional clarification to that memo is needed.
If the Itcensee chooses not to test the untraceable breakers, those untested breakers should also be held at least six months.
k Note that these internal memos should not be released directly to the licensees.
if you have any questions either call me 021422) or the contact listed in the
.,4 enclosed memos.
/5/
I James C. Stone, Pro.iect Manager Project Directorate I/II Division of Reactor Projects I/II f
Enclosures:
/,,
1.
Rossi Memo 2.
Grimes Memo t.
DISTRIBUTION: w/ enclosures l
?
Doctetcgie PDI-2 Reading e
WButler JStone M0'Brien SVarga/BBoger 0Crutchfield GHolahan PGrimes EBrach FHebdon TMartin, EDO WHutchinson, 01 ERossi FRosa JGuillen h
'9 PGill AThadani
[MANAGERSHEM01 0
j f' b PDI-2/PM PO!-2/D I
/ " JStone:tr WButler i
l
/ /Jg,/89
/p89 D ' ji j
'l 7 Quo &.nu)fc 5 'q(f h
iD&R-i'i 'IEB CDC
(
t y I e' OA
/-\\
UNITED STATES g!". p
.[
g NUCLEAR REGULATORY COMMISSION r
i'y
\\,,,,,, /p wAsHwoToN, D. C. 20006
- s. ',
January 26,1989
,(
)$
HEMORANDUM FOR:
All Project Managers b
FROM:
James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects 1/11
'g
SUBJECT:
NRC BUlt.ETIN 88-10: NON-CONFORMINA MOLDED CASE CIRCUIT BREAKERS Enclosed are two memos that have a direct bearing on the application of 1
Bulletin 88-10 by licensees.
\\
The first memo, Rossi to Varga/Holahan dated January 5,1989, address the actions that licensees are to take if they choose _noi to test any untraceable breakers. The second memo, Grimes to Regional DivTsTon Directors, dated December 12, 1988, asks that licensees be requested to hold any breakers that, fail during testing for at least six months. One additional clarification.to L
that memo is needed.
If the licensee chooses not to test the untraceable breakers, those untested breakers should also be held at least six months.
o Note'that these internal memos should not be released directly to the
. licensees.
If you have any questions either call me (X21a?2) or the contact listed in the enclosed memos.
l l-l
/
VA -
V. AVW James C. Stone. Project Manager Pro.iect Directorate I/II Division of Reactor Projects I/II Enciosures:
1.
Rossi Memo 2.
Grimes Memo l
\\
l l-