ML20042C360
| ML20042C360 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/15/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20042C361 | List: |
| References | |
| NUDOCS 8203310283 | |
| Download: ML20042C360 (2) | |
See also: IR 05000373/1981044
Text
.
'M
4
MAR 151982
g.
RECB'!En
9
'
Docket No. 50-373(DETP)
k-
--
-
.
IMR3 01982< g
Commonwealth Edison Company
C ACm c=n na
'
b
Dy*;FMU
ATTN:
Mr. Cordell Reed
Vice President
/ '-
/
Post Office Box 767
%
_N
,
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection condu~cted by Mr. I. T. Yin
of this office on December 22-23, 29-30, 1981; and January 7, 14, 27-29,
1982, of activities at LaSalle County Station, Unit 1, authorized by NRC
Construction Permit No. CPPR-99 and to the discussion of our findings with
Mr. B. B. Stephenson and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or affirmation, is required.
In accordance with'10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this' report contains any information
that you (or your. contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days frem the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)'
days from the date of this -letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
11shed. Consistent with Section 2.790(b)(1), any such application.must
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which'are the bases for the
claim that the information should be withheld 'from public disclosure.
This section further requires the statement to address with specificity
~
9203310283 B20315
7$1
PDR ADOCK 05000373
A-
g
i
G
9'
.
-
-
-
.
e
o
Commonwealth Edison Company
2
MAR 151982
the considerations listed in 10 CFR 2.790(b)(4). The information sought
.to be withheld shall be incorporated as far as possible into a separate
part of the_ affidavit.
If-we do not hear from you in this regard within
'
the specified periods noted above, a copy' of t is letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance prccedures of the Office of Management and
,
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
i
C. E. Norelius, Director
Division of Engineering and
,
Technical Programs
,
- .
Enclosures:
'
1.
Appendix, Notice
of Violation
2.
Inspection Report
,
No. 50-373/81-44(DEPT)
"
cc w/encls:
Louis 0. De1 George,. Director
of Nuclear Licensing
R. Cosaro, Site Construction
,
Superintendent
,
T. E. Quaka, Quality
Assurance Supervisor
.
R. H. Holycak, Station
Superintendent
B. B. Stephenson, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RIII.
RIII
RLI
RIII
RIII
Ck
K}nop
'
y
o
Dan
on
i tie-
N
2/9/82
.
7
3 pkI2-
'
%
,
e- r