ML20042C360

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-373/81-44 on 811222-23,29-30, & 820107,14 & 27-29 & Notice of Violation
ML20042C360
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/15/1982
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20042C361 List:
References
NUDOCS 8203310283
Download: ML20042C360 (2)


See also: IR 05000373/1981044

Text

.

'M

4

MAR 151982

g.

RECB'!En

9

'

Docket No. 50-373(DETP)

k-

--

-

.

IMR3 01982< g

Commonwealth Edison Company

C ACm c=n na

'

b

Dy*;FMU

ATTN:

Mr. Cordell Reed

Vice President

/ '-

/

Post Office Box 767

%

_N

,

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection condu~cted by Mr. I. T. Yin

of this office on December 22-23, 29-30, 1981; and January 7, 14, 27-29,

1982, of activities at LaSalle County Station, Unit 1, authorized by NRC

Construction Permit No. CPPR-99 and to the discussion of our findings with

Mr. B. B. Stephenson and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response, submitted under oath or affirmation, is required.

In accordance with'10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this' report contains any information

that you (or your. contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days frem the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)'

days from the date of this -letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

11shed. Consistent with Section 2.790(b)(1), any such application.must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which'are the bases for the

claim that the information should be withheld 'from public disclosure.

This section further requires the statement to address with specificity

~

9203310283 B20315

7$1

PDR ADOCK 05000373

A-

g

i

G

PM

9'

.

-

-

-

.

e

o

Commonwealth Edison Company

2

MAR 151982

the considerations listed in 10 CFR 2.790(b)(4). The information sought

.to be withheld shall be incorporated as far as possible into a separate

part of the_ affidavit.

If-we do not hear from you in this regard within

'

the specified periods noted above, a copy' of t is letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

The responses directed by this letter (and the accompanying Notice) are

not subject to the clearance prccedures of the Office of Management and

,

Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

.

We will gladly discuss any questions you have concerning this inspection.

.

Sincerely,

i

C. E. Norelius, Director

Division of Engineering and

,

Technical Programs

,

.

Enclosures:

'

1.

Appendix, Notice

of Violation

2.

Inspection Report

,

No. 50-373/81-44(DEPT)

"

cc w/encls:

Louis 0. De1 George,. Director

of Nuclear Licensing

R. Cosaro, Site Construction

,

Superintendent

,

T. E. Quaka, Quality

Assurance Supervisor

.

R. H. Holycak, Station

Superintendent

B. B. Stephenson, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

RIII.

RIII

RLI

RIII

RIII

Ck

K}nop

'

y

o

Dan

on

i tie-

N

2/9/82

.

7

3 pkI2-

'

%

,

e- r