{{#Wiki_filter:._. . . l5E315 UO2 N \\ % $ n " ' Docket No. 50-305(DETP) HECEiVED 9 Wisconsin Public Service D ! -~ , Corporation 2 O blOO N % ! A'ITN: Mr. E. R. Mathews u mmamagg - Senior Vice President 1[8E Power Supply and df f Engineering 'D 93 Post Office Box 1200 ' Green Bay, WI 54305 e f Gentlemen: , This refers to the routine safety inspection conducted by Mr. D. L. Robinson i of this office on March 4, 1982, of activities at Kewaunee Nuclear Power Plant authorized by NRC Operating License No. DPR-43 and to the discussion of our findings with Mr. D. C. Hintz ano others at the conclusion of the , inspection. ! The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective i examination of procedures and representative records, observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during the course of this inspection. In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele- phone within ten (10) days from the date of this letter of your intention i to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this lett sr 1t written application to this office to withhold such information. If your receipt of this letter has been ! delayed such that less than ses9n (7) days are available for your review, E . 1 82033!0253 820315 PDR Ab3CK 05000305 k 0 PINT l
_ _ _ _ _ _ _ _ _ _ _ _ _ _
, FAR 15 C32 Wisconsin Public Service 2 Corporation l please notify this office promptly so that a new due date may be estab- lished. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should be withheld from public disclosure. This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit. If we do not hear from you in this regard within the specified periods noted above, a copy of this letter and the enclosed inspection report will be placed in the Public Document Room. We will gladly discuss any questions you have concerning this inspection. Sincerely, ' Original Signed by C.E. Norclius" C. E. Norelius, Director Division of Engineering and Technical Programs Enclosure: Inspection Report No. 50-305/82-07 cc w/ encl: D. C. Hintz, Plant Superintendent DMB/ Document Control Desk (RIDS) Resident Inspector, RIII John J. Duffy, Chief Boiler Inspector Stanley York, Chairman Public Service Commission I R RI R ' RIII fius Robinson /jp ackiw . n itt e 3/12/82 g%Y' [[fC ' /p{ @ }}