ML20042C349

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/82-02 on 820111-31 & 0201-23. No Noncompliance Noted
ML20042C349
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/12/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20042C350 List:
References
NUDOCS 8203310267
Download: ML20042C349 (2)


See also: IR 05000423/1982002

Text

r------------------

- - - -

--

-

,..u. ,

.

.

A

I

MAR 121982

Docket No. 50-423

e

N

Northeast Nuclear Energy Company

9

ATTN: Mr. W. G. Counsil

&

RECElVED

Senior Vice President - Nuclear

9

-

Engineering and Operations Group

3

MAR 3 01982> -

P. O. Box 270

E-

u s w m a' e m

Hartford, Connecticut 06101

naugm u

7

Gentlemen:

g

Subject:

Inspection 50-423/82-02

This refers to the routine safety inspection conducted by Mr. J. Mattia of this

office on January 11-31 and February 1-23, 1982, at the Millstone Nuclear Power

Station, Unit 3, at Waterford, Connecticut and Stone & Webster Corporate Office,

Boston, Massachusetts, of activities authorized by NRC License No. CPPR-113 and

to the discussions of our findings held by Mr. Mattia with Mr. Toth and others

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspec-

tion Report which is enclosed with this letter. Within these areas, the in-

spection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC Public Document Room unless you notify this office, by tele-

phone, within ten days of the date of this letter and submit written application

to withhold information contained therein within thirty days of the date of this

letter. Such application must be consistent with the requirements of 2.790(b)(1).

The telephone notification of your intent to r(quest withholding, or any request

for an extension of the 10 day period which you believe necessary. should be made

to the Supervisor,FilesMailandRecords,USNRCRegionI,at(215)337-5223.

No reply to this letter is required. Your cooperation with us in this matter is

appreciated.

Sincerely,

er W stene& N

"

-

Richard W. Starostecki,

rector

Division of Project and Resident

k

/;n 'S

$,D. \\

cmcr> ..B.I.128 ..... hR I,;,D,P,R,P,',[,,)

,,,B,(,$,f, , ,,,,,,,

,,hd

RP

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , ,

...E..l..s a s..s5

...

sun == > ..M..a..t..t..i..a /..c.. ....

Bru

er

..... ...nner

. . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . .

.

.S hs /cr

N...

rV

n

.. .

r'203310267 820312

~~ a -

- ~ ~ -

~ ~ ~ ~ - - - ~ ~ -

- - - - - ~ ~ ~ ~ -

- ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ - ~ ~

[jDRADOCKOSOOO2

pD

OFFICIAL RECORD COPY

usoeo: mi-an.

. _ _ _ _ _ _ _ _ ___

.

.

Hortheast Nuclear Energy Company

2

E 1 % 1962

Enclosure: HRC Region I Inspection Report

Number 50-423/82-02

cc w/ enc 1:

K. W. Gray, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

J. F. Opeka, Vice President, Nuclear Operations

R. T. Laudenat, Manager, Generation Facilities Licensing

D. G. Diedrick, Manager of Quality Assurance

PublicDocumentRoom(PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ enc 1:

Region I Docket Room (w/ concurrences)

Chief, Operational Support Section (w/o enc 1)

!

-

l

,

orrice)

. . . . . . , , . . . . . . . , . . . . ,

, , . . . . . . . . . , , , , , . . . . . . .

. . . . . . . , , , . . . , . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . .

. . . , . . . . . . . . . . . . . . . . . . ,

. . . . . . . . . . . . . . . . . . . . . . . .

, , , , , , , , , , , , , , , , , . . . . .

sunnue >

. . . . . . . . . . . . . . . . . . . . . . . .

, . . . . . . . . . . . . , , , , , , , , .

, , , . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . ,

. . . . , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

, , , , , , , , , , , , , , , , , , , , , , , ,

en >

. . , . . . . . . . , . . . . . . , .

. . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . .

. . . . , . . . . . . . . , , . . . . . . .

. . . . , , , . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . .

, , , , , , , . . . . . . . . . . . . . . . . .

unc ronu sia 00* nacu ano

OFFICIAL RECORD COPY

usom ini-m.m .