Forwards Monthly Operating Rept for Jul 1981
ML20042C416
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 08/06/1981
From: Mathews E
WISCONSIN PUBLIC SERVICE CORP.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20042C417 List:
References
CON-NRC-81-123 NUDOCS 8203310386
Download: ML20042C416 (1)


Text

NRC-81-123

,m WISCONSIN P U B LIC S ERVICE CORPORATIO N - c ":w.w P.O. Box 1200, Green Bay, l'.'isconsin 54305 August 6, 1981 Director .

Office of Management Information &

Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Docket 50-305 Operating Lict_nse DPR-43 Kewaunee Nuclear Power Plant Monthly Operating Report _

The narrative " Summary of Operating Experience" and completed forms covering plant and component availability for the Kewaunce Nuclear Power Plant for July,1981, are enclosed.

Also enclosed is an updated Operating Data Report for June,1981. The-change involves item 14 which was over-reported by 0.7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> in the June, 1981, monthly operating report.

Very truly yours, (lJd!A E. R. Mathews, Senior Vice President Power Supply & Engineering anf Enc.

cc - Mr. J. G. Keppler, -Reg Dir US NRC - Region III Mr. Ted Cintula '

US NRC - Maryland National Bank Bldg Washington, D. C. 20555 Mr. Robert Nelson, NRC Resident Inspector p

RR #1, Box 999, Kewaunee, WI. 54216 -